• Ringlock scaffolding accessories System 1
  • Ringlock scaffolding accessories System 2
  • Ringlock scaffolding accessories System 3
  • Ringlock scaffolding accessories System 4
  • Ringlock scaffolding accessories System 5
  • Ringlock scaffolding accessories System 6
Ringlock scaffolding accessories

Ringlock scaffolding accessories

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
3000t kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Ringlock scaffolding


Specifications:

 It has two big main points systemφ60 andφ48. Which is Consists of Vertical W/O Spigot,vertical ,horizontal,diagonal,U-head jack,basic socket, Jack Base etc.


Characteristics & Applications :


1.Bearing capacity is big and long service life, up to 20 years.

2.High material utilization, safe and reliable.

3.Flexible use and it is very  fast to set up.

4.Not easy to lost (consumption).

5.Transportation is convenient, easy to manage.

6.It is beautiful and clean.


Market:


The products are exported to all countries around the world,such as The United States, South Korea, Malaysia, India, England, Cambodia, Australia.







Q: I need to build something using stainless steel tube or scaffolding tube. What is the cheapest place in the UK to get it ... with no minimum order quantities?Thanks.
try okorder they sell stainless steel tubes for tubing. or truetube and eagletube , they supply with no minimum order ..
Q: Scaffolding plug (90, outside the 400), this is what ah? How to use ah?,
Press and rotate the bowl buckle, use the limit pin to fix the bowl buckleA bowl type steel tube scaffold column horizontal distance is 1.2 m, the vertical distance according to the load of scaffold is 1.2 m; 1.5 m; 1.8 m; 2.4 m, step away from 1.8 m and 2.4 M. when erecting pole connecting joints should be staggered, staggered first layer vertical rod 1.8 m long and 3 m the vertical rod, upward with 3 m long rod, the top layer with 1.8 m and 3 m two. The length of leveling under 30 m high scaffold verticality deviation should be controlled within 1/200, 30 m high above the scaffold should be controlled at 1/400~1/600, the total height of the vertical deviation should be less than 100 mm.The domestic vertical bar bowl buckle spacing of 600mm, the number of foreign pitch bar button spacing is some of the 500mm, the foreign specifications of the crossbar as well as 1m, 2m, 2.5m
Q: Another from the ministry of silly questions…I’d like to support a lightweight tarpaulin over my back yard. Single slope, high side attached to the house and low side attached to a scaffolding pole, running horizontally between two walls. Fair weather, no high winds or pooling. The run of pole would be 8 meters. The longest poles seem to be 6m, so I need to use a coupling. Will this be strong enough – ish? I imagine the most stressed point would be just around the edges of the coupling, so If I used two joints/couplings in the bar, wouldn’t I half the strain on a single one?Also if I made the joints at 1m and 7m would that be better than to have a joint in the middle where the most flexing will be?Also bit more expensive, but with Aluminium the bar will be 20kg lighter – buy will it be as strong joint wise?Will a tubular coupling be as good as a external one?If anyone knows.. Thanks!
The problem with your proposal is that you realise that the wind/rain could have an effect but chose to ignore the consequences if it occurs. 'Proper' scaffolding is designed and such an unsupported span would never occur in a 'normal' scaffold so the standard calculations would not work. There is also the possible effect on the walls, could they take an abnormal load? I would look at theatrical or music stage hire using trussed beams.
Q: Hello, in a Construction project who is required to check the scaffolding equipment?check the installation? and frequently check the scaffold during the day?is it the Planning supervisor, Contractor, Principle contractor, CDM coordinator or Works manager
not all jobs are as big as the ones reffered to but I learned something here
Q: ^^^ thats alll. and does it hurt?
Cost depends on where you go. Pain depends on your pain tolerance.
Q: Why is there so much unnecessary scaffolding in NYC?
Must belong to someone's cousin. Buildings need cleaning too.
Q: Why do so many buildings in Manhattan have scaffolding on the street level?
My friend, the reason for the scaffolding, is to prevent sidewalk accidents. It is used when a building is being renovated or is under construction, as required by city building codes. Good luck
Q: How do I know?
goto the piercing shop and ask?
Q: Im wondering what scaffolding means because my husband is going to louisiana to go work quot;scaffoldingquot; and i was wondering what they do
Scaffolding is the framework of metal tubes and wooden planks which is built up around a building, so the workers can stand safely.
Q: im in the midwest
when we took osha classes , we were told there was no such thing as an osha approved plank...but i see the osha stamp on some so i dont know what to think...rough cut 2 in. hemlock will hold anything you can safely put on a scaffold...

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords