Pressed Swivel Coupler-Scaffolding Accessories
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 25000 m.t.
- Supply Capability:
- 1000000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description
As an international diversified enterprise, we dedicate to the research & design, manufacturing and supply of formwork and scaffolding serving projects such as Civil Engineering, Bridge/Road, Hydraulic Dams and etc.
It covers an area of 25,000m2, possesses 10,000m2 standard plant and fixed assets valued 300 million RMB. We havea technical team of highly educated professionals having in-depth knowledge and competence to design, develop and manufacture high quality products according to customer requirements. Our experienced project engineers can help ensure that our customers' projects are meeting target deadline and achieve the most convenient and efficient solution on cost saving basis.
Meanwhile, our production and quality management team strictly follow ISO9001 Quality Control System and 6S Production Management System, which helps establish competitive advantages such as internationally certified products, short delivery time and excellent service and etc, ensuring our market share in America, UK , Australia, Middle East, Southeast Asia and Africa, and setting stage for establishing overseas offices in the UK, Africa and many other nations.
Striving for the philosophy of “Integrity Management, Technological Innovation, Human-Oriented, Diversified Development” and the purpose of “Develop from Best Quality, Advanced Technology, Stable Reliability and High Reputation” since establishment, our company has won unanimous praise from customers. In 2015, NGM successfully passed British NASC’s audit of business management, product,process&manufacturing, environment, health &safety and ethical.
With our dedication, wisdom, preciseness and integrity, we aim to make NGM a competitive and professional supplier of formwork and scaffold in the international market, which has become the company’s vision as well as our forever pursuit and faith.
Characteristic
We work for the based items(Stamping, fabrication and machining) and get the best price for some other parts from our 200 qualified supplier, these allow us have been providing to our valued customers from overseas(U.S., U.K, Australia, Canada, Germany, France) the following benefits and advantages:
Competitive pricing with good quality.
Turn-key solution to procurement of different types of components.
Specification
It is used to attach a tube at 90°angle.Details as follow:
size:48.3mm
Min.Slip Load: 12.5KN
Distortion Load: 17KN
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
- Q:The difference between the scaffold and the scaffold
- The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Pressed Swivel Coupler-Scaffolding Accessories
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 25000 m.t.
- Supply Capability:
- 1000000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches