Mini excavator china with excavator breaker
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 100 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Mini Excavator China with Excavator Breaker
VTW-08 excavator is small and flexible,easy to operate and transport. It can work in a small space,and can quickly replace the accessories. The utilization rate is greatly improved.
Attention Please:
For your money in safe, we will offer you:
- Unconditionally refunding your money, in 7 days after paying.
- Unconditionally refunding your money, if you are not satisfied with quality after receiving goods.
- Order online is supported and welcomed, your money will be in safety.
For price and service, we will offer you:
- Nice quality.
- Factory price.
- No MOQ, 1 piece is ok.
- 12 + 6 months warranty.
- Welcome to be our agent.
- Quick shipping within 3 days.
- User manual and training videos.
- Lifelong and free technical support.
- Free hotel during visiting our factory.
- One-on-one professional after-sales guide online.
- Free parts are available if parts of the machine are damaged under warranty.
Certification:
Our certification is REAL. NOT FAKE! NOT FAKE! NOT FAKE!
Please contact us to show you if you are interested in it.
Product Description:
Technical Parameters:
Name | Small excavator | Machine weight | 600kg |
Model | VTW-08 | Turning radius | 1100mm |
Digging height | 2350mm | Climbing angles | 30° |
Digging depth | 1200mm | Crawler length | 1140mm |
Bucket capacity | 0.02m³ | Crawler width | 150mm |
Rated power | 8.2kw | Transportation length | 2480mm |
Discharge height | 1600mm | The machine width | 750mm |
Digging radius | 2450mm | The machine height | 1375mm |
Ground clearance | 80mm | Dozer blade clearance | 120mm |
Travel speed | 1.8 km/h | The sinking depth of the bulldozer | 200mm |
Main Products:
-Mini Excavator
-Wheel Excavator
-Backhoe loader
-Snow Blower
-Mini Road Roller
-Plate Compactor
-Laser Concrete Screed
-Crack Sealing Machine
-Road Cutting Machine
-Other Construction Equipments
- Q: I cut down a ratty old tree, and dug the stump up with an excavator, my question is... Since I removed the old root ball, can I plant a new tree in the same hole.?? It a great spot to shade my house! Some have told me put it in a different place, but I really want it in the original spot. Will a new tree make it there??
- As long as you didn't use any type of chemical stump remover, planting a new tree there will be fine.
- Q: How to find the total volume of Earthmovers buckets?
- Spec sheets for excavators like the one on the first link typically talk about the SAE standard at 2/1 heaped. The standard is the Society of Automotive Engineers standard J742. Interestingly this standard, which came out in 1979 was cancelled in 2001 and not replaced. However you can still purchase this document for $98.from the second link. The summary for the standard says Description: This standard applies to buckets of loaders (as defined by SAE J1057a, Identification Terminology of Earthmoving Machines). This method applies primarily to buckets having parallel sides and a cutting edge parallel to the top edge of the back sheet. Moderately clipped back sheet corners will introduce no appreciable errors. Bucket teeth, tooth adapters, as well as other similar local discontinuities are ignored. a. Interpretation of irregular shaped cutting edges is identified in paragraph 4.4. b. Interpretation of irregular shaped side sheets is identified in paragraph 4.5. Purpose - The purpose of this standard is to provide a uniform method for determining the SAE struck capacity and rated capacity. The volume calculations used result in a realistically conservative heaped volume. The calculations are based on the inside physical dimensions of the bucket only without regard to bucket action provided by any particular machine. For rating purposes, a nominal heaped load with a 2:1 angle of repose is to be used with bucket orientation dictated by the strike plane defined in paragraph 3.1. This in no way implies that the loader linkage must carry the bucket oriented in this attitude, or that all materials will naturally have a 2:1 angle of repose. So effectively use geometry depending on the buckets shape. If it has parallel sides its going to be height X width X length for the struck volume with the addition of the prism for the heaped volume. 2/1 means 2 horizontal for 1 vertical. So the prism volume will be length X width X width / 8.
- Q: Modern 335-7 excavator hydraulic oil temperature at how many degrees normal?
- Modern 335-7 excavator hydraulic oil temperature is normal at 50~80 degrees.The excavator hydraulic oil temperature is too high failure prevention 8 coup:1, according to the use of maintenance instructions require the use of hydraulic oil, to ensure the cleanliness of the oil, to avoid plugging the filter2, regularly check the oil level, add enough oil
- Q: the cards are of the zendikar set please help
- No, but if you kick a Rite of Replication on a Halimar Excavator you pretty much win.
- Q: for example: excavator 325 parts
- try OKorder or kijiji. You could even try craigslist
- Q: What is the difference between a backhoe and an excavator?
- Backhoe is usually mounted on a smaller tractor with a loader on the front. an excavator or trackhoe is just the digging bucket, no loader and isnt on a small tractor frame. Usually excavators are much bigger than backhoes, but you can buy little ones
- Q: The working principle of excavator air conditioner
- the refrigeration, air blower to blow out of the evaporator, is cold) - evaporation after fluoride became low - this time the recycle of gaseous fluorine to the compressor pressure.... That's how it keeps circulating
- Q: Im building a new house and i am currently arranging to have the excavator contractor there to install septic and excavate for the foundation. Then im having the foundation contractor come in to do his job. I live in Nova Scotia if that makes any difference. Should any of these guys be asking for money up front or part way through? Or do they finish then bill me with 30 days to pay? Whats the normal procedure?
- I just built a house. I paid the architect after final billing and paid the contractor first a deposit, and from then on had a planned payment schedule of 3 sums with the successful completion of each stage as described in our contract. There was also a final payment for requested extras not included in our quote. Our builder is a very stand up guy.
- Q: I have a jd 490E excavator the boom function has very restricted hydraulic flow/power. I replaced the circuit release valve (two of them), which did not help at all.the problem was intermittent in the beginning, when boom control is used with stick control...quot;
- Is it just the boom or does everything slow?
- Q: What do you mean by excavator?
- Do you have such a hot word? Excavators are engineering vehicles.
Send your message to us
Mini excavator china with excavator breaker
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 100 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords