Scaffolding Accessories Limit Pin
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Brand Name: | Model Number: | |||
Type: | Material: | Surface: | |||
Color: | Size: | Weight: | |||
Technics: | Standard: | scaffolding coupler: | |||
Stable: |
Packaging & Delivery
Packaging Detail: | in bulk or pallet according to customer's requirement |
Delivery Detail: | no more than 20days |
Scaffolding coupler
1.have our own factory
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle
Our capability
Produce Equipment: 4 forged production lines,2assembly line,2 bolish line ,1sets 400 punch press,3sets 300t punch press
Produce Technology: stamping/pressing/forging;
Produce Capacity: 500 tons/month
Output: 3000 pcs/day couplers,3000pcs steel plank
Specification
Presed joint pin couper
1.size:48.3mm
2.weight:0.8kg
3.Material: Q235/225/345
4.surface :self-color / zinc plate / electro galvanized / HDG or painted
5.Standard: EN74 ,BS1139
6.Anti-rust ,skidproof ,high breaking strength
7.Durable finish, reliability, low maintenance, corrosion resistance, robust construction and high tensile strength
8. OEM serice is available
- Q: They can see a good place to anchor it but they won't start to build the scaffolding. I've used different builders and tried different bits of the paths, but its just not working. What do I do?
- Hey, This is a good link for downloading Virtual Villagers 3 The Secret City for free: j.mp/1pnRgNo it's completely free and it's very fast to install It is an entertaining game series that consist in exploring new corners of Isola Island, building structures and unraveling mysteries that you will find during the adventure.
- Q: What are the functions and requirements of the masonry wall
- security1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.
- Q: In the U.S.I live in Illinois as well so... yeah :DThank you!
- I paid around $55 +tip for mine but it varies from place to place...just call the place you plan on going to and ask them how much they charge.
- Q: so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
- I wouldn't suggest changing it for at least 6 weeks. You have to allow the skin to heal before touching, turning or changing the bar. If you do change it beforehand, you risk damaging the skin and cartilage surrounding the piercing. I know that I didn't change mine for about 8 weeks, and I haven't ever had a problem with it.
- Q: Im 18 years old and maleI have 4 piercings. On my left I have my lobe and a double helix (a type of cartilage piercing). On my right I have a scaffold/industrial. I know I want another piercing on my right ear, but cant decide what to get. Any input is greatly appreciated.
- conch would look great and not make it look to cluttered go for it :)
- Q: Scaffolding scaffolding erection norms which requirements, who can say?
- The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
- Q: Bracket cast-in-place beam bracket must use bowl buckle scaffold, can not use fastener type scaffolding, there is no mandatory requirements, or specification file requirements!
- 5.2.5, the calculation of the column, a clear calculation of the type of stud.6.2.4, clear the structure of fastener type column.Local documents, it is not possible to regulate, do not allow the use of fastener type scaffolding. But the top of the column, to use the provisions of backwater, specification.
- Q: Im thinking of getting a scaffold piercing when i am old enough to and ive seen videos of people who have one but it cause bacteria in their ear and if they take it out their ears swell. I want to know if this is a bad piercing to get. Also i have had an allergic reaction to an earring before and im not sure what type of earring it was. Can that affect it as well.
- It shouldn't be dangerous if you go to a good piercer (mine pierced mine funny) and clean it regularly. and it should be fine, Just learn which type of earring you;re allergic to and make sure they dont pierce it with that kind of metal.
- Q: In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
- Is to produce weight between each vertical rod scaffolding force
- Q: Introduction of external scaffolding
- 1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.
Send your message to us
Scaffolding Accessories Limit Pin
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords