Scaffolding Diagonal Brace End
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Type: | Scaffolding Part Type: |
Packaging & Delivery
Packaging Detail: | woven bags with pallets or as your requirements |
Delivery Detail: | within 30 days after confirmation |
Specifications
1)Material:Q235
2)Weight:0.70kg
3)High quality and best price
4)Surface treatment: HDG/Galvanized/Painted
5)OEM
Packaging & Delivery
Package: woven bags with pallets or as your requirements
Delivery: within 30 days after confirmation
Product Specifications
1. Material:Q235
2.Weight: 0.70kg
3.Brand Name: FF
4.Brand model : FF-007F
5. Surface treatment : HDG/Galvanized/Painted
6.Standard :EN74
7.Main market: America, Europe, Australia Africa, Asia and mideast
8.Quality: durable, stable, skid-proof, antirust, easy to assemble & dismantle
9.Packaging :woven bags with pallets or as your requirements
10.High quality and best price
11.OEM service is available
More Details
Place of Origin: Rizhao China (Mainland)
Brand Name:FF
Brand model : FF- 007F
Type: Scaffolding parts
Scaffold Part Type: Scaffolding Accessories
Material: Q235
Standard: EN74
Surface : Electro galvanized, Hot DIP galvanized, or painted
Note: OEM service available
Type | Scaffolding Accessories |
Material | Q235 Material is as per customer's demand with high tensile and yield stress |
Color | Silver, as customer's requirement |
Surface Treatment | Electro plated, Hot dip galvanized, Powder coated, Painted |
Advantages | Top quality, Competitive price, Timely delivery, Good Service, Standard package, |
Certification | EN74 |
Minimum order | 1000 pieces |
Supply ability | 15container/month |
Port | Qingdao |
Currency | USD |
Payment | L/C, T/T, 30% in advance |
Package | Woven bags with pallets or as your requirements |
Delivery | within 30 days after confirmation or as your requirements |
- Q: Standard for inspection of portal scaffolding
- The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
- Q: What are the components of a mobile scaffolding
- The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
- Q: The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
- If the pole height is 5.345m, general 5.30~5.33m, general step according to the self set in advance, such as, 1.8m, 1.5m, and finally, according to the table look-up
- Q: Fastener type steel pipe scaffold composed of two components? What are the roles?
- 2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
- Q: Construction, outdoor double scaffolding a square meter how many meters of steel pipe and how much?
- Each of the joints is about 5%, which needs to be controlled by the step distance and the vertical rod spacing. Under the construction of the construction of steel tubular scaffold safety technology
- Q: Where can I source scaffolding steel/aluminium planks with rubber end caps?I am having much difficultly finding anything, can you assist?Thank you in advance.
- Maybe something like a window washers scafolding planks...?
- Q: I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
- When I got my industrial, it hurt more after wards. During the first week, it was a pain to sleep. Just make sure you clean it twice a day so it doesn't get infected.
- Q: i had my scaffold piercing done in the summer holidays and wen i went back to school (currently in my last year) they told me to take it out so i had to go back to the piercer. They changed the bar to two clear retainers in the holes so they wouldn't heal, now it hurts all the time and is red with a bubble on the top of my ear, any suggestions as to what i should do? :/
- regularly clean it with salty lukewarm water and cover it up with tape
- Q: The construction scheme of high rise and external cantilever scaffold!
- Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
- Q: How to calculate the vertical force of scaffolding
- The calculated data include the following three values:1 uniform load value calculation,2 bending strength calculation: the maximum bending moment is considered as the moment under the uniform load3 deflection calculation: the maximum deflection is considered as the deflection of simply supported beam under uniform load
Send your message to us
Scaffolding Diagonal Brace End
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords