Plate factory
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Track plate isthe main structural component of the passenger dedicated ballastless railway, theaccuracy and quality of which determines directly the level of constructionquality of the ballastless-track. At present, the ballastless Passenger Line oftrack plate generally set at the construction site prefabricated field. Ourcompany uses the factory management, standardized assembly-line; applicationsand process of mechanization and automation, so that our products have theoutstanding advantages of reliable quality and controlled precision.
List of equipments for track plate-II field
No. | Name | Remark |
1 | Mold | Track plate steel mold |
2 | Shell of the rail platform | Moulds |
3 | 1.5Kw Vibrator and control system | Vibrate concrete inside the mold of track plate. |
4 | Hydraulic station and Control system | Prestressing o reinforced steel with uniform and synchronization. |
5 | Tensioned beams and anchorage | Fixing reinforced of φ5、φ10 and withstanding tensile force. |
6 | 5T Electric single-girder crane | Reinforced processing plant package. |
7 | 16T Electric double-girder crane | The main plant package 、vacuum lifter, and other high-weights. |
8 | 8T+8T Electric double-girder crane | The main plant package,lifting concrete transport tank, steel mesh and other high-weights. |
9 | 16T/16T Electric double-girder crane | Grinding chamber package,lifting special plates and other high-weights. |
10 | 16T Gantry crane | For lifting semi-finished products and finished track plates. |
11 | 3m³ Mixing station | Stirring concrete used for track plates. |
12 | 3m³ Wheel loader | Transporting aggregate from mixing station. |
13 | Stone washing machine | Washing the aggregates. |
14 | Concrete truck | Transporting tanks of concrete. |
15 | 4m³ Transport bucket of concrete | Transporting concrete from mixing station to distributor. |
16 | Distributor | Pouring concrete into the mold. |
17 | 3kW Pressure washer | Cleaning concrete equipment. |
18 | Utility vehicle | Transporting industrial vacuum cleaners, steel tray, and plastic film reel. |
19 | Reel of conservation film | Cover and pack up the conservation film in fabrication line. |
20 | Vacuum lifter | Lifting semi-finished track plate from the mold and placing in temporary storage station. |
21 | Brushing machine | Napping horizontally, controllably, uniformly the concrete surface along the rail board longitudinally. |
22 | Cutting car | Cutting prestressed reinforced between adjacent molds. |
23 | Stripping oil jet | Spraying the releasing oil into the mold. |
24 | 13kW Vigorous cleaner | Clean up the mold crumb. |
25 | Transporter of battery | Transporting semi-finished track plates. |
26 | Reinforced cut-to-length | The cut positioning tendons of φ5accurately, and prestressed tendons of φ10. |
27 | Mold circulation heating system | Enhancing ambient temperature of the lower portion of the production line mold. |
28 | Synchronous thermostat conservation system | Maintaining concrete and test block inside the track plate mold. |
29 | Grinding machine | Grinding semi-finished track plate to meet the requirements of using the track plate. |
30 | Tipper | Flipping the track plate and placing it on the roller frame smoothly. |
31 | Roller conveyor line | Used for grinding the production line and transporting track plate automatically. |
32 | Roller conveyor line control system | Roller conveyor line package. |
33 | Reinforced cutting machine | Cutting the protruding part of reinforced steel. |
34 | Grease quantitative filling machine | Used to inject the grease quantitatively into the plastic sleeve. |
35 | Sliding truck | For transporting finished track plate horizontally. |
36 | 28T/h Sewage treatment system | Used to polish the water recycling. |
37 | Transporter of battery | For transporting finished track plate |
38 | 600Kw·A Grinding machine regulated power supply | Providing stable voltage for grinding machine. |
39 | ZL5 Smart bridge tester | Testing the insulation performance of finished track plate. |
40 | 1000kV·A Substation and distribution system | Supplying electricity. |
41 | 6T Steam boiler | Supplying heat. |
42 | 6m³ Air Compressor | Generating compressed air, supplying production line’s technology and equipment with gas. |
43 | 500kW·A Standby generator | Reserving. |
44 | Laboratory Equipment | |
45 | DNA03 Level instrument of high-precision | Measuring the flatness of the model. |
46 | TCA1800 High-precision total station | Testing finished products. |
47 | 499V Resistance Tester | Detecting reinforced node resistance. |
48 | Automatic leveling test platform | Leveling track plate automatically to facilitate detection. |
49 | Reinforced tension monitors | For single reinforced tension detection. |
List of equipments for track plate-I field
No. | Name | Remark |
1 | Mixing station | |
2 | Loader | Feeding materials. |
3 | 5T hanging Truss | Reinforced room. |
4 | 10T hanging Truss | Pouring concrete, stripping, reversing plate, conserving. |
5 | 10T Gantry crane | Saving and loading plates. |
6 | 8T Concrete flatbed | Transporting concrete. |
7 | 30T Finished flatbed | Transporting finished. |
8 | YGB180 Jack | |
9 | High-frequency attached vibrator | Depend on the test. |
10 | 25T Crane | |
11 | 50L Compulsory mixer | Mortar. |
12 | Automatic temperature control system | |
13 | Anchor hole chiseling machine | |
14 | Prestressed steel bars tensioning device | |
15 | Seal windlass for anchor points mortar | |
16 | Model | |
17 | Track plate hanger | |
18 | 30kW Generator | |
19 | 500kV-A Transformer | Outdoor |
20 | Steel bending machine | |
21 | Steel cutting machine | |
22 | Straightening and Cutting Machine | |
23 | Stone washing machine | |
24 | 4t-1.25MPa Steam boiler | |
25 | 2t-1.25MPa Oil-fired boiler | |
26 | >2.5m³ Hopper |
- Q: Ask for a transverse, boring, engineering machinery?
- Municipal Engineering, I do not know how many of your projects, do not have to buy one? Ask for a project and rent one
- Q: I work all day in the office and i don't think i might have enough time so i'm trying to workout at home, without having to buy any expensive machinery. And if possible a diet program that comes with it?
- sit up and push ups
- Q: I want to know the essential machinery required to start an auto body building workshop.
- try utilising Boolean words which contain no longer Or and And. to that end you're able to need to place motor vehicle fix shops And colorado with the citation marks. With this occasion you will get carry of something that has motor vehicle fix shops with colorado. whilst typing motor vehicle physique fix shops colorado you in basic terms get carry of websites with those words in them. wish it facilitates!
- Q: I have a few questions about this. I have 13 years experience driving all kinds of things. I use backhoe, front end loader, forklift and large trucks with trailers.Is there a demand for people with my skills in Denmark?How much money could I expect to make?Do any of the vehicles I use require a special license in Denmark?
- I wonder why you don't check this and instead keep issuing questions on Yahoo answers for which you are likely to get incorrect info In less than a minute on google I could find the official immigration dept site in Denmark and the page on skilled migrants like what you are talking about (and which I informed you about in the last question) As you can see here www.nyidanmark.dk/en-us/coming_to... it is a very clear concise site and it gives a link to exactly which occupations are considered as in demand www.nyidanmark.dk/en-us/coming_to... and drivers (forklift or otherwise) are not on this list Also it clearly stipulates that you must already be earning a salary level of minimum DKK 463,050 per year which is approx 62,077. Therefore I think you can assess by yourself the chances of receiving a working visa.
- Q: Like make it gone forever. Just dirt. Tree's aren't a problem but the other small plants are. I have some land that i go to shoot on and its overgrown. So id like to make it look a little better and i want to lesson the amount of ticks and snakes if that's possible. ( i cant mow on account of rocks, junk, etc)
- well, okorder /
- Q: I am looking for the Leather Picker , Leather Buffer and Picking Stick use in Power Looms, Kindly make contact with me from Pakistan Only with cheap best quality . Any person who can help out me please make contact with me on this email address
- LEATHER PICKERS NO. S-6 FOR SAKAMOTO LOOMS. LEATHER PICKERS NO. S-5 FOR SAKAMOTO LOOMS LEATHER PICKERS NO. S-7 FOR SAKAMOTO AUTO LOOMS. LEATHER PICKERS NO. 22 FOR PLAIN LOOMS. LEATHER PICKERS NO. 22 (L) FOR TURKISH MARKET. LEATHER PICKERS FOR CARPET LOOMS. LEATHER BUFFERS FOR SAKAMOTO LOOMS. HIGH COMPRESSED WOOD SHUTTLES FOR COTTON IN DIFIRENT SIZES. HIGH COMPRESSED WOOD SHUTTLES FOR AUTO LOOMS IN DIFIRENT SIZE. HIGH COMPRESSED WOOD PICKING STICK OF ALL TYPS. HIGH COMPRESSED WOOD SIDE LIVER.
- Q: We manufacture machines and we need to supply a machine to India. In the U.S. the machine uses 240 VAC 3-phase, so we need to know what 3 -phase voltage is available in India.
- I would ask the company that is buying the machine. They can put you in touch with the Power supplier if necessary.
- Q: What types of machinery are needed to produce a computer and it's parts?BEST ANSWER 10 POINTS WITHIN THE HOUR!
- Like from scratch? All of the parts? I would start with a factory which can build chips. You will need to produce all the chips in your computer; CPU, RAM, and a bunch of other chips for I/O access etc. Then you will need to produce the motherboard PCB. Then another factory to build hard drives and optical drives. Then another factory to build the case. Oh, yes, another one to build power supplies. But nobody builds computers like this. A manufacturer will make some parts but buy the rest from suppliers.
- Q: I am from Turkey and want to import textile machinery parts such as leather picker and wooden shuttle
- TESTEX is a leading developer and manufacturer of textile testing equipment since 1991, focuses on developing and manufacturing textile testing equipment.
- Q: Filling out an application for a secretarial position and they ask to list production mobile machinery.
- Mobile phone, laptops, fax machines - something that is used in the working capacity that is production work? - portable jet wash machine, burger van? Try searching it for more info but for a secretarial position I would presume they mean mobiles, laptops etc
Send your message to us
Plate factory
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords