• SCAFFOLDING PIPE COUPLER ACCESSORIES System 1
SCAFFOLDING PIPE COUPLER ACCESSORIES

SCAFFOLDING PIPE COUPLER ACCESSORIES

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Thickness:
1.0 - 12 mm
Section Shape:
Round
Outer Diameter:
21.3 - 273.1 mm
Place of Origin:
Tianjin China (Mainland)
Secondary Or Not:
Non-secondary
Application:
Fluid Pipe
Technique:
ERW
Certification:
CE
Alloy Or Not:
Non-alloy
cetification:
BV,IAF,SGS,GB
name:
SCAFFOLDING PIPE COUPLER FOR STEEL TUBE
keywords:
scaffolding pipe coupler
Ending Type:
Plain ends or Cutting ect
Brand Name:
Reliance
Other Application:
Liquid and gas transportation
L/C at Sight:
Acceptable
Delivery Condition:
Bulk Vessel or Container
Category:
Minerals & Metallurgy-Steel Pipes
supply experience:
ten years
Grade:
Q235,Q345,Q195,Q215,Q195-Q345
Standard:
BS 1387,BS EN10296,BS 6323,BS 6363,BS EN10219,GB/T 9711.1-1997,GB/T 3091-2001,GB/T 13793-1992,GB/T3901,GB/T9711,ASTM A53-2007,ASTM A671-2006,ASTM A252-1998,ASTM A523-1996,API 5L,BS,GB,ASTM,API

Packaging & Delivery

Packaging Detail:packing in bundle with steel strips; Pipes with seaworthy package at the end could be done with your requirement.
Delivery Detail:Usually 15-30days after receipt of deposit , ASAP

Specifications

1.SCAFFOLDING PIPE COUPLER FOR STEEL TUBE
2.OD:21.3-273mm
3.WT:1-12mm
4.Length:5.8-12m
HIGH QUALIT

  SCAFFOLDING PIPE COUPLER

1.Details of black carbon steel pipe  

Product Name  SCAFFOLDING PIPE COUPLER FOR STEEL TUBE
Welding TechniqueElectric Resistance Welding(ERW)
StandardsASTM A53, BS1387, GB/T9711, GB/T3901
Payment TermsL/C at sight, D/A, D/P, T/P Western Union, MoneyGram acceptable, T/T preferred
Applicationgreenhouse pipes, scaffolding pipes, transportation the ocean oil and gas, mechanical tube of ocean platform, power station, chemical industry and building, construction foundation piles, steel structure building, for low-pressur fluid service, steel structure bridges etc.
Additional Fabracationplain ends pipe,cutting threading, beveled, 3PE steel pipe, black and color painting, anti-rusting oilsteel pipe, varnish paintingsteel pipe, zinc-coating steel pipe, steel stamp, drilling, diameter reducing pipe etc.
Supply Experience10 years
Business TypeManufacturer and Trading Company
Cooperation ShipownerMSK, CMA, MSC, HMM, COSCO, UA, NYK, OOCL, HPL, YML, MOL
Remarks
We can do unregular orders as customers requests!
All kinds of steel hollow pipes can be provided.
Don't hesitated to contact us.


Q:From the Scarlet Letter, Ch. 10-12
Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
Q:Bowl buckle scaffold inspection and evaluation
1 main components should have product identification and product quality certificate.2 the supplier shall provide the material, product inspection report of the pipe, parts, casting, stamping parts and so on.
Q:How to calculate the fastener type steel pipe scaffold
1 "Uniform provisions" on the scaffolding structure design calculation method?1.1 requirements for design methods and design requirements1.1.1 stipulates that the scaffolding structure will be based on the probability theory based on the limit state design method (referred to as the probability limit state design method, that is currently China's engineering structure design method) for design.
Q:I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
Scaffold piercings, being two cartilage piercings connected by a single bar, take six months for initial healing and twelve months for a fully healed tunnel of flesh to be formed. Don't change it yet, I assure you, you will regret it. Just be patient, keep on cleaning, cleaning, salt-soaking.
Q:For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.
Q:How to solve the problem of scaffold pipe repair
ST100 type hyperbolic steel pipe straightening machine adopts staggered rolling rotary straightening system, the 4 line rolling wheel revolves around the steel pipe:
Q:My mom wouldn't let me get snakebites or cyberbites but she will let me get my scaffold pierced. I know people have different things for pain etc etc I know it will hurt but I want it pierced. So, to someone who has gotten it pierced or knows about it is there anything special you have to do to take care of it or is it just like the ear lobe piercing.
it probably does hurt cuz of your cartilage just put rubbing alchahol on it and it should be okay =)
Q:This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q:Can you identify Scaffold Grade Aluminum tubing by looking at it.?
The grade or type of Aluminum Alloy materials can not be identified visually because they are almost all the same in appearance. Normally these materials are marked with there Alloy number or designation like, 6061- T6, at certain intervals so that users can distinguish them.
Q:Does anyone know the name of the song or perhaps have a link to the video if they have seen it on net for example on youtube.?
it is umm Ain's comin down til the sun comes down

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords