JL6518 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
Description of TOWER CRANE JL6518
1) JL6518 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
SPECIFICATION of TOWER CRANE JL6518
Max. working range 65m, tip lifting weight 1.8T and Max. lifting weight 10T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 56
Max height with attachment (m) 205
Working range can be adjusted(m)60/56/50/44/38
Min working range(m)2.5
Max lifting capacity(t) 10
Tip load @ 60m(t)1.8
Packaging & Delivery of TC6518
40HQ container
25~30days after deposit
- Q: Tower crane railing height is greater than or equal to meters
- The height of the railing is determined by the operation specification at height. The upper rod height is 1.0~1.2m, and the lower rod height is 0.5~0.6m.
- Q: in the Open Boat by Stephen Crane, in part IV why are the characters not identified?
- The characters are defined by their roles on the boat. Their previous experiences or personalities don't matter here. It is just the narrow repetitive experience of rowing and how they each contribute to it. Each character is Everyman, being thrown around by the merciless, indifferent hand of Fate. I think that Crane was squarely in the company of Naturalists (they think there's no such thing as individual agency, like Darwinism in fiction). The interesting thing to think about here is that one character has a name - Billie, the oiler. Why is this? He's the strongest, he's the most experienced and he's the one that dies. He's an individual to the reader but Fate doesn't care. I'm sure you can flesh the ideas out now.
- Q: What does tower crane jacking up mean?
- Jack beam and the lifting sleeve frame is connected with the movable claw beam under the fulcrum can fall in the tower body section on the top step.
- Q: i need to write a 2 pg paper on this, and i cant even begin
- Stpehen Crane used interesting literary techniques such as colorful metaphors which can easily be identified in eg like knowing eyes which represent the people of Dunnet (ammons, 84). Another literary technique he uses often is irony which is seen in chapter with Mrs. Todds variety of personality which shows how Mrs. Todd has this varied personality(eden, 141). Other literary techniques shown are comparisons and contradictions, dramatic personification and powerful paradox.
- Q: Do some schools of hung gar only teach (or focus on) the tiger crane form?
- One of the Hung Gar Grandmaster Wong Fei Hung's disciples, Lam Sai Weng started a school with a focus on Tiger-Crane Paired Form, and he named the school, Tiger-Crane, Fu-He M'en. The Tiger-Crane Paired Form is a popular taolu within the Hung Gar system, however, the taolu of Wong Fei Hung incorporated techniques from the Lama School (a popular CMA system during the later Ching Dynasty period), and the Buddha-school, to extend the movements to 108. Thus, there are variations in this taolu, as well as the syllabuses amongst the Hung Gar fraternity. The Tiger-Crane taolu is just one form within the Hung Gar school, and the syllabus includes other forms and weaponry. Another taolu, the Taming the Tiger Fist is said to be the source of the Tiger-Crane Paired Form.
- Q: I have got a ton of Mosquito Hawks in my house. Should I just let them be or will the problem get worse? Plus I read they dont bite humans but will the bite rabbits? I have 2 house rabbits that I am concerned about.
- So called mosquito eaters, mosquito hawks, or skeeter eaters. Unlike mosquitoes, crane flies are weak and poor fliers, so they can be caught easily and without much effort. Despite their common names, crane flies do not prey on mosquitoes, nor do they bite humans. Adult crane flies feed on nectar and consume roots such as turf grass as in backyard lawns.(So they won't be preying on your rabbits) Their life cycle is very brief, so you shouldn't have to worry about them multiplying. They are also weak and poor fliers, so they can be caught easily.
- Q: i have a 100 ton american crawler crane. how do i calculate the psf, for this equipment.
- Not sure what you are asking exactly... Are you saying that you have a crane with a capacity of 100 tons and you want to know the pressure on the soil where the crane is positioned? In this case, you take the capacity (in pounds) plus the weight of the crane (in pounds) then divide their sum by the area of the tracks on the crane (in square feet). This will result in pounds per square foot or psf as you wrote above. These are example estimates, they may not be anywhere near the correct answer, this is simply how to do the calculation. Assumed Capacity 100 ton = 200,000 lbs. Assumed Weight 105 ton = 210,000 lbs. Assumed Area of Track = 200 square feet Note: 1 U.S. ton = 2,000 pounds = 2,000 lbs. 410,000 lbs / 200 square feet = 2,050 psf There's a start, now you just need to find out how much it actually weighs and how long and wide the tracks are to get the area of the track on the ground. I hope that answers the question you were asking.
- Q: I've come up with a few reasons, if someone could add on to it then that would be wonderful!Thank you for answering my question :D
- A crane allows us to place light or heavy loads with precession and safety; on top of buildings, across water ways, down mine shafts and over obstacles. Building a pyramid today would be done with cranes, instead of building ramps to slide the massive stone blocks up. Cranes speed up any construction project. Cranes eliminate a lot of manual labor. Cranes prevent injuries by doing the hard work. One example, we used a crane to lift off an entire house roof, in one piece. We then built a second story and then used the crane again to put the roof back on. Without a crane, it would have taken several days to tear off the shingles, remove the roof sheeting and the trusses, not to mention the money saved. The building codes do not allow the reuse of wood trusses, yet not taking the roof apart, allowed use to reuse the trusses, a savings of hundreds of dollars. Wingman
- Q: Why are electromagnets on junkyard cranes generally circular in shape?
- the guy above me has it pretty much right. It's very easy to make a cylindrical electromagnet, the calculations for it are easy as well, compared to other shapes of coil; they also generally produce a very simple, elegant magnetic field. More complicated shapes would change the shape of the field and give weird results when you try to get things to stick to it.
- Q: I want to make a sculpture out of 1,000 paper cranes. I have sometime to work on it, but not months. Has anyone ever known someone to do this, or done this themselves? How much time should I allow for such a project?
- Do one and time it, then multiply by 1000. Subtract some time because you will get faster from experience.
Send your message to us
JL6518 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords