• Luffing Tower Crane of TCD160 with 10 Ton Max Load System 1
  • Luffing Tower Crane of TCD160 with 10 Ton Max Load System 2
  • Luffing Tower Crane of TCD160 with 10 Ton Max Load System 3
Luffing Tower Crane of TCD160 with 10 Ton Max Load

Luffing Tower Crane of TCD160 with 10 Ton Max Load

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TCD160 Description

Feature: Tower Crane          

Condition: New

Application: urban construction  

Rated Loading Capacity: 6T

Rated Lifting Moment: 630MT    

Max. Lifting Load: 6T

Max. Lifting Height: 200M        

Span: 50M

Model Number: TCD160

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate

Colour: Orange/ Yellow

After-sales Service Provided: Overseas third-party support available


TCD160 Features

Free height: 50m        

Max.height: 124m

Tower head height: 8m   

jib length: 50m

Tip load: 1.6t            

Max.load: 10t

power supply: 380V/50Hz or according to clients need

 

TCD160 Specification

Luffing Tower Crane of TCD160 with 10 Ton Max Load


TCD160 Pictures


Luffing Tower Crane of TCD160 with 10 Ton Max Load

Luffing Tower Crane of TCD160 with 10 Ton Max Load

Luffing Tower Crane of TCD160 with 10 Ton Max Load

TCD160 FAQ

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/ undercarriage/ undercarriage with traveling system), mast section type (panel/ integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM and GIT could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type


Q: What is the pay rate for heavy machinery
That really depends where you work. Big mines you can be making over $60 per hour. I'd say $18-$25 per hour is more average.
Q: This machine presses a sheet of Formica countertop over a piece of wood (mold). Its commercial machinery. Any help would be greatly appreciated.
If it's in a cabinet shop, It's probably a vacuum press.
Q: Can a private project manage the construction machinery?
According to the Chinese Engineering Machinery Industry Association statistics, as of the end of 2014, the main products Chinese engineering machinery holdings of about 7 million units, which can travel, national mandatory requirements on the pavement concrete mixing truck, concrete pump truck, the wheel crane car about 900 thousand Taiwan, the rest are non road construction machinery, there is no mandatory requirement on the card.
Q: How do the proteins of the transcription machinery access DNA that is tightly associated in chromatin?
Chromatin is tightly condensed to chromosomes only during mitotic/meiotic phases and not all the time. In your body, right now there are several cells which are not dividing and hence the DNA is freely available coiled around histone proteins. Transcription machinery access DNA by unwinding DNA from histones (histone deacetylases) initially. Later DNA gyrase unwinds the coiled DNA (like zip open) where the transcription machinery acts.
Q: Hi everyone, Im looking for a company which sells or produces machinery which can be purcahsed in order to produce Cd and DVD's. It would be best if they are Japanies comapnies but any info would be appriciated...THANX!
I'm certain if you find the commercial (rather than consumer) sections of the major electronics manufacturers, the same ones that make the players, you will find product offerings. It would not be entirely different companies making the commercial end machines.
Q: Just thread pipes?Is that all they do because thats what I keep hearing
I would say no, because almost every job has more then just one purpose then like u said threading pipes
Q: A 20kw,200V shunt generator is operated at rated load. if the driving engine is developing 30bhp (break horse power), determine the iron and friction losses.Answer is IFL=1039W.Thanks a lot.
746 watts = 1 hp 30 brake hp are going into the sysystem so 30*746 watts is going into the generator = 22,350 watts if 20,000 watts is leaving the system as electrical power, that only leaves 350 watts available for losses.
Q: Yeah, that's pretty much the question.....10 points to best.
Hmmm, this is like asking how having a power cable be used to run a TV. A tv can't run without it. It's there are a lot of other things/factors/processes that enable the tv to run, but the power cord is still mandatory. Likewise for atp/adp recycling. It's not really used to run the machinery. It's a mandatory part of the metabolism of a cell. When ATP us used, energy is released from the ATP molecule. The byproducts of the reaction are reused. You can sort of think of them as rechargeable batteries.
Q: used in manufacturing and production
CNC (Computer Numerically Controlled) Machines are programmed and controlled by computer so can offer very short set up times and the flexibility.
Q: Why is it anyone elses business? Studies have proven time and time again that drug testing is useless for determining preformance.
Hey - welcome to the twenty-first century! We are in the age of the new prohibition. You are EVIL if you take drugs - don't you know that? EVIL!!!! FP

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords