• Precast Concrete Purline Building Equipment System 1
  • Precast Concrete Purline Building Equipment System 2
  • Precast Concrete Purline Building Equipment System 3
  • Precast Concrete Purline Building Equipment System 4
Precast Concrete Purline Building Equipment

Precast Concrete Purline Building Equipment

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
5 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Precast Concrete Purline Building Equipment


1.   Structure of Precast Concrete Purline Building Equipment:


Precast Concrete Purline Building Equipment is our special developed products as results of our engineers research, with which 60%steel material will be saved compared with traditional revolving die method .Efficiency can be improved 3 to 5 times compared with conical die method, these machine are easy for operation and convenient for maintenance, products from these machines are in good quality, smooth appearance and accurate in size.

 

 2.   Main Features of Precast Concrete Purline Building Equipment: 


• One machine can make one slab lower cost, high Wear-resistant, long service life.

• In case of quality problem the company provide free replacement.

• Provide technical support for free.

• Provide consumers with regular visits

• Simple structure, easy operate, less wear parts

 

3.  Precast Concrete Purline Building Equipment Images:

Precast Concrete Purline Building Equipment

Precast Concrete Purline Building Equipment

Precast Concrete Purline Building Equipment

4.  Prefabricated Concrete Purline Compression Molding Machine Specification:

 

Product name

Type

Productivity

Hole number

Concrete purline  machine

60*120*140*

1.3-1.5m/min

4

Concrete purline  machine

60*130*150*4

1.3-1.5m/min

4

Concrete purline  machine

60*140*160*4

1.3-1.5m/min

4

Concrete purline  machine

70*150*170*2

1.3-1.5m/min

2

Concrete purline  machine

80*160*180*2

1.3-1.5m/min

2

Concrete purline  machine

60*110*130*4

1.3-1.5m/min

4

 

Model no.

No. of holes

Dia.

No. and dia. of wires

Electric motor power(kw)

Vibrator Motor Power(kw)

Total Power

(kw)

Max. span

Molding Speed(m/min)

Overall dimension

(mm)

Weight

(kg)

60X120X140X4

1

30

5/5

4

1.5

5.5

3.5

1.3-1.5

2250×900×850

1000

60X130X150X4

1

30

6/5

4

1.5

5.5

4

1.3-1.5

2250×900×850

1000

70X140X160X4

1

30

8/5

4

1.5

5.5

4.5

1.3-1.5

2250×900×850

1050

70X150X170X2

1

30

8/5

3

1.5

4.5

4.7

1.3-1.5

2250×900×850

750

60X110X130X4

1

30

6/5

4

1.5

5.5

3.5

1.3-1.5

2250×900×850

950


Production Line Layout


Precast Concrete Purline Building Equipment

 

Production Process 


Rebar tensioning

Precast Concrete Purline Building Equipment

Raw materials preparing

Precast Concrete Purline Building Equipment

Molding

Precast Concrete Purline Building Equipment


5. Packing & Delivery


•  Wire cables are used for fastening the machine on the trailer or inside the container.

•  Machine covered with plastic film.

•  Machines can be packed in tarpaulin or wooden case according to customer’s needs.


Precast Concrete Purline Building Equipment


6. Customers from All Over The World

Precast Concrete Purline Building Equipment


7. FAQ: 


We have organized several common questions for our clients, may help you sincerely:

•  What information we need to confirm with you before send a formal offer?

What kind of slab you want to make, wall panel, roof panel, lintel or something else?

Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.

•  Have you use this kind of machine before? 

Our machine is totally different from European machine. Please don’t follow their instructions.

•  How long can we receive the product after purchase?

In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.

 

8. Why choose us:


•  30 years manufacturing experience.

•  Constitutor of the.

•  More than 10 patents.

•  Passed ISO9001:2000 quality system certificate.

• More than 10 types of machine and over 100 models for choose.

Supply complete set of technology and equipment solution.

• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.


9. Our Service:


•  We supply the technical supporting all the time.

•  We supply one year warranty for whole machine.

•  We supply free quick wear parts. 

•  We supply low charge continue maintenance when warranty is expired.

•  We supply free training to end-users

 

 


Q:Hey, so I'm currently working on business coursework. We need to create a made up a business and i have chosen one of those businesses that print peoples picture on to items such a t-shirts, coasters mugs etc.. On one section i need to talk about the equipment and machinery i will need and to be honest i have no idea! could anybody give me a list of them?
We are a company in heat transfer machine ,we can provide complete solution .you contact me on skype : c0400225
Q:Who builds machinery to produce expanded metal ?
google for it
Q:I'm not very fond of walking on the treadmill for half an hour or going to the gym and using those big, scary machines. O.oBut I really want to lose weight and stay healthy, just without all that metal tearing me apart. What kinds of exercises are best for losing weight without the use of machines?
I go on walking trails.
Q:what is difference between machinery and equipment?
A turbo-machinery engineer would be a specialty within the rotating equipment engineering category.
Q:I plan to dig a deep hole in Central Texas and the dirt is rather hard. I will be working alone. What hand tool would allow be to do this quickiest?
You may have what is called caleche and it's very hard to dig through, the only thing harder is solid rock. The only things I know that you could use is a pick, shovel, and rock bar. A hand drill and explosives would work but the neighbors might have something to say about that, not to mention the cops.
Q:i want to buy from china
through the service you just like engage a agent in China to help you to find what you need in China.
Q:describe the ways in which bacterial machinery can be utilized to replicate mammalian genome?
NONE NON-EXISTENT WON'T
Q:i am looking to go to school for machinery operating like cranes, hyax bull dozers that kind of stuffand i cant find anything in troy new york. I dont know hat i am doing wrong i just recently moved up her. Can anyone help me please? thank you
Here okorder /
Q:Why won't the machinery implement an optic pie?
Cherry pie.... is very difficult to find.
Q:How does operating machinery under water complicate mining procedures?
Absolute pressure at the surface is 14.7psi. Absolute pressure at 250 feet of see water for example is 126psi. That puts the machinery and people into a very different world that us surface dwellers from the get go. The BP job was at something like 7000 to 8000 feet if I remember correctly. That's about 3352psi. People can only dive to about 1000 feet of sea water. So on the BP job there were no people down there working. Everything we saw was from ROVs. Remotely Operated Vehicles. Doing things with a claw that is controlled by a joystick through a TV screen is very different from doing it with your own hands when you're right there looking at it. Even when you do have divers down there they usually only have 1 to 4 people. That's a limited team. They do not have a big box full of tools down there with them. They have the surface crew send the tools to them as needed. Salt water is not good for any kind of tool. It makes them rust and makes the seals break down. This leads to tool failure and many trips back and forth for replacements and repairs. The surface crew is usually young guys 18 to 25 who are not the most mature or reliable people in the world. Tool maintenance does not always get done properly. Divers are regular people. They are stubborn, arrogant, lazy, dumb and any other thing that you run into with coworkers anywhere. If they feel like sitting down for a break, the boss can't always keep a proper watch on them or come down and yell at them. We just finished a well abandonment job where we did the same thing with plugging a well with concrete just like the BP job and it took us 6 tries. That technique doesn't work too good at shallower depths either. This stuff is still full of bugs buts the pursuit of money keeps things moving beyond what we truly understand.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords