• Q6015 10 tons Topkit Tower Crane TC6015 high quality System 1
  • Q6015 10 tons Topkit Tower Crane TC6015 high quality System 2
  • Q6015 10 tons Topkit Tower Crane TC6015 high quality System 3
Q6015 10 tons Topkit Tower Crane TC6015 high quality

Q6015 10 tons Topkit Tower Crane TC6015 high quality

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Quick Details

  • Feature: Tower Crane

  • Condition: New

  • Application: All construction projects

  • Max. Lifting Load: 10 tons

  • Span: 60m

  • Place of Origin: China (Mainland)

  • Brand Name: CNBM

  • Model Number: Q6015

  • Certification: ISO9001 & CE & GHOST

  • Warranty: 12 Months

  • After-sales Service Provided: Engineers available to service machinery overseas

  • Color: Any

 

Main Features

 

1) TC6015 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Q6015 10 tons Topkit Tower Crane TC6015 high quality

Q6015 10 tons Topkit Tower Crane TC6015 high quality

Q6015 10 tons Topkit Tower Crane TC6015 high quality

Q6015 10 tons Topkit Tower Crane TC6015 high quality

Q6015 10 tons Topkit Tower Crane TC6015 high quality

 

 

Specification Parameter

 

 

 

 

 

Packaging & Shipping

 

All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.

 

Our Services

1.We can make special sample according to the customer’s requirement.

2. We have more than 60 professional technical team, provide best after-sales service

3. Fast delivery time

4. We have CE, ISO9001 and GS certification.

 

Q: What should be included in the disassembly plan of the tower crane?
- 1 -Contents and requirements of special construction plan for tower crane installation1. General situation of Engineering; 2, installation location and elevation plane3. The type, performance and technical parameters of the tower crane selected4,; foundation and attachment device set(1)The foundation of tower crane and the bearing capacity of its foundation shall comply with the product specificationRequirements for books and design drawings. Before installation, the foundation shall be checked and accepted before installation. There should be drainage facilities around the foundation.(2)Attached tower crane is used, the attachment device and set freeThe end height shall comply with the requirements of the product manual. When adhering to a horizontal distance or attachmentThe design calculation and drawing system should be carried out when the spacing is not satisfied with the requirements of the product specificationDrawing and writing relevant instructions shall be examined and approved by the technical leaders of the enterprise or through the originalManufacturer confirmation. Attachment device and component shall be the original manufacturer or by embedded partsEnterprise with corresponding ability to make. Attachment device design, the main structure of the building to support the checking.5, climbing conditions and adhesion node detail;The foundation, anchor and climbing support structure of an internal climbing tower crane shall be used as the foundationAccording to the product manual to provide the design calculation, and the internal climbing tower crane bearing structure checking.6, the main components of the weight lifting and installation position.7, the installation of auxiliary equipment; the type, performance and arrangement position.8. Rigging and special tools9, set the power supply;10, the construction personnel configuration;
Q: I don't like the cranes that use a wired pulley systems for controlling the camera.The crane will need to carry a 7 pound camcorder.
Camera okorder /
Q: I would like to buy KATO crane and I have its serial number. I wonder how I can check with serial number if the crane is Originally Made in Japan! Which site should I go for checking? It will be great help if you answer my question.
I Googled KATO cranes and found several sites. Im sure there is one that can lead you to contact information w/ the company. I happen to be a self proclaimed BEST hyd. crane operator in the states. having logged several years experience. IF you need an operator for hyd. or static line. achd73 at yahoo TonytheTiger
Q: I've read significance and accordance online. But i can't find a source for defiance, I used epub bud for the other two books but this book isn't on the website. Is there anyway I can read defiance by Shelly Crane online for free?
Read Defiance Online Free
Q: How many meters does the tower crane installation height require expert proof?
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsAnnex No. [2009]87 [Annex two]"More than a certain size of the risk of larger sub sub project scope."Three, lifting and installation, demolition works(1) lifting projects with unconventional lifting equipment and methods with single lifting weights of 100kN and above.(two) lifting equipment installation with lifting weight 300kN and above; demolition work of climbing crane within height 200m and above.The installation and disassembly of the tower crane in accordance with the provisions of the above provisions shall be verified by the expert panel.
Q: I have tried so many times to make that crane, and i always fail. Can anyone give me a video that is really good, or instructions that are really good and have pics? Thanks in advance!
heres one with others on the page. happy folding
Q: How many meters of cranes should be in accordance with the anemometer?
The state specifies the installation of wind speed meters for outdoor cranes!AskMore than how many meters need to be installed, or as long as it's outdoor, it needs installationChasing the answerThe provisions of the People's Republic of China national standard GB 6067.1--2010:9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be installed on the windward side of the crane.9.6.1.2 high speed cranes for outdoor work should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q: What is the theme of the poem A man to the universe by Stephen Crane?
In the poem “A Man said to the Universe” by Stephen Crane three distinct images appear as the reader relates man and universe as they fit into their cosmic role. The simplicity of the five line poem envelopes man’s perception of his place among the universe, the universe’s perception of its role in the order of life, and the relationship of both man and universe in regards to the enormity of the cosmos. Collectively, these three components create a profound thought on creation. By Folrani Adewale
Q: Two cranes are lifting identical steel beams at the time.One crane is putting out twice as much power as the other assuming friction is neglible, what can you conclude is happening to explain this difference?
You suggested they are lifting comparable metallic beams. we do no longer be responsive to if the cranes are comparable of their overall performance. Are they the two lifting the load in an analogous way? would be one is shifting it vertically against gravity and yet another one is shifting it horizontally. The motor performance and the operator studies would be diverse. using and coasting would reason substantial adjustments.
Q: I am writing a story for school about working in Dubai as a crane driver but I need to know what the purpose of a Crane driver is, how much they get payed and stuff like that. And if you could tell me how a crane driver can get admission in the first place, it would be really great. Thanx. And btw, this story is for Geography.Thank you. :)
i am not a crane driver myself , but into this field of construction . get a licence as driver from authority just as a car driver. know how to drive the crane ad a driver know how to operate a crane as a operator. know the performance of the crane and its limits. the salary can vary depending on the type of crane and its special features. but not in the high end grade for sure unless its a very specialised crane operation. u can ask any thing more .

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords