• Light Duty of Ring Lock  Scaffolding System System 1
  • Light Duty of Ring Lock  Scaffolding System System 2
  • Light Duty of Ring Lock  Scaffolding System System 3
  • Light Duty of Ring Lock  Scaffolding System System 4
  • Light Duty of Ring Lock  Scaffolding System System 5
Light Duty of Ring Lock  Scaffolding System

Light Duty of Ring Lock Scaffolding System

Ref Price:
$4.30 - 18.30 / kg get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Ring lock Description 

Ringlock Scaffolding system consists of Two Halves Coupler,Jack Base,Base Socket,Vertical,Vertical without Spigot,Sub-vertical,Horizontal,Diagonal,Level Diagonal,etc.It is a universal and Versatile modular junction scaffold which is widely used for house engineering,viaduct engineering,water resources and hydroppwer engineering,and so forth.   

2.Main Features of Ringlock

 It will greatly reduce the cost because of the following advantages

1)Using less pipes

2)Easy to install

3)It can be used again and again for nearly 20years

 

3.Ring lock product pictures:

   Light Duty of Ring Lock  Scaffolding System

 4.Light Duty of Ringlock Product Description

Light Duty of Ring Lock  Scaffolding System 

 5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding:Ø48&Ø60mm

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q: i need as much detail you can give me on these symbols in the book scarlet letter by Nathaniel Hawthorne. if you have any website references besides cliffs notes and spark notes i would greatly appreciate it!!!
The letter A on Hester's chest AND the letter A traced in the sky the night the governor died. The A on Hester's chest was, of course, a sybol of Adultry. But in the end, Hester chooses to wear it after she doesn't need to anymore, and most people take that to mean that the meaning of the symbol has changed, it became more something she overcame, it comes to stand for able. The letter A traced in the sky when the governor dies has two different meanings, the general public took it to mean that the governor was now in heaven as an angel, but Dimmesdale saw it as a symbol of his own adultry. The scaffold, as you said, which I think is a symbol of judgement and sin. Pearl is also a symbol - she is a literal symbol of the love affair, but also a symbol of innocence. For websites, just google scarlet letter - thats what I did and found lots of good information.
Q: The role of the external scaffolding and the relevant provisions?
There are many kinds of scaffolding, there are many types of scaffolding alone. According to the use, structure, decoration scaffolding scaffolding and protective scaffolding; according to the use of materials, there are bamboo scaffolding, scaffolding, metal scaffolding; according to the structure form, there are several independent bar type, frame type, bridge, hanging, hanging, pick style etc..
Q: Want to rent the scaffolding in the county, you need to cast how much money
Look what you want to do. Store rent is not.
Q: The bottom of the cantilever scaffold must be provided with the sweeping rod
Product quality certificate and inspection report. Rust must be replaced, not to be used to build the frame.
Q: What are the requirements for the sampling inspection of scaffolding?
1 the sampling proportion of various structural parts shall not be less than 5% and not less than 20 pieces, and the quality shall comply with the relevant standards and regulations. Not meet the quality requirements of the structural parts shall not be used.2 wall thickness of steel pipe should be in line with the provisions of the special construction program, and shall not be less than 2.8mm, the wall thickness of less than 2.8mm of the steel pipe shall not be used;3 is strictly prohibited the use of cracks, deformation of the fastener, the bolt appears to be replaced silk;4 foot hand frame accessories must be used before the anti-corrosion treatment.
Q: Can you identify Scaffold Grade Aluminum tubing by looking at it.?
The grade or type of Aluminum Alloy materials can not be identified visually because they are almost all the same in appearance. Normally these materials are marked with there Alloy number or designation like, 6061- T6, at certain intervals so that users can distinguish them.
Q: i was thinking of having it done. google it if you don't know what it looks like. but i can't handle pain too well, and as i've seen on youtube, its not nice lmfao, i know pain varies from person to person, but any ideas on how to like take your mind off it? im quite young and this is my first major piercing, i only have my lobes done twice;), and does anyone know a good place to find nice barbells once it's healed:)? thanks:)!aaand do you think this is a nice piece to put in once its healed?
Actually getting it pierced isn't all that painful, it's the couple of weeks after that might hurt...but as long as it's looking after properly (cleaned every day) all should be good. Sleeping on it can be painful, so i would suggest you get the side pierced that you don't usually sleep on. As for taking your mind off it, maybe take someone in with you while you get it done? then you can either talk to them to distract you or just squeeze their hand...also try not to look at the needle as this could just scare you, don't worry too much though, it'll all be over and done with in a few seconds and the pain really isn't that bad. As well as making sure you clean it every day, it's also important to make sure you're not playing with/touching it all the time as this could lead to an infection, always make sure your hands are clean before touching it. That industrial bar looks really nice, i would aim on waiting a couple of months before putting it in though maybe even about 4-5 months. Overall i think you should defiantly get it pierced the look really nice, good luck!! :)
Q: I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
i wouldn't. it may look rly cool now, but wait til u get older. would a job interview go well with that piercing? or a big hole? just think about that.
Q: Was thinking of getting one. How much do they cost?
Only a professional piercer can decide if your ear can handle and industrial piercing. Consultations are free and I highly recommend booking one before you get the piercing. Mine was $70, but my regular piercer does them for $50. It just depends on what shop you go to.
Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
i heard from people after a year an industrial still hurts and they usually have to take them out

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords