Ringlock Scaffold Accessory Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
Accessories
Packing
Inspection
Project
More Photos
- Q: An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
- Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
- Q: Okay I have some questions:-When I get it done can I have- 2 labret retainers put in to hide them from my school?-If I can, how discreet are the retainers?-How long to heal? (Even though the piercer will tell me)-Have you got a picture of a scaffolding piercing with retainers? May I see it (:-And a basic clear cleaning regime?Thankyous (: x
- Im pretty sure you can have retainers for your industrial piercing if you get it done buuuuut you wont be able to put them in for a couple months cause industrials take a long time to heal. And like the person said below it really depends on your skin tone and what color retainer you buy. You shouldnt have a problem with the industrial though cause people cant see mine if I have my hair down. They take up to 1 year to fully heal. You can swap your piercings out after 3 months but beware it can close up on you if you have difficulty putting it in. You HAVE to wait 3 months before you can put retainers in. Industrials are 14g piercings so make sure your retainers are the right gauge. Your ear will be sore for a long time dear. Mine didnt hurt while getting it pierced cause I have a high pain tolerance but my ear was sore and bruised afterwards. The healing process is very delicate and your ear will be sore for a couple months. Make sure you get the piercing on the ear you dont sleep on. I use a 50/50 solution of Betadine and distilled water. Other piercers have different cleaning regimes though, so listen to your piercer. I always clean it with warm water and use a Q-tip to clean around the piercing. Then I put the cleaning solution on and twist the piercing around GENTLY so the solution will go into the cartilege. I do this 3 times a day and i will do it for a month. Industrials are really delicate piercings so always keep it clean :)
- Q: Mine has passed the healing date and i have had another one put in it's been over 2 months since i had it done...but there is still some swelling on the top half of the ear that is pierced...will it go down eventually or is there something wrong with it?
- it will eventually go down. industrials can take up to a year to heal. don't worry about it.
- Q: There are three instances (hester alone, dimmesdale at night and the last time) and itd be reallllly great if someone could help me find quotes :)
- I Yahooed it and got plenty of quotes so try 'Scarlet Letter + scaffold'.
- Q: this work wont start till tuesday and the scaffold has blocked my sky tv. am i within my rights to remove this scaffolding?
- No you are not within your rights to remove the scaffolding. Call the landlord to see if anything can be done. Or you could read, go for a walk. It is not the end of the world to not have tv.
- Q: ^^^ thats alll. and does it hurt?
- Cost depends on where you go. Pain depends on your pain tolerance.
- Q: Hiya, I just had a scaffold piercing on the 14th of this month.. and everything was fine but in the last couple of days my ear has become a bit swollen and has broke out into spots. The actual piercing is fine, I found some dry blood on the end of the piercing but I dismissed that as nothing. The piercing doesn't hurt at all but its the itching that's getting to me! :(Any advice please, (bear in mind i shall be going to the doctors)Thanks
- You shouldn't need to see the doctor. You may be having a reaction to the jewelry. Doctors are not very knowledgeable about piercings. In fact, most that I've met are quite biased against them. Swelling with a scaffold piercing is normal. Sometimes it takes a few days to take effect. Go to your piercer and let them take a look at it first. If you're wearing surgical steel you may need titanium. Also make sure you're only using sea salt soaks twice a day to keep it clean. No antiseptic cleaners, witch hazel, alcohol, peroxide, antibiotic ointment, most soaps, etc.
- Q: Okay well it's been 4 weeks now and I think that the front part is infected I'm not sure. But just next to the piercing there's a bump in my ear and puss comes out, but it's not that much. How can I tell if it is infected? And if it is, is there anything I can do about it? Thanks. :)
- Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS Clean it ALWAYS
- Q: Tell me how much the shear strength can reach MPa, thank you
- The type of steel pipe is 48 * 3, and the wall is made up of 2 steps and 3 spans, the vertical distance is 3.60 meters, and the horizontal distance is about 4.50 meters. Construction live load is 3.0kN/m2, taking into account the 2 layer construction. The bamboo scaffold board piece, load 0.15kN/m2, calculated according to the laying of 13 layers
- Q: What is the difference between the bowl buckle scaffold and the fastener type steel pipe scaffold? What is the difference?
- Single row are generally used for landing. Its main function is to protect. Specific reference to JGJ 1302011 "construction fastener type steel pipe scaffolding safety technical specifications" in the relevant instructions, and illustrations.
Send your message to us
Ringlock Scaffold Accessory Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords