• S820H  Road Roller Buy S820H Road Roller at Okorder System 1
  • S820H  Road Roller Buy S820H Road Roller at Okorder System 2
  • S820H  Road Roller Buy S820H Road Roller at Okorder System 3
S820H  Road Roller Buy S820H Road Roller at Okorder

S820H Road Roller Buy S820H Road Roller at Okorder

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
300 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Name: S820H Road Roller

Parameter:

 

ItemUnitS820C
Operation weightkg20000
Front axle loadkg13500
Static linear loadkg/mm621
Vibration frequencyHz28/33
Nominal amplitudemm1.86/0.93
Excitation forcekN370/255
SpeedⅠkm/h0~4
km/h0~5
km/h0~6.4
km/h0~10
Theoretical gradeability%50
Min. turning radius (internal)mm4370
Engine modelSC8D190.1G2
Rated powerkW140
Rated speedrpm2200
Dimension (Length ×Width× Height)mm6222×2390×3077

 


 

Advantages:
 

state-owned company

fortune 500 company

AAcustom

 

 

 


 


Why choose us?

1 sincre

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the equipment such as tower cranes, produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to solve all your tower crane installation and other questions.  Our goal is to provide the best professional services.

3 quality

 CNBM International’s tower crane  have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.


Inquies FAQ

My dearest friend, if you want to buy our tower cranes, please tell us the following parameters. And we will make the most suitable project for!

1. Building height or tower crane working height.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements




Q: How much is the new machine for the 22 ton roller?
22 tons of vibroll new car price, to see the brand, configuration, take Xugong 22 tons of new machine for example, high, Saul pump, electronic files, the new car price may be around 380 thousand, with low, domestic pump, manual transmission, may be in the 35,6 million, and with, or do you want to add something, something less, prices are not the same, like to buy the car
Q: Roller roller steel what material? Thickness 10mm or so, which expert pointing Q235, OK?
when the old hardening layer wear off, new hardening layer formed again.A3 steel as an ordinary component, not force, but force components, but not, strength, toughness, hardness is not good.
Q: The dangers of young people turning on rollers
Negatively speaking, lack of social experience is actually eat less, so you eat more slowly understand why the boss says that they make pressure on how how pressure, not with his nonsense, you say to him, he more angry, more than 10 hours a day and the boss asked people, a person carry not to live! I also drive the road ~ in the construction site must listen to.
Q: OGFC why the use of less than 12 tons of steel tube roller
Because it should be careful with vibration rolling and roller roller compaction, and pay attention to avoid excessive grinding. At the beginning of rolling, the opportunity of pressing the road is closely followed, and the paver should not be too spaced. After the paving, the initial degree of compaction is great. It has been proved by practice that the direct rolling process can be directly applied to the complex pressure process without serious deterioration, otherwise, it should be rolled according to the requirements of the SMA pavement.
Q: Does the road roller have a flat fee? (only 1 number)
Do you see how long time, it depends on your local diesel prices, if your local diesel price is 8 yuan /KG, this is the "heart not afraid of ghosts what?" at night more than eleven points, about 1200 yuan a day, so don't be afraid. Usually 1 hours is 280, bring your own oil. For reference only. Then select the unit: 465.75 yuan. Road roller leveling site, it should be 2000 yuan [bring your own oil], you say what kind of ah?. These kinds of engineering machinery cost calculation according to affecting, his father mother has not come back, you do not know what.
Q: Then the grass-roots construction to the stability layer, including two ash macadam stage, will use 21T iron three times repeatedly rolling the road. Excuse me, iron three rounds again in this process, the role and vibration roller what is the difference?
Why not use vibratory roller compacted base, mainly because the composition of the two ash macadam, two ash gravel is composed of lime, fly ash and gravel mixture, the mix and then transported to the general in the construction site. After completion of paving compaction after curing can be survived, but must adopt smooth wheel roller rolling roller, if the vibration, vibration in the process, two ash gravel will occur somewhat like segregation, segregation of concrete, gravel and lime fly ash is separated from the. Crushed between the two ash separated, leading to maintenance survived, so we cannot use vibratory roller.
Q: How many tons are the road rollers in the road? What's the model and how much is it?
Look at what road, county road, following 18, 21, three wheel road, dart 21, one, 24...... The vibration pressure is about 20.................. Prices vary, a manufacturer, a price, three rounds of pressure about two hundred thousand, vibration pressure of more than 20 to more than 30, XCMG road machine is the best, into the factory to buy, do not buy imitation, do not be cheated
Q: How to use a loader to rebuild a roller and use an old 50F loader to rebuild a roller, would like to see the special view
If you want to change into a single steel wheel compactor, there may be hope, but the compaction capacity will be insufficient. If you change the vibratory roller, the rear frame will move more, and the life expectancy is also difficult to say. The final engines may be the engine, the rear axle, the cab, the tank, and so on.
Q: Roller clutch does not move, hang not into gear, what is the problem?
Should be the electronic control gear bar, the pressure is not enough, or power cylinder problems, clutch failure in place, the control sensor will not give the gear signal, of course, can not hang professional roller
Q: How much for an hour, how much money a day, oil?
Your question is incomplete. If it is a vibratory roller, it can be divided into double wheel and single steel wheel. Single steel wheels are used in earthworks and crushed stone subgrade. Double steel wheels are used on asphalt.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords