PM concrete pump piston seal DN200
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Name | Concrete Pump Piston |
Size | SCHWING: DN180/200/230/250 PM : DN180/200/230/250 KYOKUTO: DN230/225/205 CIFA: DN178/DN200/DN230 ELBA: DN200/230 ZOOMLION: DN180/200/220/230 SANY: DN180/195/200/230/260/280 Other sizes and types upon customer’s requirement. |
Material | Polyurethane,Natural rubber |
Application | Used in concrete pump |
Service Brand | Schwing, PM, Kyokuto, CIFA , Zoomlion, Sany, and so on |
- Q: What are the mixing arms of the concrete mixer?
- Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
- Q: Building materials, equipment, components and fittings products must have "three certificates" is what cards?
- Three is a business license, certificate of product quality, product quality inspection certificate. Business license is the legal provisions of some industries must be licensed, and handled by the competent department of the operating permit, such as tobacco monopoly license, drug business license, business license and other dangerous chemicals.
- Q: How are the machine parts stacked?
- Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
- Q: What are the mechanical drawing software?
- Personally, CAD is suitable for large machines or buildings, and CAXA is the real machine industry's universal software, and can also save drawings in various formats.
- Q: China mechanical net
- From Chinese GM parts, general machinery, hardware, tools, instruments, electrical appliances and related equipment, textile equipment, chemical equipment, agriculture, food equipment, construction equipment, environmental protection equipment, mining equipment, metallurgical equipment, financial equipment, commercial vehicles and accessories, machinery processing equipment, machinery processing industry machinery enterprises and mechanical products
- Q: Construction machinery production need to deal with what documents?
- The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);
- Q: How are buildings, installations and materials divided?
- Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
- Q: Where does Heilongjiang do the most construction machinery?
- In the world, the industry address basic similar, of which the United States and Britain called the construction machinery and equipment, construction machinery and equipment for Germany, Russia called for the construction and road construction machinery, construction machinery called japan. In China, some products are also known as construction machinery, and in the mechanical system, according to the State Council to set up the industry approval, collectively referred to as construction machinery, has continued to the present
- Q: What are the construction materials, components, fittings and equipment in construction?
- : construction engineering materials, components, fittings, equipment, each refers to: 1, engineering materials: engineering materials mainly refers to raw materials. Such as: sand, stone, steel, etc., there is no processing materials. 2, structural parts: the main structure here is the main structure of the building, the two structure and other accessories. Most of the semi-finished products and the structure of part of the installation accessories, such as: beam beam, continuous beam, beam, beam, cantilever beam, curved beam; steel, timber, concrete beam.
- Q: What functions should be achieved in mechanical structure design?
- The function of the mechanical structure is mainly realized by the geometry of the machine parts and the relative position between the parts. The geometry of a part is made up of its surface, and a part usually has a number of surfaces, some of which are in direct contact with the surface of other parts, and this part of the surface is referred to as the functional surface. The connecting part between the functional surfaces is called the join surface
Send your message to us
PM concrete pump piston seal DN200
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords