• Paint/Galvanized Cuplock Scaffolding system,Construction Scaffolding System,Scaffold System System 1
  • Paint/Galvanized Cuplock Scaffolding system,Construction Scaffolding System,Scaffold System System 2
Paint/Galvanized Cuplock Scaffolding system,Construction Scaffolding System,Scaffold System

Paint/Galvanized Cuplock Scaffolding system,Construction Scaffolding System,Scaffold System

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Paint/Galvanized Cuplock Scaffolding system,Construction Scaffolding System,Scaffold System


Prouduct information:

    1. Workcover NSW approved and registered

    2. Lightweight for easy setup and use

    3. 6 inch wheels for easy manueverability

    4. Foldup Frame for sale. Fast and easy setup

    5. Superior grade aluminium construction


Cuplock Scaffolding

Cuplock scaffolding is one of the world’s widely used systems.

It’s unique circular node allows up to 4 components to be assembly in quick action.

 

Detailed information:

Steel Tube:  Diameter:48mm  Thickness:2.75mm/3.0mm/3.2mm

Steel Grade: Q235,Q345

Surface:     Hot Dip Gal., Electro Gal., Painting

Component:  Standard, Ledger, Brace, Metal Plank, Ladder, Base jack, Up/bottom cup, Blade

 

Specification:

Assembly Name

Length(mm)

Standard

500, 1000, 1300, 1500, 1800,2000, 2300,2500,3000

Ledger

600, 900, 1000, 1200, 1300, 1600, 1800, 2500

Brace

1300x2000, 1800x2000, 2500x2000

Transom

565, 795, 1200, 1300, 1800, 2500


Paint/Galvanized Cuplock Scaffolding system,Construction Scaffolding System,Scaffold System

Paint/Galvanized Cuplock Scaffolding system,Construction Scaffolding System,Scaffold System

Paint/Galvanized Cuplock Scaffolding system,Construction Scaffolding System,Scaffold System


Q:is it possible for me to get an industrial piercing like do i have the right kind of ear shape for it ? or will it look funky and you wont be able to see it ?
sparkling them ear care answer, you're able to desire to purchase it at Claire's and in all probability the place you acquire your ears pierced. Dip a cotton swab in it then practice it around your ear piercing together as twisting the earring. try this two times an afternoon for the 1st couple of month until it heals. Then basically sparkling it often after that. :)
Q:Hello, in a Construction project who is required to check the scaffolding equipment?check the installation? and frequently check the scaffold during the day?is it the Planning supervisor, Contractor, Principle contractor, CDM coordinator or Works manager
Each construction site is supposed to have a Safety Officer. If that is not the case...The superintendent of the company using and supplying the scaffolding need to comply with OSHA standards at the minimum. The primary contractor will be somewhat responsible to ensure things are properly inspected. The Army Corps Of Engineers insist that the scaffolding be inspected each day prior to use. Should an accident happen you need to make sure all sub-contractors have proper general liability and workers comp insurance. Otherwise total responsibility goes to the primary contractor.
Q:i know they are meant to be done as one piercing and with one bar to reduce the risk of them not aligning properly but is it possible to have it done as one piercing and then replacing the bar with two separate ones after it has partially healed. is there still a risk? also, how low down and at what angle should the bar be?thanks x
They can be done as two separate piercings, and it is up to the piercer and the shape of your ear to decide if something like that will be done. However, I would not recommend it, because even if it is partially healed, putting two separate earrings in can still misalign the piercing when you go to put the bar back in later. I would recommend keeping the bar in, it's a guaranteed way to make your piercing work out. Besides, once you get used to the bar, you won't even know you have it in! Much easier than keeping track of two separate earrings and making sure they still align months down the road. As for the angle, it depends on your preference and what is able to be done due to the shape of your ear. Some people want theirs straight across, others want a much steeper angle. It all depends on preference and shape of ear. Hope this helps, good luck!
Q:To take panoramic photos? I am willing to sign a form of indemnity if they wish as it will be at my own risk.
You can rent one of your own. Getting all the contractors, owners and subcontractors to let you sign a waver will not get you far ... in the end if you fall off, your survivors will still sue.
Q:I recently had a scaffold piercing. It seems to be healing well, however it is still sore.My body tends to reject piercings, so is there anything I can do to help it heal?I am currently using saline solution taking vitamins.
your body wont reject it cuz its cartilage and it wont reject. its just sore becuase you just go a while ago so it will hurt of a couple of weeks
Q:I'm 14 and getting my scaffold pierced soon. I am terrible with nerves and pain. I had a panic attack getting my doubles pierced. To calm my nerves, can you tell me what to expect?
I've passed out getting shots before! Almost to the point where I had a seizure. And I got mine done, and I thought I was going to pass out again! But my lady was really nice. It really doesn't feel like anything more than a lobe piercing, but you feel a bit of a pinch the second time it goes through. Nothing more! You'll be fine. Ask if you can hang around for a bit after to make sure you're okay! Good luck. Just take a deep breath in, then let it out as the needle goes through. Good luck!
Q:i want to get a scaffold ear pireceing but i got my cartlige done about 2 to 3 years ago but any way if i got a industrial done who would they do it with my cartlige done would thay use it and just make one hole instead of two
They most likely wouldn't use the cartilage piercing you already have because the hole wouldn't be in the proper placement for the bar to go through. You could always use your other ear though :)
Q:How to allow the height of the bowl - shaped steel tube scaffold
Bowl buckle scaffoldBowl buckle scaffold is a new type of steel scaffolding. The original scaffold with tooth bowl joints, with spelling and rapid, saving, stable and reliable structure, fully equipped, strong versatility, large bearing capacity, safe and reliable, easy processing, easy loss, easy to manage, easy transportation, wide application etc.. Has received several awards at home and abroad, is one of the ten key technologies to promote the Ministry of construction in 2000.
Q:Whats a scaffold piercing?
upper ear...duhhhh
Q:What is the horizontal spacing of the wall of the bowl buckle scaffold
For the double row scaffold with a height of 24m or above, it is necessary to connect the rigid wall with the building. 6.4.5 wall construction shall meet the following requirements: (1) the wall of the wall connecting rod or horizontal reinforcement should be set, when not level settings, and end connections shall be connected by scaffolding, should not be used on cable connection; (2) the wall must be constructed by tensile and pressure. The reinforcement must be matched with the supporting and supporting should be reliable at the top of the concrete ring beam, column structure. Steel wire should be used for more than of the diameter of the steel wire twisted into one, the use should not be less than 2 shares; can also be used not less than 6mm diameter reinforcement. 6.4.6 when the lower part of the scaffolding can not be set up even when the wall can be set up throwing support. Throwing support should be used in long rod is reliably connected with the scaffold, and the ground inclination should be between 45 DEG ~60 DEG; the connection point to the main center node distance should not be greater than 300mm. The support shall be removed before the wall parts are erected. When the height of the 6.4.7 frame is over 40m, and the wind vortex is acting on the wall, the measures of anti roll up wall should be adopted.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords