Stationary Asphalt Mixing Plant HMAP-ST3000
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 20 Sets per Year set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Main Equipment Composition of HMAP-ST3000 Stationary Asphalt Mixing Plant
1. Aggregate Supplying & Cold Bin:
--- Cold bin / Belt Feeder / #1ST Belt Conveyor
2. Aggregate Heating Unit:
--- #2nd Belt Conveyor / Dryer / Burner / Blower / Hot Elevator
3. Main Frame:
--- Screen / Hot bin / Weighing Unit / Mixer / Asphalt Spray Pump
4. Dust collecting unit:
--- Dust Chamber / Exhaust Fan / Bag Filter / Chimney Dust Recycling Screw Conveyor / Air Compressor & Piping
5. Filler Supplying Unit:
--- Filler Silo / Screw Conveyor / Filler Elevator
6. Asphalt Tank:
--- AP Tank / AP Feeding Pump & Piping / Hot Oil Heater / Hot Oil Circulation Pump & Piping
7. Bunker-C/Diesel Tank / Heating Unit:
--- Bunker-C/Diesel Tank / Bunker-C & Diesel Piping.
8. Control System Operation Room:
--- Control Panel / Printer / C.C TV / Power Panel / Electric Wiring.
- Q:What are the pros and cons of a concrete mixer?
- Are you talking about the production line at the blender station or is it the usual blender or that? These I understand
- Q:How much is the blender machine stirring
- The incoming material is 450 litres and can be used for 350 litres at a time
- Q:How much concrete the concrete mixer can stir at a time
- 350-concrete mixer is a double conical turning out of the feed mixer, and the plastic and semi-dry hard concrete of 60 mm. Stirring when the mixer is turning, and automatically when reversing. Each can be mixed with concrete 0.35 cubic meters. Depending on the size of the concrete, the amount of cement used varies.
- Q:How to safely use concrete mixer
- Action steps for concrete mixers: 1, switch the function switch from the column to "automatic" position, press the start switch on the controller, and the whole operation will operate automatically. After the whole process is finished, it will stop automatically, and in the running project, if it is necessary to stop, press the stop button and then restart. After the start button is pressed, the display begins to show time, slow, sand, fast, stop, fast, and run the light on time. When automatic control, all the switches must be allocated to the stop position.
- Q:For example, what is the more detailed and better td-50 td-80 td-60
- Concrete mixer: mainly consists of mixing, loading and unloading mechanism, water supply system, original motive, drive mechanism, frame and supporting device. Concrete mixer function: To make each component macroscopically homogeneous; To destroy the phenomenon of cement grain reunion and promote the development of dispersive phenomena; The initial water coating on the surface of the cement particle. The effect of the friction between the material particles and the dust film is reduced. Increase the frequency of the unit and the cross frequency of the moving track, accelerate the homogenization
- Q:250 litres of the blender once made concrete
- 250-litre agitator is measured at a time of 0.25 m3, which is about 80% of the amount in real time, avoiding mixing and mixing
- Q:How does a concrete mixer operate
- Before the concrete mixer starts, check the controllers for good. 2, the concrete mixer must clean the inside when used, especially in the winter, no foreign material in the front roller should be used, thus extending the service life. The concrete mixer should be placed in a firm place, and shall be secured with the support of the scaffold or the support of the shaft, and shall not be supported by the tyre. When the concrete mixer is in operation, it is strictly forbidden to put the tools in the roller, and pay more attention to safety. 5, concrete mixer in the feed hopper rises, for the sake of safety, personnel are strictly prohibited by or stay under the hopper, after the completion of the work of the mixer hopper fixed; When the concrete mixer is on site, it should be fixed in the mixer, cut off the power supply, and get into the mixer cylinder In custody
- Q:Concrete mixers need to be aware of which things
- The concrete mixer should be set in a flat position, and the wheel shaft will be placed on the back and back of the square, so that the tyre should be set up so that it will not move during the run. 2, the concrete mixer should be protected by secondary leakage, and after the power connection is put on before work, it must be carefully checked, and it will be used only if it is considered qualified by the empty car test. Commissioning should check when mixing drum speed whether appropriate, under normal circumstances, the proportion of empty car speed car was faster (after loading) 2 ~ 3, such as the difference is more, should adjust pulley and the proportion of the driving wheel. The rotating direction of the mixing cylinder shall be in accordance with the direction of the direction of the arrow, if it is not true, the motor connection shall be corrected. 4, check whether the transmission clutch and brake is flexible and reliable, wire rope is damaged, track pulley are in good condition, surrounded by accessibility and lubrication situation of each part. After turning on the machine, it is often noted that the parts of the concrete mixer are working properly. When stop, check whether the concrete mixer blade is bent and the screw is loose or not. 6, when the completion of concrete mixing or pause is expected to more than 1 h, besides excess stock out of the net, the application of stones and water to pour into shaking inside the cylinder, turn on, put the glue on the cylinder of the mortar all discharged after rinse. No water is allowed in the cylinder in case the cylinder and blade are rusted. It should also clean up the outside of the mixing cylinder to keep the machine clean. 7, after work and stop after work, should pull off power without power, and lock switch box, to assure safety.
- Q:What is the type of concrete mixer?
- There are 250, 350, 500 and so on, and the model is for his capacity. Is that satisfactory?
- Q:What is the difference between a concrete mixer, a JL type and a JW type?
- Hello, concrete mixer is generally divided into forced (JS, JD, JW, Jacqueline Nottingham), and since the fall mixer (JZ JF) two categories, the national standard and there is JL this model, there may be enterprises themselves so named. JW only thing forced vertical turboprop mixer, mainly used in the dry rigid concrete mixing, as some concrete pipe pile and casting factory is used, but this model is old, now in the new production line is generally choose Jacqueline Nottingham vertical planetary mixer, JW stir more than sufficient.
1. Manufacturer Overview |
|
---|---|
Location | Liaoning, China |
Year Established | 2001 |
Annual Output Value | US$1 Million - US$2.5 Million |
Main Markets | South America Eastern Europe Southeast Asia Africa Mid East South Asia Domestic Market |
Company Certifications | ISO 9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | DALIAN |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | English, Chinese, Spanish, Portuguese, Arabic, French, Russian, Hindi |
b)Factory Information | |
Factory Size: | Above 100,000 square meters |
No. of Production Lines | 2 |
Contract Manufacturing | OEM Service Offered |
Product Price Range | Low and/or Average |
Send your message to us
Stationary Asphalt Mixing Plant HMAP-ST3000
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 20 Sets per Year set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords