• Steel Ringlock Scaffolding Q235/355 Steel Galvanized System 1
  • Steel Ringlock Scaffolding Q235/355 Steel Galvanized System 2
  • Steel Ringlock Scaffolding Q235/355 Steel Galvanized System 3
Steel Ringlock Scaffolding Q235/355 Steel Galvanized

Steel Ringlock Scaffolding Q235/355 Steel Galvanized

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m.t.
Supply Capability:
10000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Ringlock Scaffolding 


Ring Lock system is the latest item up to now. It’s mainly used in ship building, ship repairing, stage building etc.It’s stable, easy-assemble, easy working, safe-using and with big bearing capacity.

Steel Ringlock Scaffolding Q235/355 Steel Galvanized

Main Features of the Ringlock Scaffolding


Place of Origin

Beijing, China (Mainland)

Product Name: 

Ringlock Scaffolding

Custom Code

7308400000

Color

Silver, golden

Surface treatment

Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating

Material

Q235,Q345.etc

Package

Customized Package

Payment Terms

T/T,L/C

Delivery Detail

15-25 Days

Quality Control

IS09001 Certification, Quality Test

Standard

48.3*3.25*4000mm 

Ledger

48.3*3.25*3072mm

Ledger End

1.2kg


Advantages


1)To be erected easily and quickly

2)Installed to different angels with rosettes of

    two different hole being positioned there

3)Ringlock scaffolding provides complete flexibility to lock in any angel.

4)Diagonal braces are to be tailored in 

  accordance with the lengths of vertical and horizontal tubes


Product Show

Steel Ringlock Scaffolding Q235/355 Steel Galvanized

The modular RINGSCAFF system is characterised by the standardised, fast and simple assembly outlined above.
These procedures are continually repeated in the assembly of the scaffold.
In this way, as many as four ledgers and four diagonals can be attached to one ring! This creates a connection point which can bear very heavy loads.


 

Steel Ringlock Scaffolding Q235/355 Steel Galvanized

Steel Ringlock Scaffolding Q235/355 Steel Galvanized

Steel Ringlock Scaffolding Q235/355 Steel Galvanized

Specification of Ringlock Scaffolding

Steel Ringlock Scaffolding Q235/355 Steel Galvanized


 

The Standards(Verticals)

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

3000

3/3.25

48

HDG/Painted

2500

3/3.25

48

HDG/Painted

2000

3/3.25

48

HDG/Painted

1500

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

500

3/3.25

48

HDG/Painted

 

The Ledgers(Horizontals)  

Effective Length(mm)

Tube Thickness(mm)

Tube Diameter

Surface Treatment

2000

3/3.25

48

HDG/Painted

1770

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

The Diagonal Brace

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

2411

3

48

HDG/Painted

2244

3

48

HDG/Painted

The bracket

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

730

3

48

HDG/Painted

Plank

Effective Length(mm)

Width(mm)

Height(mm)

Surface Treatme

2050

480

45

HDG

1820

480

45

HDG

3000

240

45

HDG

2000

240

45

HDG

1000

240

45

HDG

Hollow Head Jack And Jack Base


Length(mm)

Tube Diameter(mm)

Size of Plate(mm)

Surface Treatment


600

38

150*120*50*4

HDG


600

38

150*150*4

HDG

Steel Ringlock Scaffolding Q235/355 Steel Galvanized

Steel Ringlock Scaffolding Q235/355 Steel Galvanized












Q: Wankou scaffolding steel scaffolding and look like? What is the difference
The steel pipe scaffolding is composed of fasteners and shelves, each of the shelves are connected with the fastener
Q: What is the bowl buckle scaffold operating layer
It is divided into single and double scaffolding, double row with landing and cantilever type. Single row are generally used for landing. Its main function is to protect. Specific reference to JGJ 1302011 "construction fastener type steel pipe scaffolding safety technical specifications" in the relevant instructions, and illustrations.
Q: Is there any reason why you shouldn't?
They will have a shorter life than decking as they won't have been pressure impregnated. But a very good idea, though. Treat it with Cuprinol (if you have a local, friendly timber yard they might have a pressure impregnator and then you're laughing.)
Q: left end. What is the Tension in EACH wire??can anyone help
And you asked this physics question in the math section of answers because? Let Tl and Tr be the tensions in the left and right wires. We are told the weight of the box is W and that the scaffold is weightless.
Q: I got my scaffolding piercing today, inevitably it's sore,but do i clean it like you would clean normal piercings with salt water?also how long before i can turn the bar?and how long before i can change the bar?Plus. it hurt so much haha
I got mine about a month ago, but i thought after about a week it didn't really hurt no more and i could rotate it and more recently i can move the bar up and down with no pain. I don't know how long till you can change the bar because i want to change mine because it don't hurt no more, am going to pop into the shop and check. And i didn't clean mine with salt water i got a cleaning solution when i got it pierced and also my piercer gave me a bottle of antiseptic skin paint which i put on twice a week before i go to bed and it is men to help the piercing heal
Q: manufacturers recommendation for assembling Web-Tex 8' Scaffolding
you can also search the inter for the best supplier of that product......
Q: I've had my industrial piercing for about 6 months, about 2 months after I had it done I thought it was healed and stupidly changed the bar to a cheap on I bought off ebay. BIG mistake I know, it got infected and I was put on antibiotics. It's been healing well for about 3 months now, but how long roughly will it take to fully heal?
It really does depend on the person i've had mines since last year January and mines still didn't heal but that's because i changed my jewelry too quick but just have patience plus its a bar connected to 2 holes so yea its going to take some time especially if you hit mistakenly or if you wash your hair a lot like I do with shampoo but try to use h2ocean it makes your piercings heal faster
Q: this is the excerpt-We have witnessed a people [Muslims] to each and every one of whom death is preferable to life, and humility to prominence, and to none of whom this world has the least attraction. Their leader is like one of them: the low cannot be distinguished from the high, nor the master from the slave. And when the prayer time comes, all wash their hands and feet and humbly pray.QUESTION: How does this writer describe the Muslim people?Sorry i know this is my homework i just need help analyzing it. Is the writer describing them as unliked people? or people he respects?
It seems like he is describing them like he respects them. He is idolizing their humility and pride. Is DBQ a Document Based Question? just wondering, if you are in APH, good luck! :) Addition: I found your post responding to this one. lol Hopefully this helped! I remember those DBQs, kinda a pain. lol....but it was a fun class and it is well worth taking!
Q: A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold. If the plank's mass is 20kg , how close to the left end of the plank can he stand without tipping the plank? ( The scaffold supports are 2.5m apart, and the plank extends beyond the scafold supports, 1.5m on each end.)
The mass of the plank on the left side of the scaffold is: M? = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L? = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T? = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M? = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L? = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T? = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T? = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q: What are the components of the bowl buckle joint in the bowl buckle scaffold
Composition formA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords