P830 Road Roller BuyP830 Road Roller at Okorder
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Name:P830 Road Roller
Parameter:
Model | Unit | P830 |
Min. working weight | kg | 14500 |
Max. working weight | kg | 30000 |
Axle load,wheels | kg | 2900 |
Static linear load | kg | 12600 |
Theoretical gradeability | % | 20 |
Min. turning external radius | mm | 9000 |
Min. ground clearance | mm | 290 |
Tyre overlap amount | mm | 50 |
Front wheel swing range | mm | ±45 |
Compaction width | mm | 2750 |
Ground pressure | kPa | 260~450 |
Wheel base | mm | 3840 |
Travel speed | km/h | 0~8 |
km/h | 0~16 | |
Tyre specification | 11.00-20 | |
Tyre tread | Smooth | |
Tyre amount | Front 5 rear 6 | |
Engine model | SC8D180F2B1 | |
Rated speed | r/min | 2000 |
Rated power | kw | 132 |
Engine oil consumption | g/kW•h | 232 |
Water tank capacity | L | 2900 |
Hydraulic oil tank capacity | L | 100 |
Fuel tank capacity | L | 180 |
Advantages:
state-owned company
fortune 500 company
AAcustom
Why choose us?
1 sincre
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the equipment such as tower cranes, produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to solve all your tower crane installation and other questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s tower crane have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
Inquies FAQ
My dearest friend, if you want to buy our tower cranes, please tell us the following parameters. And we will make the most suitable project for!
1. Building height or tower crane working height.
2. Max load capacity and tip load capacity.
3. Span or jib length
4. Other Special requirements
- Q: How does the roller run in a straight line?
- The roller presses 1/3 of the wheel as required. You can make a mark on the front cross bar and then follow the mark! Thanks for taking it. If I don't make it clear, leave a message
- Q: XCMG vibration roller 14J and 14JC what is the difference?
- To say something bad is actually something that was flawed or promoted before, but it didn't work out at that time.Or it will be better after practice to find improvements in some places, so there is a slight difference.
- Q: The front wheel of a road roller is known to be cylindrical, with a width of 2.5 meters and a diameter of 1.2 meters. The front wheel rotates 8 minutes per minute. The 1. roller takes 20 minutes from one end of the road to the other. How many meters is the length of the road?. 2. what is the area of the road roller from one end to the other end of the road?. Process and description
- 4, from one end of the road to the other end, the area of the road is equal to the length of the front wheel and the width of the wheel, or =602.88*2.5=1507.2 (square meter).For reference.
- Q: The roller ensures a good compaction, usually several times
- Count back and forth, usually more than four times.
- Q: How much is the rent for XCMG 303 tire roller?
- You don't need to buy insurance, can skilled from rollover accident escape quickly, have certain skills to escape. Used XCMG 25K crane 39.1T, and successfully lifted, repair workers, foreman, project manager, developers, crane driver, excavator driver, countless.
- Q: Roller brake lock why
- 5, the wear plate gap is too small;6 、 the vacuum booster often fails to the valve.
- Q: The width of the road is four meters. The roller runs for half an hour. It can press a large area of road
- Solution: it is known that a roller runs 25 meters per minute and the width of the roller is =4 meters,Get the roller area per minute of the roller= running length per minute * width of road=25 * 4=100 square metersAnd roller drive for half an hour, half an hour =30 minutes,Roller must be driven for half an hour= pressing area per minute * road time=100 * 30=3000 square metersAnswer: roller run for half an hour, can press 3000 square meters of road.
- Q: Brief introduction of vibratory roller with double steel wheels
- Double steel wheel, high frequency;Extraordinary compaction efficiency;Automatic starting system;Vibration frequency meter patent design;Unique sprinkler system.Run heavy l volume: 11300 kgSteel wheel width: 2000 mmVibration frequency: 42HZ/63.3HZ
- Q: What is the difference between 18t roller and vibratory roller? What's their respective function?
- Your problem is not comprehensive. If it is a vibratory roller, it will be divided into double and single steel wheels. Single steel wheels are used in earthwork and Macadam foundations. Double steel wheels are used on asphalt
- Q: How much is the front toughened 20t vibratory roller in the old section?
- Glass cheap, depends on what you are glass front or side of the professional roller
Send your message to us
P830 Road Roller BuyP830 Road Roller at Okorder
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords