SHANTUI Excavator (SE210)
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product features
The SE210 makes the leap to our powerful mid-range of excavators. It offers an imported Cummins (B5.9-C) engine that provides a reliable and powerful plant. Shantui’s body design makes maintenance convenient with easy-access points.
The SE210 model features imported hydraulic parts, negative flow and electronic controls. It is a high-
efficiency machine due to its state-of-the-art functions of boom confluence and diffluence, swing priority and flux regeneration.
Engine model: Cummins B5.9-C
Rated power: 112 kW/1950 rpm
Operating weight: 20.5 t
Bucket capacity Backhoe bucket 0.9 m3 (SAE)
- Q:ok I know i have seen this question before but everyone keeps comparing it to sand. Well after this stuff dries it is solid and not like loose sand at all. So i guess my question is has any one used this and have they had any problems with it? The guy at the pet store swears by it but i am always a little leary about taking in their opinion on anything as they just want to sell me stuff (although he did let me feel the floor of one of the cages he had it in and the stuff really does dry as hard as a rock) Any help would be appreciated
- I'd be cautious that any loose grains could get ingested and cause a blockage in the intestines. I wouldn't use it.
- Q:Bench tested altinator,it's good,new batteries,new belts,checked fuses, still only 24.8 volts at the batteries.Should be around 28 volts with engine running. Display in opperators cab reads quot;charging problemquot;. Is there a relay I don't know about?
- yes yu may have an external regulator fitted , some times its under the seat , maye be elsewhere , might be near fuse box , should be bigger than a normal relay , will have alt written on it , probably black and plastic , yu can try and call dealer parts section and ask them if there's one on yur machine , yu will need serial number of coz , if its imported serial number wont be any good , is the charge indicator light on the control panel working , did yu check the fuses ?........ move them around in case there's a corroded connection , how many wires on back of alternator ?.......should be big red one , and at least one small one ( signal wire ) make sure this is ok , make sure wiring harness from engine to chassis is ok , yu might find wiring diagramm on internet , this will show external reg , are there any small wires connected to the big ht ( high tension ) wire on the battery ?.......is there an inline fuse fitted there ?? .....is corrosion a problem with any part of the harness ? dont be afraid to cut open the harness with a box cutter knife if yu think yu have a problem , its ok it wont bleed , just retape back together in a proffesional manner when checked out ,
- Q:I have dreams about bridges. Somebody tried to transport a excavator across a stone bridge in my dream and the bridge collapsed. I need to learn to dream walk to put it back together. It is VERY important to the safety of the United States. It has something to do with the plates of Joseph Smith so any shamans who can show me how to dream walk would be appreciated, thank you.
- What exactly are you asking? To re-enact the dream (so you may continue it) or to actually dream walk? The first one, may be able to be done The second, IMO, not everyone can. Doesn't matter how many years you've practiced it. Either you have the *gift* or you don't. And to answer your question, it is very tough to show you *how*. Please research it, you'll know what I mean then :)
- Q:How many meters is the height of the PC-320 excavator?
- PC78US-6NO machine parameters: weight: 6.85 tons bucket capacity: 0.28 cubic meters power (KW (PS) / whole height G:2.75 meters, upper frame width H:2.33 meters, climbing capacity: 35 degrees digging force: 38.8
- Q:Since technological innovation is bad according to Dear Leader, should he drop a trillion on spoon ready jobs? Think of all of the jobs that would create, a bunch of union hacks digging holes with spoons.
- The national debt was well over one trillion dollars far before Barack Obama took office. It is unfair to blame it on him simply because he is the current president.
- Q:what type of toys baby boys will likes?
- They do like basically vehicle types toys. Specially excavators, bull dosser, trucks and lorries
- Q:Is it true that as a miner you can get a lawyer for free in North Carolina?
- No, that only works if your occupation is excavator or tunneler.
- Q:can i use this in a wooden terrarium for my leopard gecko and have plastic wrap on the bottom and sides of the tank so it does stick?
- Oof. Take that crap out, oh lord he might be crying inside from th e noise. Take out the plastic wrap and put paper towel in for substrate, much easier and better for the gecko in general. Or sand if your careful about compaction.
- Q:Lol what did the vanity digger play wild Lord?
- What is vanity digger? The new excavator? Don't tell me it's an empty predator, master W, vice Q and E will do, vice Q will hurt high, and vice E will be mobile
- Q:so i was out in the middle of the woods and saw this hitachi excavator; ZAXIS-3 series Short rear-end swing versionanyhow i started it for fun. then i tried turning the key off and i took the key out and it wouldn't turn off the engine it kept going. so i tried everything with turning the keys and i tried taking off the batteries but they are locked in this door thing so i can't get to them. how the hell do i turn this thing off. i found an emergency shutoff switch but it was broken.how long can it idle before something happens. will it blow up after a week? or run out of gas (it had a half a tank left)
- Too Funny, Personally I'd just let it run till it ran out of fuel, teach the idiot that left it there with the keys in it a lesson, But to answer your question it will run till it runs out of fuel weather it be 6 hours or 6 months, or till a mechanic gets there and figures out what some dumbass operator has done to disable the fuel shutoff solenoid, If you want to be a real pain in the @$$ behind the seat is the fuse panel, pull all the fuses, if that doesn't shut her down the dumbass operator has this poor thing rigged in such a way its best if it were just burn to the ground, guys a hazard to himself and anyone working around him. the fact the emergency fuel shut off is broken tells me that. Oh and if you want it to run out of fuel faster give it full throttle, wont hurt the engine at all, that's how it was designed to run
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
SHANTUI Excavator (SE210)
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords