• Scaffolding Coupler German Type Steel Galvanized Forged Swivel Half Coupler 48.3 System 1
  • Scaffolding Coupler German Type Steel Galvanized Forged Swivel Half Coupler 48.3 System 2
  • Scaffolding Coupler German Type Steel Galvanized Forged Swivel Half Coupler 48.3 System 3
  • Scaffolding Coupler German Type Steel Galvanized Forged Swivel Half Coupler 48.3 System 4
Scaffolding Coupler German Type Steel Galvanized Forged Swivel Half Coupler 48.3

Scaffolding Coupler German Type Steel Galvanized Forged Swivel Half Coupler 48.3

Ref Price:
$1.00 - 10.00 / pc get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

1. Structure of  Scaffolding Coupler German Type Steel Galvanized ForgedHalf  Coupler  Description 

What is Swivel Scaffolding Coupler ?

Scaffolding Coupler is accessories of the scaffolding productions , it is usually made of Q235 steel material , The production technology can be forging or prssed  , With the development of the construction , Scaffolding Coupler German Type Steel Galvanized Forged Half  Coupler has beome more and more popular. 


Function of the German Type Swivel Coupler 

Scaffolding Coupler German Type Steel Galvanized Forged Half  Coupler used to connect two scaffolding tubes at any direction . The scaffolding coupler used to connect tubes and bulid hige woking towers .It can be used to 48.3mm tube or 48.3mm and 60mm tube  Every size avaliable . 


Advantage of  German Type Half  Coupler

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.


2.Main features of Scaffolding Coupler German Type Steel Galvanized Forged Half  Coupler 

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.Scaffolding Coupler German Type Steel Galvanized Forged Half  Coupler images 



Scaffolding Coupler German Type Steel Galvanized Forged Swivel Half Coupler 48.3

Scaffolding Coupler German Type Steel Galvanized Forged Swivel Half Coupler 48.3

Scaffolding Coupler German Type Steel Galvanized Forged Swivel Half Coupler 48.3


4. Scaffolding Coupler German Type Steel Galvanized Forged Half  Coupler Specification 

 Raw Material: Q235

 Size: 48.3mm

 Weight:0.7 kg

 Certifies:, EN 74 and OSHA

 Technology : Forging 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered



5.FAQ of Scaffolding Coupler German Type Steel Galvanized Forged Half  Coupler 

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 


Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

 




Q: What are the components of a mobile scaffolding
The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
Q: How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q: Method for inspection of foot hand frame fittings
Or "low pressure fluid delivery welded steel pipe" GBT 3092
Q: Which kind of scaffolding is the most convenient and time-saving?
The advantages of the new scaffold (compared with the bowl button) are as follows:1, with sufficient mechanical strength, stiffness and stability, safe and reliable work.2, the node connection without frame degree, has the ability to self lock, installation and disassembly flexible and quick, easy to grasp, support, removal efficiency than the bowl buckle type multifunctional scaffolding about three times, can save labor, labor, save time. In the process of construction, opening and closing channels at any time.
Q: Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q: According to the standard set up double scaffolding scaffolding to the number of meters per square meter
The span, the rod step is easy to calculate, I have done the program in general 4.4.8 meters
Q: 21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q: Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
3 products have a high degree of economic, the use of more convenient and efficient in use, only need to put the plug into the hole of the ends of the cross rod pole corresponding, and then knock tightly, the quality of the demolition ride fast and overlapping is the traditional scaffold cannot do. Its erection speed is 4-8 times more than 2 times that of steel pipe scaffold. Reduce labor time and labor remuneration, reduce shipping costs to reduce the overall. The joint is reasonable in structure, easy in operation, light and handy. Vertical rod weight than the same length of the size of the bowl buckle 6-9%.
Q: Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
To cover your A** in case of injury or an inspection.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords