• Scaffolding Accessories Acrow Jack Base System 1
  • Scaffolding Accessories Acrow Jack Base System 2
  • Scaffolding Accessories Acrow Jack Base System 3
Scaffolding Accessories Acrow Jack Base

Scaffolding Accessories Acrow Jack Base

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

Painted scaffold screw jack
1.surface: zinc plate or HDG
2.size: 24" , 36", 60"
3.hollow or solid
4.base or U head

1. Material: Q235 or Q255 or Q345

2. Surface Finish: zinc-plated, hot dip galvanization

3. Sizes: 24", 36", 60" or as per client's demand

4. Type: hollow or solid thresd tube

5. Thread Tube: dia 34 mm or 35mm or 38mm

                          length 300mm, 400mm, 500mm,600mm, 800mm, 914mm, 1524mm

                          base plate 150x150x5mm/6mm, 140x140x 5mm/6mm, 135x 135x5mm/6mm

                          all technical specification can be produced as per your request.

6. Inspection: by ourselves or by SGS or B.V or others

6. Certificates: ISO9001

7. Packing: in pallets or in bulks

8. OEM service as avaliable

9. Samples we can offer

Scaffolding Parts/Swivel Adjustable Scaffold Screw Jack BaseScaffolding Parts/Swivel Adjustable Scaffold Screw Jack BaseScaffolding Parts/Swivel Adjustable Scaffold Screw Jack BaseScaffolding Parts/Swivel Adjustable Scaffold Screw Jack Base


Q:How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:hi guys i got my scaffold piercing a couple of days ago and it keeps bleeding on and off and there was dry blood but i removed it and its bleeding more what could i do step by step to keep total care of my piercing to get rid of all these problem please help it will really be appreciated
leave the dry blood let it heal be patient
Q:Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
Q:I am currently taking early childhood care education as my college major. I am learning about ZPD (Zone of Proximal Development), and scaffolding the the development in early childhood.How would you explain, and define scaffolding
Scaffolding basically means being the support (a scaffold is a support) in the child's learning. A preschooler can do a range of things. He or she will have mastered some things already and there will also be things that are beyond what he or she can do. When playing with the preschooler, you want to make sure that what's going on falls in that range (zone of proximal development). Don't give him or her something that's too easy or too hard to do, but play games that make them think a little and use what he or she already knows to take it a bit further. I hope I'm not confusing you more. In one sentence..scaffolding is supporting the child in learning something new based on what they already can do or know.
Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
Three, discharge should meet the following requirements:1, the structure is strictly prohibited to throw to the ground;2, transported to the ground should be timely inspection of the construction parts, repair and maintenance, and according to the varieties, specifications at any time yard storage.
Q:would a scaffold piercing look gay on a guy?
No i think that would be hott!!! :)
Q:HELP me out please. im struggling with this book
I dont think she explained the rose bush very well. i think that it refers to Good and bad. Good being the rose and bad being the thorns Hester said in the book that she picked Pearl off a rose bush. Hester loves pearl but also fears her
Q:The basic form of external scaffolding
Basic structureA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords