• Scaffolding Diagonal Brace End System 1
  • Scaffolding Diagonal Brace End System 2
  • Scaffolding Diagonal Brace End System 3
Scaffolding Diagonal Brace End

Scaffolding Diagonal Brace End

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
FF-007F
Type:
Scaffolding Parts
Scaffolding Part Type:
accessories

Packaging & Delivery

Packaging Detail:woven bags with pallets or as your requirements
Delivery Detail:within 30 days after confirmation

Specifications

1)Material:Q235
2)Weight:0.70kg
3)High quality and best price
4)Surface treatment: HDG/Galvanized/Painted
5)OEM

Packaging & Delivery

Package: woven bags with pallets or as your requirements

Delivery: within 30 days after confirmation

Product Specifications

1. Material:Q235

2.Weight: 0.70kg

3.Brand Name: FF

4.Brand model : FF-007F

5. Surface treatment : HDG/Galvanized/Painted

6.Standard :EN74

7.Main market: America, Europe, Australia Africa, Asia and mideast

8.Quality: durable, stable, skid-proof, antirust, easy to assemble & dismantle

9.Packaging :woven bags with pallets or as your requirements

10.High quality and best price

11.OEM service is available

More Details

Place of Origin: Rizhao China (Mainland)  

Brand Name:FF

Brand model : FF- 007F

Type: Scaffolding parts

Scaffold Part Type: Scaffolding Accessories

Material: Q235

Standard: EN74

Surface : Electro galvanized, Hot DIP galvanized, or painted

Note: OEM service available

Type

Scaffolding Accessories

Material

Q235 Material is as per customer's demand with high tensile and yield stress

Color

Silver,  as customer's requirement

Surface Treatment

Electro plated, Hot dip galvanized, Powder coated, Painted

Advantages

Top quality, Competitive price, Timely delivery, Good Service, Standard package,  

Certification

EN74

Minimum order

1000 pieces

Supply ability

15container/month

Port

Qingdao

Currency

USD

Payment

L/C, T/T, 30% in advance

Package

Woven bags with pallets or as your requirements

Delivery

within 30 days after confirmation or as your requirements


Q: Standard for inspection of portal scaffolding
The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
Q: What are the components of a mobile scaffolding
The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
Q: The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
If the pole height is 5.345m, general 5.30~5.33m, general step according to the self set in advance, such as, 1.8m, 1.5m, and finally, according to the table look-up
Q: Fastener type steel pipe scaffold composed of two components? What are the roles?
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q: Construction, outdoor double scaffolding a square meter how many meters of steel pipe and how much?
Each of the joints is about 5%, which needs to be controlled by the step distance and the vertical rod spacing. Under the construction of the construction of steel tubular scaffold safety technology
Q: Where can I source scaffolding steel/aluminium planks with rubber end caps?I am having much difficultly finding anything, can you assist?Thank you in advance.
Maybe something like a window washers scafolding planks...?
Q: I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
When I got my industrial, it hurt more after wards. During the first week, it was a pain to sleep. Just make sure you clean it twice a day so it doesn't get infected.
Q: i had my scaffold piercing done in the summer holidays and wen i went back to school (currently in my last year) they told me to take it out so i had to go back to the piercer. They changed the bar to two clear retainers in the holes so they wouldn't heal, now it hurts all the time and is red with a bubble on the top of my ear, any suggestions as to what i should do? :/
regularly clean it with salty lukewarm water and cover it up with tape
Q: The construction scheme of high rise and external cantilever scaffold!
Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
Q: How to calculate the vertical force of scaffolding
The calculated data include the following three values:1 uniform load value calculation,2 bending strength calculation: the maximum bending moment is considered as the moment under the uniform load3 deflection calculation: the maximum deflection is considered as the deflection of simply supported beam under uniform load

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords