L46A1 Mast Section for Tower Crane
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Set pc
- Supply Capability:
- 1000 Sets Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
L46A1 Mast Section for Potain Tower Crane
We supply different types of mast sections, anchorage collar and base frames for widely used tower crane models, with high performance and reasonable cost.
1.The steel material selected 100 % comes from our national large-scale steel corporations .
2.The critical materials that steel, welding material etc are all checked by chemical detection , then They are allowed into workshop for batch production.
3.Strictly conforms to drawing requirements, we make the products with 16 Manganese,40 Chromium and 45#steel etc .
4,Every parts of our products that pins ,axles,sleeves etc are strictly obey quenching and tempering procedures .
5,Every parts of our products strictly conforms to the procedure requirements : mill ,plane, polish, press ,test etc in turn.
6,As for have finished products ,we perform the requirements of theISO9001 Quality System and national standard strictly.
Our advantages:
1.We are state-owned company and well-funded;
2.State-level R&D department;
3.Competetive price and great quality;
4.Complete after-service system;
5.Experienced in the import&export business
Specifications of L46A1
Size:3m*1.6m*1.6m
Weight:1180kg(±10kg)
It is equipped with the fixing bolts, pins, inside ladder and resting platform(3 mast sections with 1 resting platform)
We supply different types of mast sections, anchorage collar and base frames for widely used tower crane models, with high performance and reasonable cost.
Packaging & Delivery:
Nude in containe
about 15-30 days after receiving T/T payment
- Q: What are the mixing arms of the concrete mixer?
- Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
- Q: What are the sectors of machine building and parts processing?
- 3., machinery manufacturing is also a kind of industry, many industries have parts manufacturing, processing links. Therefore, the processing of parts does not belong to a particular industry.
- Q: What are the main functions of construction equipment monitoring system?
- This belongs to information management engineering. The control part is the "heart" and "brain" of the whole system. It is the command center to realize the function of the whole system. The control part is mainly composed of the main console (some systems also have a secondary console). The main function of the total console: video signal amplification and signal distribution, image correction and compensation, image signal and image signal (including switching or voice signals) record, cameras and auxiliary components (such as camera, PTZ, shield) control (remote control) and so on.
- Q: What are the principles, performances and uses of the commonly used construction machinery equipment?
- 1.: concrete pump principle: concrete pump driven by motor pump system, the conveying capacity of constant power control of hydraulic system of concrete pump automatic control, manual control can also be used to select the concrete delivery volume. Performance: 1. using the hydraulic system of double pump double open circuit, the main pump valve swing circuit and S circuit are separate for fault diagnosis and removal; 2. pumping hydraulic circuit adopts the main valve pilot pressure control; 3. hydraulic system has safe relief protection, while the main pumping system overpressure, oil pump automatic pressure cutting off; 4. switching circuit with constant voltage supply with the energy storage device, so as to guarantee reliable swayingforce large and have the advantages of energy saving effect; 5. pumps and valves are used continuously, the world famous brand is more reasonable and more reliable and easily realized commodity concrete transport quantity adjustment; 6. hydraulic pipeline with cone seal pipe joint sealing material; 7. pumping circuit adopts a valve block mode of high and low voltage switch, convenient, no leakage; 8. with oil and oil filter technology, foreign body into the hydraulic system. Further improve the hydraulic system reliability and component life; 9. hydraulic hose hose. Use: widely used in commercial concrete demand for large, high grade and strict quality requirements, long conveying distance of high-rise buildings, municipal construction, electric power, energy, transportation and other civil and industrial buildings, especially the construction of the narrow space more show its true colour of a hero.
- Q: Building materials, equipment, components and fittings products must have "three certificates" is what cards?
- Three is a business license, certificate of product quality, product quality inspection certificate. Business license is the legal provisions of some industries must be licensed, and handled by the competent department of the operating permit, such as tobacco monopoly license, drug business license, business license and other dangerous chemicals.
- Q: What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
- For Turner, fitter, main work gloves, hats, goggles for welder, etc.; there are gloves, shoes cover, goggles, insulated shoes etc.;...... ;
- Q: Where are the mechanical pressurization air supply facilities set up?
- The purpose of setting up a mechanical pressurization air supply smoke prevention system is to provide evacuation routes and shelters without smoke interference in the event of a fire in the building. Therefore, in the closed door, pressing position, and the fire floor must maintain a certain pressure difference, the position of the air pressure value is a relative positive pressure); at the same time, in the open part of the pressure when the door can have enough air velocity in the opening section, to effectively prevent the intrusion of flue gas, the safety of personnel ensure evacuation and refuge.
- Q: Where are the hanging baskets for the building?
- It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
- Q: What are the sub projects of a construction project?
- Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects
- Q: What is the difference and connection between equipment manufacturing and machine building?
- When our company went to the training center of the Department of industrial engineering of Tsinghua University, the professor of Qinghua University told us about it. Equipment manufacturing industry is a general term for the equipment provided for the national economy and national security
Send your message to us
L46A1 Mast Section for Tower Crane
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Set pc
- Supply Capability:
- 1000 Sets Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords