self propelled telescopic boom lift GTBZ26/28
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Brief Introduction
CE self propelled telescopic boom lift GTBZ can drive flexibly and freely, with wide working scope and high efficiency. Hydraulic motor realize 40% gradeability through planetary reduction box. Telescopic boom and cylinders are protected with dust proof jacket to prevent dust in. The round glossy shape boom and chassis is not easily dirty with dust. Length and angle of boom are monitored real time by length sensor and angle sensor. Protection level of electrical system is above IP65. With great outreach, the boom lift can work in large scope continuously. 2 wheels drive and 4 wheels drive, 2 wheels steering and 4 wheels steering are optional. It is especially good for shipbuilding, ship maintenance, building construction, steel structure fixing, and bridge construction and so on.
Specification
Model | GTBZ26 | GTBZ28 |
Size | ||
Max. working height (m) | 28.2 | 29.1 |
Max. platform height (m) | 26.5 | 27.4 |
Horizontal reach (m) | 24.2 | 25.1 |
Length - stowed (m) | 11.4 | 11 |
Width stowed (m) | 2.5 | 2.5 |
Height stowed (m) | 3.05 | 3.05 |
Platform Length (mm) | 1800 | 1800 |
Platform width (mm) | 760 | 760 |
Platform Height (mm) | 1170 | 1170 |
Axle base (m) | 3.2 | 3.2 |
Ground clearance (mm) | 370 | 370 |
Performance | ||
Lifting capacity (kg) | 270 | 230 |
Platform rotation | ±80° | ±80° |
Turntable rotation | 360° continuous | 360° continuous |
Turntable tailswing radius (mm) - wheel retracted | 1315 | 1315 |
Turntable tailswing radius (mm) - wheel extended | 915 | 915 |
Drive speed - stowed (km/h) | 7.2 | 7.2 |
Drive speed - extended (km/h) | 1.2 | 1.2 |
Gradeability | 40% | 40% |
Turning radius - inside (m) | 7.2 | 5.25 |
Turning radius - outside (m) | 8.45 | 9.3 |
Controls | DC proportional | DC proportional |
Telescopic method | In sequence+ | In sequence+ |
Tires size | 385/65-22.5 | 385/65-22.5 |
Power | ||
power source | Perkins 64kW | Perkins 64kW |
Voltage | 12V | 12V |
Hydraulic oil volume (L) | 280 | 280 |
Fuel oil volume (L) | 126 | 126 |
Machine weight (t) | 17.4 | 17.5 |
- Q: What type of construction machinery does bulldozer belong to?
- As the name suggests is a scraper shovel and transportation!! in the soil where the scraper shovel go on his "stomach", most walk 500 meters to 2000 meters of the soil and then unloaded, put in place to go!! the loader vehicle or other equipment for loading self-propelled bulk handling machinery material. The loader can also do minor excavation work by changing the corresponding construction machinery
- Q: I always wondered if nerves sent signals to our muscles, if someone lost a leg or an arm, is it theoretically possible to attach someone's nerves to machinery and control it like a limb?
- There are already artificial limbs that work on that principle. Electrodes on the skin pick up signals from muscles in the limb stump or elsewhere on the body, and those are used to drive actuators in the limb. The technology is fairly basic at the moment - just a few movements can be controlled - but it will probably get better. It would be nice if we could attach directly to the nerve bundles in the arm or leg because there are thousands of motor nerves in there. The big problems are infection, stopping the nerve dying, and the body rejecting the electrodes.
- Q: how can i find Industrial machinery in Germany?
- What do you mean? Buying some? Looking on some? Which machinery? Specify your question, and contact me thus I check this thread again.
- Q: It's subject is World World I and the Roaring 20's.
- Automation is I believe the term you're looking for. Though I don't know how to relate it to WW1 and the post-war period.
- Q: Big mechanical engineering machinery, or other, the bigger the better
- There are TC2000300 tons of car out of West Germany (flower, crane boom and counterweight need another crane assembled). Steel structure workshop general domestic hoisting crane most commonly used, but must calculate the crane position and radius of gyration. There are 200 tons of motor cranes in Japan in recent years, telescopic rod, fully self-propelled.
- Q: I want to start export machinery spares parts from India. I don't know how to start? I did some research sent some email to foreign company but nobody replied..?? Please guide me step by step process. 1. How to approach foreign traders/foreign importers?2. How do I market my company?3. What are the legal procedure to export from India?4. What is market position for exporting machinery spare parts from India?
- Go to your board of trade in your community,importing Exporting the canadain goverment has booklets,when you dealing with another country you have to register your bussiness thats,insurance,bondable,frieght insurance,and the person that can help you is a custom broker there in the yellow pages,and you would have to look upindia custom,there tarrifs,its a lot but my suggestin is look for gov help,look on web site exporting products
- Q: wolframite is a tungsten ore
- I could not locate machinery specific to wolframite or tungsten, so presume that they are mined the same way that other underground metals are. Equipment would include drills to make holes and break up rock and loaders to carry the rock away. You would also need support systems for tunnels and lights and safety equipment for the workers. Processing is done in a handful of places in the world--again I found only generalized descriptions of the process. The websites listed below are of some help.
- Q: Cost of construction machinery use fee
- Repairs: refers to construction machinery in accordance with the provisions of the repair interval shift necessary repair, to restore the normal function of the cost. Shift repairs (= a repairs overhaul X times) the total number of classes often 83019 durable repairs: refers to all levels of construction machinery repair maintenance in addition to outside and temporary troubleshooting costs.
- Q: methods of attaching condition monitoring of machinery?
- Your question is too vague to even attempt an answer. What type of machinery are you monitoring? What parameters of said machinery do you want to monitor - temperature, broken tool, air hydraulic pressure, motor current, vibration...etc., on and on. Please clarify what you are asking so that we can attempt to give you a reasonable answer.
- Q: I ve been going to school for HVAC for about a month now. And I was just wondering if anyone had any tips on reading schematics or wiring the machinery up. ( besides make sure the power is off) Each day I get it a little more but I was just wondering if any experts had some tips. Also how is the pay when you get out of school? Please don't tell me to go to salarey I just wanted to know for someone with 1st hand experience. I live in Ma. Thanks in advance
- make friends with some one in the drafting department. part of drafting is drawing electrical drawings. a good hvac man with some experience can write his own ticket in any town. be patient......you wont get to the top in a week....it takes time. Possum, hvac guy
Send your message to us
self propelled telescopic boom lift GTBZ26/28
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords