scaffolding accessories prop nut
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Brand Name: |
Packaging & Delivery
Packaging Detail: | Pallets or As Customer's Requirements |
Delivery Detail: | 20days |
Specifications
1. At option of your specification
2. High quality with competitive price
Name | Shoring Prop |
Material | Q235 |
Finish | Powder Coated / Hot-Dip Galvanized |
Length | 1600mm-2900mm 1700mm-3000mm, 1800mm-3200mm,2000mm-3600mm, 2200mm-4000mm |
Thickness |
|
InnerΦ | 40mm, 48mm |
OuterΦ | 48mm, 56mm, 60mm |
weight | 7.20kg-28.67kg |
OEM | Offered |
- Q: Standard for inspection of portal scaffolding
- The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
- Q: What issues need to pay attention to the construction of high-level scaffolding
- Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
- Q: Please help me in building professional people (scaffolding)
- Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
- Q: i already found the force in rope 2 but im not getting the force in rope 1.
- difficult situation. search in google or bing. that could actually help!
- Q: When putting up old scaffolding, a mistake was made and it had to come down.Long story short, the connectors between the vertical and horizontal poles (which were hammered in) are stuck.Any ideas for getting them out?Thanks.
- WD 40, angle grind off what you can.
- Q: So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
- dw i had the lump for 6 months nd after a year it has finally healed but u have to be patient nd the other comment is right use tea tree
- Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- 10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
- Q: What is the difference between Scaffolding and Zone of Proximal Development?
- Zpd And Scaffolding
- Q: how long should i leave it before i change it, should i do it myself or go to the piercer to they can do it?and is it still normal for the pericing to hurt after quite a while of having it done?
- Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
- Q: Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
- Characteristic1 Multi function. According to the specific requirements of construction, can be composed of multiple 0.6m module group frame size and load of single row, double row scaffolding, supporting frame, supporting the construction of equipment to enhance the function of frame columns, and other materials, and can do curve layout. Scaffolding can be adjusted with the bottom of the support, adjustable upper support, dual adjustable early demolition, pick beam, pick up the rack and other accessories with the use of various types of steel scaffolding can be used in conjunction with each other to achieve a variety of multi-functional
Send your message to us
scaffolding accessories prop nut
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords