Scaffolding Parts Sleeve Accessory
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
uick Details
Place of Origin: | Model Number: | ||||
Type: | Scaffolding Part Type: | Color: | |||
Material: | Certificate: |
Packaging & Delivery
Packaging Detail: | In bag or in carton |
Delivery Detail: | 25 days after the order confirmation |
Specifications
1.Material:Q235 steel
2.Surface Finished:painted,galvanized, powder coated
3.Certificate:ISO9001-2000
1) High quality and reasonable price
2)Good service
3) Fast delivery
4) Professional and reliable
5)OEM is offered
Adjustable | Outer pipe | inner pipe | Theoretical | 20 ft Container |
length(m) | tube(mm) | tube(mm) | Weight(kgs) | can load(pcs/bulk) |
0.8-1.4 | 48×1.6×765 | 40×1.8×835 | 4.74 | 3500 |
1.6-3.0 | 48×1.6×1600 | 40×1.8×1600 | 7.57 | 2200 |
2.0-3.5 | 48×1.6×1710 | 40×1.8×2000 | 8.45 | 2000 |
2.2-4.0 | 48×1.6×2000 | 40×1.8×2200 | 9.32 | 1750 |
|
|
|
|
|
1.6-2.9 | 56×1.6×1510 | 48×1.8×1600 | 8.95 | 2200 |
1.8-3.1 | 56×1.6×1510 | 48×1.8×1800 | 9.36 | 2100 |
2.0-3.6 | 56×1.6×1750 | 48×1.8×2000 | 10.29 | 2000 |
2.2-4.0 | 56×1.6×2010 | 48×1.8×2200 | 11.26 | 1750 |
|
|
|
|
|
1.4-2.7 | 60×2.0×1340 | 48×2.0×1400 | 9.45 | 2300 |
2.0-3.5 | 60×2.0×1540 | 48×2.0×2000 | 11.38 | 2000 |
2.2-4.0 | 60×2.0×1840 | 48×2.0×2200 | 12.7 | 1750 |
3.0-5.5 | 60×2.0×2540 | 48×2.0×3000 | 16.51 | 1500(40ft/in bulk) |
- Q: what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
- Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
- Q: Method for inspection of foot hand frame fittings
- Or "low pressure fluid delivery welded steel pipe" GBT 3092
- Q: What are the requirements for the sampling inspection of scaffolding?
- Inspection and acceptance of cantilever scaffold1 after the erection of the cantilever support, the scaffold is erected;2 before loading on the work layer;3 after each set of 10m height;4 after reaching the design height;5 in the case of more than six winds and heavy rain;6 use more than a month.Cantilever scaffold inspection document1 special construction plan and design documents;2 safety technical disclosure;3 the provisions of appendix D, table D.1.
- Q: so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
- well it depends because some bars are thicker than others, if your changing to a bar as thick as the one you have now then i say about a month is good but if its the slightest bit thicker i suggest you wait maybe 2 months and in the mean time make sure your turning it and wiggling it so after the 2 months go by you can change it to a thicker bar without it hurting
- Q: i have some ?'s on the scarlett letterWhat effect has the 7=year interval had on Dimmesdale ?
- you can see how weak morally dimmesdale is, because he keeps his hand over his heart all the time, and is constantly beating himself up over his crime. he whips himself in the closet, and brands himself with a scarlett a to match hesters. hester... when she first walks out on the scaffold she can be seen as defiant, as if she isn't ashamed of the embellished letter a she wears. the cottage she lives in is on the edge of the town, bordering the forest. towards the end of the 7 years, her actions can be seen as repent maybe for her crime: she is a self ordained sister of mercy, helps the poor and homeless, sews... and the a turns from adultery to able
- Q: I had my scaffold pierced yesterday and now it is swollen and red. Its throbbing and painful. I have cleaned it and applied ice and antiseptic spray.I don't own any sea salt.HELP ME! I'M SO TEMPTED TO REMOVE IT.
- Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
- Q: Bowl buckle type steel pipe scaffolding should set up a few people
- What are the form and structure of bowl buckle scaffold?Composition formA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.
- Q: Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
- Characteristic1 Multi function. According to the specific requirements of construction, can be composed of multiple 0.6m module group frame size and load of single row, double row scaffolding, supporting frame, supporting the construction of equipment to enhance the function of frame columns, and other materials, and can do curve layout. Scaffolding can be adjusted with the bottom of the support, adjustable upper support, dual adjustable early demolition, pick beam, pick up the rack and other accessories with the use of various types of steel scaffolding can be used in conjunction with each other to achieve a variety of multi-functional
- Q: Introduction of external scaffolding
- Temporary structure frame for feeding, piling and construction work outside the outer wall of the outer wall for building construction. 1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.
- Q: male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
- depends how many times have i told you to get off?
Send your message to us
Scaffolding Parts Sleeve Accessory
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords