Steel Coupler Rebar Steel Tube Made in Tianjin China under Good Price
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1500 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Scaffolding Tube High Quality
1.Description of Steel Coupler Rebar Steel Tube Made in Jiangsu China Good Price:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Steel Tube Made in Jiangsu China Good Price:
Advantages of Cut and Bend Services
Rebars are cut and bent to exact specifications, ensuring precision and consistency.
Cut and bend reinforcement bars do conform to BS 8666.
Material wastage is controlled and reduced.
Lesser on-site labour is required.
Better utilisation of on-site space, logistics and reduction of inventory on-site.
In-house processes and procedures that ensure traceability down to the order level
Weather independent
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Steel Tube Made in Jiangsu China:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
6.FAQ
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q: Standard for inspection of portal scaffolding
- The 1.2 Standard Specification for steel portal frame and accessories: vertical rod and the transverse diameter: 42.7 + 0.5 mm with an average of 42.9 with a wall thickness of 2.5 + 0.3 mm with an average of 2.45 cross brace: outer diameter of 25 + 0.5 mm with an average of 25.4 with a wall thickness of 2 + 0.3 mm average for 2.3 1.3 door frame and accessories the steel pipe and plate, the welding meets the conditions, allowing the use of the mechanical properties of Q235 steel are made of Q235 steel or better material; when using the tensile strength and yield strength of Q195 steel is low, without affecting the connection and construction conditions, allows for increasing the thickness of the way to make up for the strength the lack of.
- Q: HELP me out please. im struggling with this book
- I dont think she explained the rose bush very well. i think that it refers to Good and bad. Good being the rose and bad being the thorns Hester said in the book that she picked Pearl off a rose bush. Hester loves pearl but also fears her
- Q: The bottom of the cantilever scaffold must be provided with the sweeping rod
- Product quality certificate and inspection report. Rust must be replaced, not to be used to build the frame.
- Q: Write a scaffold method for 743,425 divided by 365EASY 10 points
- use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
- Q: First of all, is it painful? Obviously it will be painful I know, but is it severe?Also, what cleaning solutions/products do I need to minimise the risk of infections?And what type of bar should I get? I've heard that Bioplast and PTFE allow for better flexibility and therefore quicker healing, but wouldn't a flexible bar lead to mis-alignment on the two pierced holes? If this is so, what types of steel are safe for initial piercings?Thanks c:
- Ask how long they have been piercing and what certifications (if any) they carry, additionally verify close by regulations to ascertain if any are required. additionally ask how generally they spore verify their autoclave and while it grew to become into accomplished final time. Ask to ascertain a portfolio of HEALED piercings, exceptionally pictures of in spite of piercing you try to get.
- Q: What is rolling scaffolding?
- Scaffold (pipe staging) that has wheels in the legs. Any metal scaffolding that you've seen can be fitted with wheels to make it mobile.
- Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- General price of 3800-4200 yuan per ton, you need to see the material and specifications.1. Scaffolding steel pipe material Q195, Q215 or Q2352. Scaffolding steel pipe specifications of 3, phi, phi, phi, phi, phi, phi, 2.5, phi = phi, phi, phi, phi, phi, phi, phi, phi, 3.25, Phi3. Scaffolding steel pipe length of 1-6 meters, half a meter specifications can be customized according to customer specifications4. Scaffolding steel pipe standard SY/T5768-95 GB/T3091-2001
- Q: Scaffold removal should comply with those requirements......
- Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
- Q: three examples of scaffolding, thanks
- As long as you're on the internet, why not just Google examples of scaffolding rather than expecting someone on YA to do your homework for you?
- Q: improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
- I believe that you have covered it all. Improper handling covers my first thought; workers carelessness by not following safety guidlines
Send your message to us
Steel Coupler Rebar Steel Tube Made in Tianjin China under Good Price
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1500 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords