• Cable Tray Z160 System 1
  • Cable Tray Z160 System 2
  • Cable Tray Z160 System 3
Cable Tray Z160

Cable Tray Z160

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
5ton m.t.
Supply Capability:
10000 ton/year m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Cable Tray, Perforated Cable Tray, stainless steel cabletray of Cable Tray Z160

 Perforated cable trays have three load carrying capabilities: Heavy Duty Return Flange, Medium Duty Return Flange and Light Duty. 

Features of Cable Tray Z160

-- Increase the current carrying capacity of cables

-- Takes up to 25 percent less space than ladder

-- Hole pattern designed to provide maximum flexibility for positioning cable ties

-- Speed of installation

Specification of Cable Tray Z160 

-- Thickness: 0.5 mm - 2.0 mm (22 - 27 Gauge)

-- Height: 15 mm - 75 mm (Light, Medium, Heavy Duty)

-- Width: 50 mm - 900 mm

-- Length: 2-6M (can be produced according to appointed length)

-- Finished: Pre-galvanized (Z80 - Z275), hot dipped galvanized, power coating

Range

Height

Width

Thickness

Light Duty Cable Tray

15-20

50 - 900

0.8 – 2.0

Medium Duty Cable Tray

25

50 - 900

1.0-2.0

Heavy Duty Cable Tray

≥35

50 - 900

1.0-2.0

Other Shapes & Sizes Are Available Upon Request.

 

 Cable Tray Z275

 Cable Tray Z160

 

Q: Four lines only reached a phase line, at the other end all charged, I use the digital pen! In addition, I often check the cable when the cable current through the dot digital pen voltage symbols sometimes have time to disappear, in other bare wires when the test keys are normal! What is this going on! Ask the heroes to give the younger brother a complete point of the answer! More
Bookstore tool book should have "communication project budget", I do is what you say, the budget is divided into estimates and budget, is two steps. So that is not very clear. But what is needed is the preliminary design of the project. The budget is needed for design and drawings. Internal management of this piece, the main thing is that you need to do what the project department, and are generally very complicated
Q: The data line is my online to buy the extension of the line, has been able to use, and today suddenly can not charge the electricity, and pop up the tips, which is why? More
What do you want to do? Do network cabling buried? Or in the building after the tube?
Q: What machinery is required to make wire and cable?
Line pipe is poured before the concrete is laid on the cloth, fixed on the template or steel, pouring a need to install a class at any time to adjust its position!
Q: Ipad not charge how the matter. Said the cable or accessories have not been certified, and may not be able to cooperate with this ipad reliable work....
Several sets of cables in the same height of the laying, the adjacent cable between the bridge should be considered maintenance, maintenance needs, generally not less than 0.6m. This is just a matter of theory, it does not matter. Anyway, the actual construction is to do so,
Q: IPadmini. The latest version 7.1.1 up in the morning to see the non-stop display this cable is not certified does not support this feature. The The Charger original. Not on the computer charge. The Ask God to answer more
Ipad charge display does not support the general reasons for this and processing methods: . for non-original charger, it will often appear this situation, which is due to the charger does not meet the specifications caused by the replacement of a qualified charger can be. . if the original charger appears the above failure, please continue to look down. . please check whether the data line is normal. The appearance of the data lines seem normal, which may have been broken. Check the method is to borrow someone else's data line to see if it can charge. . shows the plug symbol is normal is full of display. If full or show the lack of electricity, indicating that the phone tail no problem. . again, check whether the original charger can work properly. You can connect the charger to other USB port to see if the phone is working properly. . if the above two check still can not charge, please try to insert the computer's USB port to see if the computer can identify the phone, to identify if it is to see if the charge, if not identified but not charged, it is estimated that the need for maintenance. If you can not identify can not charge, it is necessary to repair. If you can recognize and charge, replace the data cable and the charger (the original estimate is also damaged). . and then look at the voltage is not too low, not only to the maintenance station to repair, and pay attention to the iPad and iPhone do not mix the power adapter, the voltage is different.
Q: Wire and cable: RVFV. : RVFSV. : UTP-CAT5E. : SYV-F-75-5 : RVFSP. : RVSP. : RVFVSP. What is the type of wire? Solve! More
Wipe with water that day. You can also use ink thinner
Q: Decoration when the purchase of water pipes, wires and other items included in the account
KVV is the control cable, generally do industrial control; and RVS is twisted pair, generally used for weak system, to eliminate the interference requirements of the occasion, such as two-wire bus system, specifically, the electrical fire bus more Such as RS485 bus and so on.
Q: Why this cable has not yet been certified
The manufacture of wire and cable is completely different from that of most electromechanical products
Q: Why does the bird stand on the wire without anything, but if people touch it,
Please provide air-conditioned three-leg socket photo, because you said "open inside is 2.5 square line ~ is a separate line ~" is not very understanding.
Q: This cable or accessory has not been certified and may not be able to work with this iphone reliably
The operation of the hydraulic pipe is very simple to see it will engage in their own, embedded more simple, and then get the construction site in accordance with the requirements of the drawings put away, tied with tie wire on the OK Mouth up the pipe to use cement bag to prevent good, to prevent the infusion of concrete, so buried even if the end

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches