• PE compound System 1
PE compound

PE compound

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1tons m.t.
Supply Capability:
500tons m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
TypeProductApplication
NDHBlack LDPE jacket compound for resistance to environment stress crackJacket of telephone cable,RF cable and optical cable
LDHBlack LLDPE jacket compoundJacket of telephone cable,and optical cable
MHBlack MDPE jacket compoundJacket of  optical cable.aerial cable and power cable
GHBlack HDPE jacket compoundJacket of  optical cable.High stregth and abrasion resistant jacket
NLDJBlack weatherability LLDPE insulating compoundInsulation of aerial cable,less than 1kv
NGJBlack weatherability HDPE insulating compoundInsulation of aerial cable
ZPEFlame retardant PE compoundFlame-retardant insulating or jacket of 70~90°C wires and cables
RDHFlexible PE jacket compoundFlexible PE jacket of 70°C wires and cables

 

Q: What brand of cable is good, what are the top ten brands of wires?
Power circuit box, the home of the circuit is divided into lighting, walls, air conditioning, etc., there is the bathroom and the kitchen line and the separation of the room.
Q: Ipad not charge how the matter. Said the cable or accessories have not been certified, and may not be able to cooperate with this ipad reliable work....
Then you get the repair station to see what is the problem
Q: Rt, the charger did not change, has been no problem before, today just plugged into the charger, the results appear as if the problem, before the out of this problem, and now only ipad power off after the power can not be charged, and ipad start , Then immediately prompted the title, can not charge more
At the same time, security monitoring line itself is a weak line
Q: Cable a fire line power and why the other did not pick up the line with a pen test also have electricity? Answer detailed point
casing filled with dry cement, and with a wooden hammer tamping, but a certain idea of security, high pressure line once rammed the skin is too dangerous, should be done before power, you now estimated to have power,
Q: Apple mobile phone does not support this charge when charging this thing how to charge
Yes, it is more conducive to the protection of the battery, but if no power out of power, the data can not be saved ah, and you have to put the battery on a regular charge
Q: Decoration when the purchase of water pipes, wires and other items included in the account
KVV is the control cable, generally do industrial control; and RVS is twisted pair, generally used for weak system, to eliminate the interference requirements of the occasion, such as two-wire bus system, specifically, the electrical fire bus more Such as RS485 bus and so on.
Q: Why this cable has not yet been certified
The manufacture of wire and cable is completely different from that of most electromechanical products
Q: What is the difference between the WDZ wire and cable, the ZR wire cable and the NH wire and cable, and what kind of wire and cable should be used?
Make a mark, such as red set into the bottom for a color in a layer, or you can draw a few plans, water and electricity is a strong power is a weak and one, the label can do a good job
Q: Why does the bird stand on the wire without anything, but if people touch it,
Is not the home of the bus box? Generally put a cat, a router, a power outlet, two transformers, the other is the network cable and telephone, the key space to be enough
Q: This cable or accessory has not been certified and may not be able to work with this iphone reliably
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords