Safety Light Weight Swing Stage Scaffold , ZLP Series Windows Cleaning Platform
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Safety Light Weight Swing Stage Scaffold , ZLP Series Windows Cleaning Platform
1) Quick Detail:
1. Model No.: ZLP800
2. Brand Name: HAOKE
3. Material: Steel / Aluminum
4. Appearance: Plastic Spray Painted / Hot Galvanized
5. Capacity Loading: 800 KG
6. Lifting Height: Maximum 300 Mts
2) Applications:
1.Cleaning and maintaining of the exterior wall of high-rise building.
2.Painting, decoration and refurbishing of exterior walls.
3. Installation projects and other construction working of outer walls of high-rise building.
4. Aerial working of ship, large tower, bridge, dams and large chimneys.
5. Install and maintain for high-rise building elevator hoistway, shipbuilding industry, seagoing vessel, warships weldingmaintain.
3) Specifications:
Model No. | ZLP800 | |
Rated load(kg) | 800 | |
Lifting speed(m/min) | 8~10 | |
Motor power(kw) | 2×1.8 50HZ/60HZ | |
Brake torque(Km) | 16 | |
Steel rope angle adjusting range(°) | 3°- 8° | |
Distance between two steel rope(mm) | ≤100 | |
Rated stretch of front beam(mm) | 1500 | |
Suspending Platform | Locking | Aluminum alloy |
Nr.Of platform rack | Single rack | |
Nr.Of platform | 3 | |
L×W×H(mm) | (2500×3)×690×1300 | |
Weight(kg) | 410 Kg | |
Suspending mechanism(kg) | 2×175 Kg | |
Counterweight(kg) optional | 25×40pcs | |
Diameter of steel rope(mm) | 8.6 | |
Max Lifting height(m) | 300 | |
Motor rotation speed(r/min) | 1420 | |
Voltage(v) 3PHASES | 220V/380V/415V (customized) |
4) Competitive advantages:
1.Absolutely guarantee life safety during Aerial working
Safety lock fasten the steel rope immediately once the suspended platform tilts or the steel rope slips out of the hoist;
Electric control system is designed with leakage protection, over-heat protection, current overload protection and brake stop;
Good-quality steel wire rope, safety rope and cable.
2. Stable performance: raise up and lower down smoothly
3. Modular design. Easy to disassemble, assemble operate and maintain.
4. Lifting height can be adjusted according to requirement (Maximum 300 Meters)
5. Working voltage and frequency can be adjusted (220V/380V/415V etc.)
6. Suspended platform for special usage can be customized (circular, L shape, U shape, etc)
7. Professional quality, competitive price, fast delivery, good services.
5) Parts of suspended scaffold platform:
1. Platform(basket): Steel or Aluminum Alloy (painted or hot galvanized)
2. Suspension Mechanism: Steel (painted or hot galvanized)
3. Electric hoists:LTD6.3 or LTD8
4. Safety Lock: LST30
5. Electric control box: Along with hoists
6. Steel wire rope: 8.3mm ,8.6mm or 9.1mm
7. Safety rope: 18mm,20mm
8. Electric cable: 3*2.5+2*1.5
9. Counterweights: Cement , cement with steel cover & Iron counterweight
10. Spare parts
- Q: When will the manual lifting cradle be used?
- Hanging scaffold rod is set on the roof, walls out of not less than 1500, set in wire rope out of the bar, the rope hanging scaffold or basket, lifting means manual and electric hoist lifting.
- Q: What are the mandatory requirements for the use of gondola cars?
- 1) all operators must read the instruction manual of the basket carefully. If they do not understand the requirements, they can not operate on the hanging basket.
- Q: Basket up and down, what's the matter?
- (5) no drunken hanging basket operation, and not allowed to make jokes or slapstick in the basket. 6) basket carrying materials and machines must be placed flat and placed, not to make the basket tilted phenomenon and overloading. Do not operate on a gondola when the weather is bad or the wind is over 5.
- Q: Is the hanging basket heavy or heavy underneath?
- The basic data of 8.3 length of cable diameter length. Including three pieces of "counterweight safety rope hoist, safety lock box) what brand. Then listen to each other 7 thousand times offer suggestion exam), this does not guarantee the construction of about eleven thousand Lida electric basket mid-range bar steel thin body some three pieces of wire voltage difference on later assembled) fourteen thousand high-grade steel wire rope cable steel work after three pieces of original quality and reliable stability. The other) will be based on your weight on consignment or favorable offer after the circle of good reputation. Excellent quality of Hebei Lida (must be original) today etc.!
- Q: Construction plan for mounting basket on steel pipe support frame
- (3) the front and rear beams are respectively arranged before and after stent insertion within the casing, with the beam to the front and rear beams set, and according to the situation before the selected overhanging beam, the distance between the front and rear supports should be put to the maximum, will be placed on the front seat pillar rod sleeve. The small connecting sleeve is arranged on the inserting rod sleeve of the back support, and is fixed by bolts, and the bracket is assembled and completed.
- Q: Construction basket operation certificate is not able to operate?
- 5, basket installation, demolition must be prepared special program, after approval procedures, strictly implemented according to the program, the implementation process should be designated security alert area, and set up care personnel.
- Q: Who knows the construction basket reported those information?
- 2. basket installation and removal of the construction project; 3. basket construction tests; testing issued by 4. with relevant qualification certificate by a third party testing unit certificates; 5. basket construction inspection records and test certificate and report form and so on;
- Q: How many kinds of basket are there?
- Hanging basket is the construction machinery of aerial work in construction engineering. It acts on the curtain wall installation and the outer wall cleaning. The hanging basket is a new type of height working equipment which can replace the traditional scaffold, reduce labor intensity, improve work efficiency and can be reused.
- Q: Which is better?
- We also specialize in curtain wall glass, used Hebei basket more, but the quality is relatively poor, and later also purchased in Wuxi, the quality is slightly better, this year the company business, is also high on the basket on Chengdu, the boss of my friends to help us said there is a company called Foshan Senmao machinery equipment leasing company a very good quality customer service or service we have been in use, you can have the opportunity to try to have their information online,
- Q: Basket installation unit qualification?
- To more stringent management norms Jiangsu Sheng Zhejiang Province, for example, the height of the operating basket of the normal use of two main categories of qualifications, first, production and production qualifications
Send your message to us
Safety Light Weight Swing Stage Scaffold , ZLP Series Windows Cleaning Platform
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords