JL6013 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
Description of TOWER CRANE JL6013
1) JL6013 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
SPECIFICATION of TOWER CRANE JL6013
Max. working range 60m, tip lifting weight 1.3T and Max. lifting weight 6T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted(m)60/56/50/44/38
Min working range(m)2.5
Max lifting capacity(t) 6
Tip load @ 60m(t)1.3
Packaging & Delivery of TC6013
40HQ container
25~30days after deposit
- Q: ...the crate weighs 4000N when resting on the ground. Find the followinga)The tension in the cable necessary to do thisb)The work done by the cablec)The work done by gravityd)The total work done by the systeme)The final velocity of the crate
- One-fifth of a g is 1.96 m/s?. The mass of the crate is... m = F / a = 4,000 N / 9.8 m/s? = 408 kg The force of the crane must be greater than that of the force of gravity. The acceleration must therefore greater as well. 9.8 m/s? + 1.96 m/s? = 11.8 m/s? a) T = ma = 408 kg x 11.8 m/s? = 4.81 x 10^3 N b) W = Fd = (4.81 x 10^3 N) x 25.0 m = 1.20 x 10^5 J c) W = Fd = 4,000 N x 25.0 m = 1.00 x 10^5 J d) W (total) = W (crane) + W (gravity) = (1.20 x 10^5 J) + (1.00 x 10^5 J) = 2.20 x 10^5 J e) v (final) = (v? + 2a?x)^(1/2) = ((0 m/s)? + (2 x 1.96 m/s? x 25.0 m))^(1/2) = 9.90 m/s I'm sure that all of my answers are correct. If anything is incorrect, please e-mail me again. Best of luck to you Jim.
- Q: In the Legend of Sleepy Hollow Ichabod Crane has come from?
- In 1799, young constable Ichabod Crane is sent from New York City, New York to the fledgling settlement of Sleepy Hollow to investigate a series of ghoulish murders.
- Q: How does a person go about becoming a Gantry Crane Operator? And what is it like?
- First you need an opportunity to operate a Gantry Crane, then you will to to get a crane operator license. Finally, you need to find a company who needs a Gantry Crane operator, but if you have located the first step, then you have found someone.
- Q: What is the torque limiter of the tower crane A: the lift is stopped when the lifting torque is exceeded. B: over gravity
- The torque limiter acts as follows: (a)In lifting process, when the weight of the lifting object moves ahead of the trolley when the lever force exceeds the moment limiter, the hook rises, the motor and the trolley forward motor are stopped at the same time, and the utility model has the safety function.
- Q: i have a report on it and its due on the 20th
- They're loud. I've stopped traffic many times to let them walk across the road. They mate for life. I saw a Chinamen try to catch one so he could eat it once. True story.
- Q: Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
- In fact, in the long run, in a word, what the construction site is finally all party a pay, just clearing the count.
- Q: My friend from the internet has an injured crane in her backyard, does anyone know how to keep it calm so she can bring it to the humane society? She says she's called very animal rescue place she knows and none can help so now she's just sitting with it because kids keep throwing sticks at it.
- If you have a pillow case then put it over it's head. then wrap say a towel round it's body to prevent any damage to it's wings and you. Then get it off to a rescue centre or vet/ Wildlife Warden
- Q: A crane lifts a 2355 N bucket containing 1.81 m3 of soil (density=2084 kg/m3) to a height of 7.56 m. Calculate the work the crane performs.
- W=Fdcos(angle) W=mgh=2355(7.56)=17803.8 J
- Q: I just wonder they use cranes at such heights, how do they carry the cranes at such height? Helicopter or something? This is a picture of what I'm talking
- The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.
- Q: Like I know he's the head gamemaker, but i mean seriously, madge is MUCH more important than him. i know he let k/p live, but still......madge did more than him?
- Seneca Crane was the game maker of the 74th hunger games and let two tributes win aka Katniss and Peeta. Seneca Crane was the executed because of that because the capitol felt like having two tributes win was a defeat for the capitol because it showed that the capitol lost control and therefore can't completely control everything..which was what all districts were used to at the time, or at least until Katniss and Peeta 'rebelled'. From a film aspect, Seneca Crane is important because they might use him to advance the plot and Crane might also be a huge transition piece from the first movie to the next (since he was kind of the reason for fueling the flames of the rebellion). I LOVED Madge too, and I am not entirely sure why they left her out, though she seemed important in the book she really wasn't. She only gave the symbol of the rebellion and helped Katinss here and there, but she wasn't really a plot advancing character...I mean anyone could have helped Katniss and given her the mockingjay...most likely Cina will be giving her the pin in the movie because he is Katniss' stylist. TEAM PEETA RULES!!!!!!!
Send your message to us
JL6013 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords