• Mini Wheel Excavator System 1
  • Mini Wheel Excavator System 2
Mini Wheel Excavator

Mini Wheel Excavator

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


     Mini Wheel Excavator  



    Mini wheel excavator W65-7 is widely used in projects like small earth & stone construction, municipal construction, 
    road maintenance, layout of cables and pipes, garden cultivation, trenches clearance, and etc.




    OPERATION RANGE

    Boom Length

    3,060mm

    Arm Length

    1,750mm

    Maximum Digging Reach

    5,970mm

    Maximum Digging Depth

    3,450mm

    Maximum Digging Height

    5,565mm

    Maximum Dumping Height

    3,860mm

    Minimum Platform Tail Turning Radius

    1,630mm

    Maximum Digging Depth of Bulldozing Plate (Optional)

    100mm

    DIMENSION FOR TRANSPORTATION

    Width of Platform

    1,900mm

    Overall Width

    1,950mm

    Machine Height

    2,750mm

    Distance from the Digging Arm to Center of Machine Rotation

    3,785mm

    Maximum Length of Transportation

    5,415mm

    Minimum Ground Clearance

    260mm

    Bulldozing Plate Height (Optional)

    490mm

    TECHNICAL PERFORMANCE

    Power

    42kW/2,100rpm

    Machine Weight

    5,500Kg

    Bucket

    0.28 m³

    Pressure with main spill valve

    20Mpa

    Constant Flowrate Pump

    2×23L/min

    Variable pump (Optional)

    2×22L/min

    Maximum Digging Force

    45KN

    Maximum Traction Force

    60KN

    Gradeability

    56%(29)

    Pressure to the Ground

    49Kpa

    Travel Speed

    32Km/h

    Swing Speed of Platform

    10.5rpm

    Fuel Tank Capacity

    110L

    Hydraulic Tank Capacity

    125L

Mini Wheel Excavator

Q: It's suspense, and I think it starts with people in a car, and like some kid loses his teeth, and like he somehow is found dead, and someone drops a rock on his face and films it(I think). Later, the FBI finds a body under a sand dune, and picks him up with excavator. idek. it's some weird movie, but I can't remember the name.
Sounds okorder
Q: The fact is that yes environmental protection is needed, but now EPA regulation has become a big cash cow (lobbied for hard in Washington) that increases the cost of a particular project a MINIMUM of 30-50%. Environmentalists lobby for more and more of the economic pie, but the nature of the work they provide is such that they don't give anything back as far as gross domestic product (GDP) is concerned. Often (many circumstances I have seen have been much worse) 1/2 of the infrastructure could be completed nowadays for the same cost that just 10 years ago we could have completed the whole project.
A few extra jobs come along from inspections, and bringing facilities up to code. Many more are lost when facilities close because getting up to code is too expensive.
Q: I have a John Deere 30 mini excavator. It is roughly 1987 vintage. Product ID is CH0030D001044. Im looking for a new/used front window. It is curved glass, 2 piece, top slides down over the bottom. Any help locating the glass would be greatly appreciated. Im also looking for replacement tracks for this machine. It currently has steel tracks, Im looking at upgrading to rubber tracks. Will rubber tracks install on this machine easily? Do I need any extra components to make the switch? What is a reputable company for aftermarket tracks? Thank you very much.
if your in california, try myers ward in fresno. if your in the midwest, use the yellow pages.
Q: First, I'll put the deck list for everyone. Spells: 36Kazandu Blademaster x 4Ondu Cleric x 4Halimar Excavator x 4Jwari Shapeshifter x 4Join the Ranks x 4Path to Exile x 4Tome Scour x 4Hada Freeblade x 4Seagate Loremaster x 1Archive Trap x 2Rite of Replication x 1Lands: 24 12 Plains7 Islands3 Sejire Refuge2 Halimar DepthsThe deck works with decent speed. I got first place in a Type II tournement once with it already. The goal is to have an ally drop every turn (plains, hada freeblade on turn 1). I've used it to out mill the standard Type II mill deck already, and I was hoping for some suggestions from veteran players to maybe make the deck better.
Hedron Crab( mill 3 cards when a land drops on your field) Archive Trap (combo with Path to Exile, mill 13 cards for no cost) Umara Raptor
Q: I have to move about 5 inches of dirt with a length of probably 15 feet and a width of 10 feet. Is there any other way that is easier than a shovel and a wheelbarrow?
Yes, a Bob Cat, or excavator. You could use tnt, but will have problems with the local police department.
Q: Hi, I'm in the Navy right now, but I really want to get into construction in the future when I get out, but I have no experience.I've heard that a good idea to get your foot in the door is to take a class to operate heavy equipment. I've researched a couple companies who do classes like that, like ATS, but most of them last months. I want to take classes like this, but I don't think I'll be able to take leave long enough to take one of these classes. Are there any other ways to get some lessons for equipment like dozers, graders, excavators, etc. in a shorter time period? Thanks.
Probably not. To learn to safely operate a number of different pieces of equipment like this you need lots of hands on experience and that takes some time. If a school offers a shorter program do not trust them. The best way to get into construction is to get into a 4 year apprenticeship program and learn a trade from the bottom up. Supplement your experience with training at a community college. If you are young enough you might consider learning two trades for flexibility and then get into a construction management course or an architecture program. Electical, Carpentry, HVAC, Plumbing are all good programs. Autocad and some construction management or business courses would really round you out well. Construction can be a very rewarding career but there are no shortcuts. You need a combination of schooling and OJT to be successful.
Q: Caterpillar said Friday it was shifting production of small tractors and excavators from its Sagami, Japan plant to the United States.The world's leading construction equipment maker said it will build a new $200 million facility near...Toyota announced on February 8 it will move remaining production of its Highlander crossover sports utility vehicle from Japan to Indiana, creating 400 US jobs.
Both parties are for returning critical manufacturing to the North American Content. Tho I am sure they will both put on a show for us. And do some stupidness name calling. Reason we are entering a cold war era with China. And that,that is critical to war production will be rebuilt here. As China can well block shipping lanes from Asia. It will be slow. Unless things cool down. Or fast if they heat up. And Japan don't want all its eggs in one basket there. But we the commoner can but wait and see. And listen in awe at the words that will be said.
Q: I'm applying for an apprenatship in Plant Maintenance, does anybody know what ill be undertaking and what the tasks will be?
Plant maintenance usually refers to the methods, strategies, and practices used to keep an industrial factory running efficiently. This can include anything from regular checks of equipment to make sure they are functioning properly, to cleaning garbage bins and toilets. The general aim of plant maintenance is to create a productive working environment that is also safe for workers. Since there are many different types of plants and factories, the ways to maintain these facilities often vary. For example, a steel mill will have different machinery than a food processing plant. This means that each place of business generally has its own maintenance plan, tailored to its particularities. A maintenance plan can include scheduling times for equipment checkups, trouble-shooting, and general clean-up. Most plants employ their own maintenance staff. This can include workers such as on-site engineers, whose job is to make sure that machines continue to operate effectively. This is an especially important for plants that use equipment designed for assembly lines, since a stoppage of the line can be financially damaging. For more,
Q: them outside right now at my father-in-law's. I'm pretty sure the perc rate will be between 1-5 minutes for 1 inch of water, but we're going to do the official test in a little bit to check. The soil here is sandy and it's a three bedroom house with 3 people living in it and 4 people who visit almost every weekend.
12-15 ft deep - thats pretty deep
Q: I'm interested in purchasing either one because I think it'd be cheaper than just hiring someone, but I don't know which would be more efficient to get the job done. Can anyone explain how you use them?
the price of either one is staggering.cheaper to hire some one or rent one.an excavator will be better.but with either one you need to know what your doing their not that easy to operate.the back hoe is good for small jobs and tight place,s

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords