Ring lock cuplock scaffolding plank
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Type: | Scaffolding Part Type: | samples: | |||
certificate: | sample freight: | third party inspection: | |||
customer on-site inspection: | technical support: | Mill Test Certificate: | |||
Raw Material Inspection report: | Discount: | Small order: |
Packaging & Delivery
Packaging Detail: | at the buyer's option |
Delivery Detail: | 25 days upon the down payment |
Specifications
coated board
1.Material:Q235
2.Finishing: Galvanized, powder coated, painted
3.Fast quote
Length L(mm) | Width-W(mm) | Thickness-D(mm) | Hook Size-A(mm) |
900 |
420 |
45 |
50/43 |
1200 | |||
1219 | |||
1500 | |||
1524 | |||
1800 | |||
1829 | |||
900 |
480 |
45 |
50/43 |
1200 | |||
1219 | |||
1500 | |||
1524 | |||
1800 | |||
1829 | |||
900 |
500 |
50 |
50/43 |
1200 | |||
1219 | |||
1500 | |||
1524 | |||
1800 | |||
1829 | |||
900 |
210 |
45 |
50/43 |
1200 | |||
1219 | |||
1500 | |||
1524 | |||
1800 | |||
1829 | |||
2000 | |||
900 |
240 |
45 |
50/43 |
1200 | |||
1219 | |||
1500 | |||
1524 | |||
1800 | |||
1829 | |||
2000 | |||
900 |
250 |
50 |
50/43 |
1200 | |||
1219 | |||
1500 | |||
1524 | |||
1800 | |||
1829 | |||
2000 | |||
2500 | |||
3000 | |||
900 |
300 |
50 |
50/43 |
1200 | |||
1219 | |||
1500 | |||
1524 | |||
1800 | |||
1829 | |||
2000 | |||
2500 | |||
3000 |
- Q:Can the horizontal bar of the bowl buckle scaffold be oblique, the vertical position of the vertical bar is a parallelogram, not square
- However, the strength may not be enough, depending on the specific parameters.
- Q:Can you shorten the distance of the bowl buckle scaffold? That is, regardless of the length of the pole, the distance can be set to 60, 90, 120cm. Thank you
- First of all, I correct it, the length of the bowl buckle frame length of 60CM, that is, 60, 120,, 240CM, but not the length of the 90cm; the length of the horizontal bar of 30cm modulus, namely, 30, 60, 90, 120, 180cm.
- Q:Tell me how much the shear strength can reach MPa, thank you
- Your scaffolding erection, steel pipe type and so on?Give you an exampleDouble scaffolding, set up a height of 25.1 meters, vertical pole with a single riser. The vertical distance of 1.50 meters, the vertical rod of the distance of 0.85 meters, within the framework of the distance from the structure of the structure of 0.30 meters, vertical rod distance of 1.80 meters
- Q:What are the characteristics of bowl buckle scaffold
- Scaffolding function WDJ bowl scaffold to create a joint with a bowl, not only is the ability to have good and reliable mechanics in the three-dimensional direction and strength performance and self locking, convenient disassembly, and is extremely fast and labor-saving. The utility model can completely avoid the scattered nature of the bolt operation, and belongs to a scaffold which can conveniently carry out the combined size and the carrying capacity. Multi function, can according to the construction requirements and the size of different group frame and construction load of single and double scaffolding, supporting frame lifting and climbing the construction equipment, mainly used to construction equipment, building and bridge or the construction of chimney building requirements.
- Q:Im wondering what scaffolding means because my husband is going to louisiana to go work quot;scaffoldingquot; and i was wondering what they do
- Scaffolding is the framework of metal tubes and wooden planks which is built up around a building, so the workers can stand safely.
- Q:its a current ad on uk tv, has a really nice song and there is a couple sitting on top of the stage scaffolding and they share a treat , like a chocolate pudding or ice cream. I really want to know the song, but at the moment i cant even remember what the product is, which is exasperating as i can't research further....
- not sure of the song but i know the advert is for hagen das ice cream so you should be able to look it up on youtube!x
- Q:At what height do we need to erect scaffolding?
- Any height you can fall from and get hurt. I would say this would be above say 6 feet or so. Scaffolding is cheap. You can rent it around here for $14 for two weeks.
- Q:hey im 13&very mature&my sister got a scaffold percing&said it hurt like hell ..i want 1 ..2 does it hurt?
- I'm turning 14 in 2 months. I just got that piercing 2 days ago! It doesn't hurt, getting it pierced. Although it hurt a bit the day after. It's fine now though :) I have a really high pain tolerance though.
- Q:Bowl buckle scaffold is not a pipe fitting scaffold
- Bowl buckle scaffold with steel scaffolding is different
- Q:Ok, so I'm getting a industrial/scaffolding piercing tomorrow and I'm just wandering which ear I should get pierced?I sleep on my left ear;I have I side fridge that goes over my right eye.Also I know the right ear is more popular, is there a particular reason for this?Also how much pain should I be expecting?Thankksss..
- i in my opinion might pass with the contacts. Contacts make existence plenty much less complicated than donning glasses. business piercings are notoriously complicated to heal. maximum places will pierce you with the long barbell while truly they should pierce you with 2 separate and shorter barbells with a view to cut back tugging on the jewellery. Plus, your hair with all its oils/hair products gets in it, and it particularly is cartilage, that's consistently complicated to pierce and heal. maximum individuals i be conscious of that have this piercing have grotesque hypertrophic scarring to pass with it. So I say, get your contacts now, wait and get a piercing later.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Ring lock cuplock scaffolding plank
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords