• Skid Steer Loader with CE& ISO 9001 System 1
  • Skid Steer Loader with CE& ISO 9001 System 2
Skid Steer Loader with CE& ISO 9001

Skid Steer Loader with CE& ISO 9001

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Skid Steer Loader with CE& ISO 9001

Product Details

Basic Info.

Model NO.:800D

 

Type:Skid Steer Loader

Walking Mode:Wheeled

 

Certification:CE, ISO9001: 2000

Condition:New

 

Color:White

Engine Model:Xinchai A498bpg

 

Export Markets:Global

Additional Info.

Trademark:WECAN

 

Packing:Nude Package; 2PCS/20CTN

Standard:CE, ISO9001

 

Origin:Shandong, China

HS Code:8429510000

 

Production Capacity:600PCS/Year

Product Description

 
800D Skid Steer Loader with CE& ISO 9001

1)China Engine
2)Original Imported Sauel Pump
3)Mechanical AUTO Leveling
4)SPECIAL Big Aluminium Radiator
5)Original Imported Sauel Motor

Model
Item
800DModel
Major
800D
Engine modelXinchai
A498
Overall operating height (mm)3850
Bore×stroke (mm)98×105Height to bucket hinge pin (mm)3225
Rated power (kw)45Height to top of cab (mm)2070
Rotating speed (rpm)2500Height to bottom of level bucket(mm)3065
Number of cylinders4Overall length without bucket (mm)2538
Max. Torque (n.m)193Overall length with bucket (mm)3345
Displacement (L)3.168Dumping angle at maximum height (°)42
Max. Speed (km)11.2Dumping height (mm)2445
Vacuum tire10-16.5Dumping reach (mm)585
Operating load (kg)800Rollback of bucket on ground (°)31
Max. Loading (kg)1400Rollback of bucket at full height (°)86
LiftingRadialWheelbase (mm)991
Bucket lifting force (kN)15Ground clearance (mm)210
Arm lifting force (kN)13Angle of departure (°)30
Total cycling time(s)10.2Turning radius front without bucket (mm)1380
Bucket capacity (m³)0.47Front turning radius (mm)2027
Pressure of working system (bar)160Rear turning radius (mm)1527
Rated flux(L/min)63Rear axle to bumper (mm)981
High flow flux (L/min) (optional)---Tread width, centerline to centerline (mm)1465
Fuel tank capacity(L)79Width between outside of two wheels (mm)1730
Self-weight with bucket (kg)2920Bucket width (mm)1800

Skid Steer Loader with CE& ISO 9001

Skid Steer Loader with CE& ISO 9001


Q:hey guys ive been running thru various sites trying to make a name for my band jus have pieces at the moment like jus an idea to start from something like The ______ or add some words like monastery / cathedral that sounds cool or cidade de deus :p ( what would city of angel or some cool name be in that language? plz suggest some cool name in english or something that sound cool or gimme some link i can use to grab some nice names, thanks :)
Hmmm. okorder that has thousands of them. There's also a random band name generator too, if you get desperate. Oh, and a good idea is to click the random article link on Wikipedia. Anyway, I hope you find a name for your band. I'm pretty much in the exact same situation right now, but I have a few choices.
Q:ok here it is when you have an old horse and it passes away what do you do?do you call the police? how do you move it?what if you want it cremated?=-[ its a sad question but i need to know thank you
In most areas, you're not allowed to bury them. If you have a big place (>10 acres) many people do that anyway, but it's hard to find an excavator who will do it for you. Call around; ask your horsey friends. Here, it's around $250-$350. Cremation in my area (Ohio) costs $1200, plus you have to pay to get the horse there ($250+mileage). Most horses end up hauled away to landfills ($250+tipping fee, for private parties). I know it sounds ecologically awful, and I truly agree it is, but that's the sad reality of it. The vet can usually give you a number for someone to haul it, but most won't give you an excavator because it's not strictly legal. They may or may not know of a local cremator. I'm really sorry you need to know this. I hope you're doing it in advance, because it's really, really hard to handle when you're in the midst of things, so to speak. Edit: You're not allowed to bury them because the process of decomposition is likely to contaminate the water table. Drug residue is a smaller problem as only trace amounts leak out, and are diluted quickly. If you do bury them, make sure they're not near/uphill from a well, watercourse, or other ecologically sensitive area. If the horse has been euthanized, don't leave it on the back 40 - the euthanasia solution remains lethal, and any coyotes, buzzards, bears, etc., that eat it will die. If an endangered animal like an eagle gets at it and dies, you may find yourself in a heap of trouble.
Q:What are the manufacturers of excavators in Shandong?
Shandong excavator production manufacturers a lot of ah, like Komatsu, leiwo, temporary workers, mountain reconstruction machine, heavy truck excavator, sea Takeuchi, hunter, too much.
Q:Has anyone tried it? Is it a fun substrate? Is it easy to mold into shape? Can I use it for my two baby leopard geckos? How many bags would work for a 30 gallon terrarium? Why can be used if I don't want to use balloons for molding? Water bottles maybe? What else?
I would use what u r comfortable with if it is for reptiles and says safe for rep tiled and ur kind of lizard then it is ok to use especially if the leopard geckos picture is on it. I wouldnt make it i would just buy the thing or something like it it may not work the way u want it to and can turn into a big project.
Q:I have a jd 190E excavator, my right side tracks came off on the front. After several hours, and a few guys I still can not seem to pull it back on. Any suggestions
I would give bigpapa a thumbs-up if I could. That's exactly what to do.
Q:We hired an excavator. PD $1500 cash first day then check for $2000. Then $600 cash for jack hammer. He was 3/4 done. Asked for remainder to pay his employees. Husband wrote check. Excavator booked. Won't return calls. Check bounced accidentally. Don't think we should pay til job done. Are we liable for paying cuz check bounced? Is it considered a crime on our part?I thought god was looking outfor us ssince they didn't finish job.thanks
Technically it's not a crime unless you knew the check would bounce (at least in Illinois). You may have an affirmative defense in paying the check because the work wasn't completed. You're gonna need a lawyer. Good luck.
Q:I was just curious. Let's say I kicked a Rite of Replication to make 5 copies of the Halimar excavator. How many cards would that mill out? (assuming there is just a halimar excavator on the field to begin with.) Then let's say I twin casted the Rite of Replication how many cards would that mill out then? Assuming the same cards were out.
Five Allies are coming into play. Each will trigger their own ability, and each will trigger off the others as well, so each of them is triggering five times. In addition, the original Excavator triggers five times (assuming it's the same player controlling both the Excavator and the Rite). So you have six Excavators, each triggering five times, for a total of 30 triggers. When each resolves (assuming nothing happens to any of them in between), they count six Allies and mill six cards, for a total of 180 cards milled. Twincasting the Rite is a little different (obviously). When the Twincast resolves, it makes a copy of the Rtie. The copy resolves and all the above happens - 180 cards milled. Then the original Rite resolves and five more Excavators come into play. So now you have eleven Excavators, each triggering five times, each milling eleven cards, for 605 cards milled. So you get a grand total of 785 cards milled if my math is right. Which, frankly, seems like just a teensy bit of overkill.
Q:Which one was first to form in our planet - the iron or the stone?I watched one engineering show on TV about making a tunnel under water (no under the Lamansh one) and they said that, the stainless steel claws of the excavation machine broke several times before they could dig through the lime stone.So I thought If the stone is harder than metal, then is it just a question of atomic density? and which was first to form in the beginning?
Although the excavator claws broke, that does not mean the stone is harder, just that the repeated impacts caused metal fatigue and cracks in the claws. Cosmologists currently believe that all the elements and compounds that make up the earth were uniformly present in the dust cloud that it condensed from. Worked iron and steel are newer than the iron compounds they are refined from, and consolidated limestone and sandstone are newer than the particles they are aggregated from, so it's not clear that either of them could be said to have formed before the other.
Q:Is it true that as a miner you can get a lawyer for free in North Carolina?
No, that only works if your occupation is excavator or tunneler.
Q:How much is the farm mini excavator on the site?
This model comes in many different sizes and varies in price. From more than 7-20 million, import more and more, oh, I suggest the lynx micro excavator can also, the price of 10-15 in case of taiwan,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords