Place of Origin: | Model Number: | ||||
Type: | Scaffolding Part Type: | item: | |||
material: | size: | weight: | |||
surface: | colour: |
Packaging & Delivery
Packaging Detail: | Drop Forged Coupler is packed with woven bags+steel pallet |
Delivery Detail: | drop forged coupler 20-30 days according to your quantity |
Specifications
Scaffold Drop Forged Coupler
material:Q235
size:48.3*48.3mm
weight:1.00kg
Surface: Electroplate
Scaffold Drop Forged Coupler
Production Detail:
Name: Drop Forged Coupler
material:Q235
size:48.3*48.3mm
weight:1.00kg
standard:EN74B or BS1139
surface treatment:Electroplate
High quality and competitive price
Specification of Drop Forged Coupler
Image | Item No | Name | Dia | Weight | Surface treatment |
| SD-3001 | British type double coupler | 48.3*48.3mm | 1.00kg | painting, galvanized |
| SD-3002 | British type swivel coupler | 1.10kg | ||
| SD-3003 | Pressed double coupler | 0.88kg | ||
| SD-3004 | Pressed swivel coupler |
- Q:THIS METAL SCAFFOLDING IS CONNECTED TO EARTH.Need 2 more questions to be answered:1.Is he going to be electrocuted if he wasn't holding the metal scaffolding?2.will the current flow through him or through the wire in both cases?
- First of all, are you working with AC ( alternating current - like a house) or DC ( direct current - like a car)? Assuming you are working with AC, then: Which wire are you holding? This again is assuming 120 vac - Bare copper ( ground) White ( neutral ) or Black ( Hot ) If you have a bare copper ground wire or the White insulated wire you will be fine. If you have the Black insulated wire in your hand then you are going to have a bad day. Yes to the first question Yes to the second question ( I would hope he was smart enough to let go before being too badly zapped) Both is the answer to the third question, as the person is basically an extension of the circuit - being burnt up - until he touches earth (ground) allowing the current to seek ground. All in all I would say leave any exposed wires alone until you have a professional with a multi meter check it out first. If this is in a commercial ( business) setting the voltages are much higher, not to mention it is most likely 3 phase - so watch out. All colors are referenced for the United States.
- Q:How long is the service life of disc scaffolding?
- Currently on the market there are many scaffolding accessories have been extended service
- Q:What are the functions and requirements of the masonry wall
- 6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
- Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
- The quality standard of the foot hand frame fittings: 1, steel pipe: (1) the steel pipe adopts the outside diameter is 48mm, the wall thickness is 3.5mm, the quality standard of the foot hand frame fittings
- Q:For the current stage of China's construction should not strengthen the specific meaning of scaffolding and support by way of the scaffolding and support the specific distinction and significance
- At the present stage Chinese people-oriented, building a harmonious society, especially the importance of safety in production site, in addition to constantly modify the security specifications and technical documents issued by a variety of real-time safety, strengthen safety measures, compulsory accident insurance and so on. JGJ130-2011 is the new version of the construction of steel tubular scaffolding safety technical specifications should be strengthened scaffolding construction management. The current JGJ162-2008 is the safety technical specification for the construction of fastener type steel pipe formwork support.
- Q:i have now got lumps on my scaffolding and i have searched and it seems to be normal.. i just want to know how to get rid? any ideas? :)
- A scaffold piercing should not be done with a single long bar. Go back to your piercer, or to another one and ask them to change it to two short bars, this will take the pressure off the tissue. Then you should buy some cotton cosmetic pads. Fill up a mug with boiling water from the kettle, soak a cotton pad in the water, squeeze out most of the water but not all of it, have it as hot as you can stand and hold it onto the lump. The lump is likely filled with lymph and this will encourage it to drain. Do this for about two weeks. If the lump still hasn't gone away either go back to the piercer or go see a doctor. To the person that said it shouldn't be done with the two shorter bars. Yes, I know many people who have had it done with one bar and have been fine, but I know plenty of people with horror stories. My ear could not cope with the one bar and wasn't draining properly even with regular sea salt soaks. One of my piercings has migrated slightly but I'm confident that my piercer will be able to put my long bar back in for me.
- Q:Fastener type steel pipe scaffold composed of components
- Fastener type steel pipe scaffold components are mainly shelf
- Q:Which loads are considered in the design of the scaffold
- 1 the weight of the frame structure: including the vertical rod, vertical horizontal bar, horizontal horizontal bar, scissors, fasteners, etc.;2) structure, accessories weight: including the foot board, railings, foot boards, safety nets, such as the weight of protective facilities.
- Q:Cantilever beam type scaffolding can not exceed the maximum number of not married
- Cantilever scaffold cantilever beam fixed method is as follows:1, the floor in the rebar at the same time, the embedded two door shaped clamp, each clamping hoop is composed of 2 14mm grade steel made a root diameter, the first door shaped clamp from the wall 450mm, second door shaped clamp from the other end of the 350mm, the door shaped card hook stirrup slab reinforcement, to meet the requirements of the anchorage the cantilever beam, door shaped clamp is inserted in the middle, but also with a fixed electric welding.
- Q:Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
- nope! Cartilage piercings take about a year to fully heal up. Yes, you can get 2 separate bars, but let the piercer know thats what you want. Industrials are VERY hard to take care of. Make sure to listen to EVERYTHING the piercer says!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scaffolding Accesories Drop Forged Coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords