Six masts aerial working platform(lower-storage)
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Code | GTWY-16-VI | GTWY-18-VI | GTWY-20-VI | GTWY-22-VI |
Work height(m) | 18 | 20 | 22 | 24 |
Platform height(m) | 16 | 18 | 20 | 22 |
Carrying capacity(kg) | 150 | 150 | 150 | 150 |
Storage length(m) | 2.00 | 2.00 | 2.00 | 2.00 |
Storage width(m) | 1.25 | 1.25 | 1.25 | 1.25 |
Storage height(m) | 2.0 | 2.0 | 2.18 | 2.18 |
Platform length(m) | 1.85 | 1.85 | 1.85 | 1.85 |
platform width(m) | 1.00 | 1.00 | 1.00 | 1.00 |
Guardrail height(m) | 1.1 | 1.1 | 1.1 | 1.1 |
Supporting leg size(m) | 3.40x2.90 | 3.60x3.15 | 3.60x3.15 | 4.00x3.60 |
Voltage(v)ACxDC | 220/v | 220/v | 220/v | 220/v |
Electricity machine pressure(kw) | 上台1.5kw | 上台1.5kw | 上台1.5kw | 上台1.5kw |
下台3.0kw | 下台3.0kw | 下台3.0kw | 下台3.0kw | |
Up/down speed(m/s) | 0.18/0.30 | 0.18/0.30 | 0.18/0.30 | 0.18/0.30 |
Machine-weight(kg) | 1800 | 2000 | 2200 | 2400 |
Also can choose driving wheel(will charge plus) | ||||
Total machine length will be increased 0.38m,total machine weight will be increased 200kgs after match with driving wheel. |
- Q: What about the heat treatment of the lifting platform?
- Servo feed system stability is the most basic condition to work, especially when low speed feed does not produce "crawl", and can adapt to the change of the external loads and does not produce resonance. Stability is related to system inertia, rigidity, damping and gain. The life of the feed system, is mainly refers to keep the transmission accuracy of nc machine tools and positioning accuracy of the length of time, namely the transmission parts's ability to maintain its original manufacturing precision, therefore, should be a reasonable choice material, heat treatment and machining process to the transmission parts, and adopt suitable lubrication method and protective measures, to prolong life.
- Q: What can be done when the hydraulic platform is down?
- The left and right sides are connected by wire rope, while the other side is synchronized.
- Q: What is the reason for the automatic lowering of the hydraulic platform
- The hydraulic lift can rise steadily or maintain position because of the pressure oil in the cavity.
- Q: The characteristics of hydraulic platform
- Hydraulic lifts and elevators are both elevations, but the biggest difference is the journey. The advantage of hydraulic lift is smooth, especially in the initial end of the lifting, but again good hydraulic elevator also amounted to less than 10 m or a few meters, and the elevator is similar to hoist, well make up for the disadvantages.
- Q: The single fork hydraulic lift platform
- Did this problem simple, 1 is installed support valve, 2 if supported hair that is inside the valve body is dirty, 3 is the relief valve to have stuck inside, 4 support electromagnetic valve core have stuck inside, taixing new energy of hydraulic machinery factory
- Q: How is the lifting handle of the universal knee-milling machine very tight
- You're talking about a tight lock or a handle.I hope my answer will help you.
- Q: How is the small electric shearing fork lift designed
- classification The shear fork platform is divided into: movable, fixed and tractive. Mobile platform elevating power is manual or electric, the product structure is firm, the mobile is flexible, the elevation is stable, the operation is convenient, carrying weight is large and so on. use Pull-type elevating platform adopts foreign power do drawing, using three-phase power supply or diesel engine for power, move fast and convenient, suitable for long distance operation, it is mainly used in oil, electricity, urban construction, post and telecommunications industries field aerial work.
- Q: What happened to the rise and fall
- The first possible reason is that the voltage is too low to check the actuator potential of the motor load. The voltage fluid range allows for a plus or minus 10% of the motor to not inspect the two phases of the three-phase line of the motor and circuit motor.
- Q: How do I design this hydraulic lift?
- Do you do it by yourself or by design? I can give you a simple composition on qq1140283127, but I can't stick it
- Q: What should the chain's main elevator be aware of when installing the chain
- The rail link elevator usually requires a design pit. For equipment and the ground level factors, design should be carried out in accordance with the actual demand design pit size, at the same time when the production equipment shall be carried out in strict accordance with the size of the pit production.
Send your message to us
Six masts aerial working platform(lower-storage)
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches