Self-propelled Telescopic aerial work platform (45meter)
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Self-propelled Telescopic aerial work platform (45meter)
Maximum Lift Capacity:450KG
automatic leveling MODEL GTZZ45Z Working height maximum * 47m Platform height maximum 45.3m working radius maximum ** 24.5m lift capacity 230kg length (stowed) 13.04m width 3.9m wheel base 3.9m ground clearance-center 430mm platform measurement 2.44*0.91m turning radius-inside 4.13m turning radius-outside 7.02m travel speed(stowed) 4.4km/h travel speed(raised or extended) 1.1km/h gradeability-stowed 40% solid tire 12.00-20 swing speed 0~1/3rpm turntable swing 360° continuous platform rotation ±80° fuel tank capacity 151L Total weight 21000kg voltage 24v drive & steering type 4*4*4 engine cumminsB3.3-C80 rated power 60kw/2200rpm
- Q: I have an assignement where I have to explain how ribosomes in plant cells are equivalent to a machinery in a city.I understand the concept and the general idea, but I don't know how to word it out and explain it clearly.Any ideas?Thanks!
- ribos keep the body moving and working, just like machinery in a city. it takes the garbage truck picking up the trash, delivery trucks bringing in fresh produce, police cars keeping the peace, construction machinery building new structures and so on so the city continues to function as a whole. when one piece of machinery breaks down it causes a chain reaction that affects thru out the city. same goes for your mind and body. good luck
- Q: I am a manufacturing engineering technology and a mechanical engineering double major and am wanting to know how I can go about designing and building automobiles, ships, or heavy construction machinery. What kinds of companies should I be looking at? and what qualifications should I be shooting for?
- No individual can design and build automobiles, ships, or construction machinery. You can be a specialised member of a team to design parts of automobiles, ships, or construction machinery.
- Q: The machinery will be depreciated over ten years using the double-declining balance method. If depreciation is computed on the basis of the nearest full month, Foley should record depreciation expense for 2007 on this machinery of $20,800. $20,400. $20,550. $20,933.
- Assume the machine useful life is 10 years Double-declining-balance method Rate: Double of straight-line rate 100%/10=10% x 2 =20% Depreciation Expense: Year 2006: $120,000 x 20% =$24,000 (whole year) $24,000/12=$2,000 (every month) There are only 8 months (May-Dec.) $2,000 x 8 = $16,000 Year 2007: ($120,000-16,000) x 20% = $20,800 Unlike the other depreciation methods, salvage value is ignored in determining the amount to which the declining balance rate is applied. Depreciationn stops when the asset's book value equals expected salvage value.
- Q: Application of lean production in construction machinery
- With the increasing complexity of construction machinery, its maintenance costs are increasing, the dependence on maintenance is increasing day by day, and higher requirements for its reliability are also put forward. The current construction machinery maintenance exists in the maintenance range is too large, maintenance frequency is too high, too much inventory of spare parts and maintenance process optimization not "waste" phenomenon, in view of these phenomena, the lean thinking proposed a good solution.
- Q: How much money do you need to invest in construction machinery parts?
- Graphic design can not use such a high configuration, dual core heat dissipation is not suitable for long time design requirements, and this is not necessary. Single core P43. 06, of course, 775 stitches. Memory with 1G 533 is ok. Seven rainbow X1300 discontinued, you can use 7300GT 256M flames ares version.
- Q: i need to focus on the movement of machines and film them. such as car factories with arm robots, production lines, moving conveyabelt, anything relating to machines!!! please help.
- Set your camera up in front of your TV. Then, pop in any of the Terminator dvds.... I'm here to help. Just ask, kid.
- Q: How long is MOS school for a mechanic in the Marines? Heavy machinery?
- In the 80's, most mechanic MOS training was self paced with a 6-8 week standard. It may be different now. The reason being, the Marines want to make sure you grasp what you are training for. If it takes a little more time for some it will be worth it to have a well trained devil dog.
- Q: mine is bumblebee. he's the be
- Hot Rod, when he turns into Rodimus Prime!
- Q: The doctors were worried about his pancreas but say he is ok. He still feels quite bad after 1 month. Could his pancreas be more easily distressed with alcohol or just in general and could this cause him to feel light headed,nauseous and unwell
- Being light head in general is a sign he needs to talk with a doctor. he may be losing blood internally!!!
- Q: Engineering engines use those engines as power!
- Most of the Weichai engine engineering machine loader, has used the example of D6114, Xugong roller by D6114, also yuchai. The paver is the most widely used DEUTZ engine.
Send your message to us
Self-propelled Telescopic aerial work platform (45meter)
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords