Self-propelled aerial working platform PST300
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model | PST300 | |
Arm type | straight-arm | |
Working height | m | about 30.00 |
Platform height | m | about 28.00 |
Working radius(capacity 80kg) | m | about 15.70 |
Working radius(capacity 200kg) | m | about 14.00 |
Cage capacity | kg | about 200 |
Cage rotation angle | ° | 180 |
Angle of rotation | ° | about 450(noncontinuity) |
Platform dimensions(L*W*H) | m | about 1.2×0.8×1.1 |
Length | m | about 7.20 |
Width | m | about 1.58 |
Height | m | about 1.98 |
Outrigger size | m | 4.89×4.34 |
Pressure on earth(working) | Kn/㎡ | 2 |
Pressure on earth(traveling) | Kn/㎡ | 3.6 |
NW | kg | about 4200 |
Range of wireless remote control | m | about 100 |
Gradient ability | about 30% | |
Travel speed | km/h | about 1.5 |
Motor | Diesel+220V |
- Rubber track has little pressure on earth, it can travelon any ground, eg.marble floor
- The height and width of track is adjustable, it cantravel on any unevenness road.
eg. a muddy road
- Cage and forearm can rotate 180°
- 100M wireless remote control
- Small when it retracts,nimbleThe right of change specification and design is reserved
Optional configuration
- hook for hanging
- removable
lamp in the cage
- Cage protective caps
- Height limitator
- PVC outrigger pedal;
- plastic pedal;
- trailer
- Q: Does the fixed hydraulic platform need to submit to the specification requirement
- There is no clear regulation of hydraulic lift and hydraulic platform in China, which means that you can also do it without testing. Local regulations may be different. Also, if you check, you are going to the local quality and technical supervision bureau. Should go to the special branch to register, apply for installation, after installation is finished again ask them to check the acceptance of the check. There is a fee for it. And it will be checked every year.
- Q: What about the heat treatment of the lifting platform?
- The silk rods are generally used for the processing of the adjustment, and the semi-finishing process is a stabilizing stress treatment.
- Q: There is no easy way to push the goods when the platform is loaded.
- There are several rollers or balls on the workbench that can move from above, not knowing what you are doing. If necessary, a friend can leave a message.
- Q: How does a button in the PLC control the elevating platform
- To be safe, at least two buttons.I hope my answer will help you.
- Q: Operation and attention of electric elevating platform car?
- ?Gives you an explanation of the items of electric elevator: In order to ensure the use of safety and keep the machine in good working condition, the appearance performance check should be performed first. The inspection is as follows: Using the operating: A, the power cord is in good condition; B, the buttons are valid; C, oil pipelines, etc. D, the intersections of the intersections of the arm frame are fastened.
- Q: How does the elevator repair
- Professional personnel should not uninstall electrical appliances at will, in case of electric shock or mistake. The platform should be hoisted and supported when the platform is being repaired under the platform of the platform, so as to prevent the sudden descent of the platform, causing casualties. The overflow valve should not be adjusted arbitrarily. Every element in the hydraulic system works under pressure. Any adjustment of the overflow valve may cause the hydraulic system to operate improperly. There will be unnecessary damage to people, machines and things. In any part of the hydraulic system, the pressure oil must be unloaded first, lest the pressure oil spout and the table suddenly fall. Monthly maintenance A. Roller, shaft and bearing, oil cylinder pin shaft and bearing, arm hinge shaft and bearing, etc.
- Q: Diablo ii flame volcanic mission will not be able to jump
- Instead of letting you jump on the platform, let you jump across the plank on the side wall of the platform, which is used upstairs. Just go to the opposite side.
- Q: What should the chain's main elevator be aware of when installing the chain
- The rail link elevator usually requires a design pit. For equipment and the ground level factors, design should be carried out in accordance with the actual demand design pit size, at the same time when the production equipment shall be carried out in strict accordance with the size of the pit production.
- Q: What is the imported hydraulic platform car? Kneel and beg your help
- Why buy the importation, the price is expensive not to say, the quality is not same good to go where. There is also a bad reputation in China, like we are using the sea god's platform
- Q: What is the main shaft of the horizontal milling machine
- A kind of widely used machine tools, can be processed on milling machine plane (horizontal, vertical plane) and groove (key, T slot, dovetail groove, etc.), tooth parts (gear, spline shaft, wheel lovely, spiral surface (screw, screw groove), and various surface. In addition, can also be used for the surface of solid of revolution, inner hole machining and cutting work. Milling machine at work, workpiece loading on the worktable or dividing the first attachment, cutter rotating movement, accompanied by a table or milling head feed movement, the workpiece can obtain the required processing surface. Because the cutter is intermittent, and high productivity of milling machine
Send your message to us
Self-propelled aerial working platform PST300
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches