JBY Series JBY160 Hydraulic Walking Pile Frame Sell on Okorder
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
JBY Series Hydraulic Walking Pile Frame
JBY series hydraulic walking pile frame is our heavy equipment which is integrated by mechanical ,electrical and hydraulic system .It is specially made for SMW(Soil Mixing Wall) construction, double rotary bushing DTH drill, static drill grounding method etc .This pile frame not only can be hung with various model of SMW construction multi-axis drilling power head, 800 ~ 1200 double rotary casing drill power head, various specifications static grounding construction power head, but also can be used in suspension of hydraulic hammer, vibratory hammer, diesel hammer, long screw, half screw machines, and other kinds of pile foundation construction tools ,to adapt to the job under different working condition, the applicable scope is wide.
Product main features:
1、Reasonable structure, advanced technology, stable performance, high configuration, multi-function, operation is stable and reliable, good appearance, easy disassemble, flexible use, good price.
2、Using the company "asymmetric walking chassis" patent technology (patent number: ZL201120546000.3), small ground pressure, improve the operation stability, strong ability to adapt.
3、The main platform adopt the whole box structure, column and diagonal bar, the shaft bracket structure and connection fasteners adopt high strength material, improve the fatigue strength.
4、The main pump, control valve, pressure meter, quick change of tubing connectors which adopts U.S Danfoss brand(imported original).Hydraulic winch, the electrical components adopts Italy, Germany brand,which have joint venture in domestic.
5、Column is provided with two fine adjustment mechanism,convenient, fast and accurate on pile location and column vertical degree .Column and brace section can be interchanged, can according to the requirements of the construction to adjust the total height of the post.
6、The hydraulic power source is motor drive, low noise, no pollution.Adopt guiding type electro-hydraulic control, the main and vice hydraulic winch all uses hydraulic proportional control ,which realize step-less speed regulation, work steady, operation flexible.
7、Driving room reserved intelligent monitoring system installation location (optional), on the premise of provide standard column with angle gauge, available with inductance load angle monitor (optional), instant feedback column tilt and the size of the drawing load, sound an alarm in dangerous situation.
8、The whole machine adopts building-block type and easy assembly, shaft bracket used telescopic folding structure, platform overhanging beam powered by hydraulic cylinder and use pin shaft rotary structure, removes the trouble of disassembling.Handling down the tubing connection with quick change connectors,easy disassemble, pillar can put up frame work by itself , the overall structure is simple,disassemble ,transportation, use, convenient maintenance, high construction efficiency.
Parameters:
Item | Unit | JBY160 Model | |||
System control method | Electric hydraulic control | ||||
Pillar support method | Three-point support | ||||
Total length of pillar | m | 39 | |||
Diameter of pillar column | mm | 920×12 | |||
Center distance of pillar guide rail | mm | 600×Φ102×10 330×Φ70×8 | |||
The inclination range of pillar | º | 12 ahead/5 back | |||
Max. working ground gradient | º | 3º | |||
The main hydraulic winch | Max.single rope tension | kN | 120 | ||
The second hydraulic winch | Max.single rope tension | kN | 90 | ||
The third hydraulic winch | Max.single rope tension | kN | 30 | ||
Swing angle of platform | º | 0~360 | |||
Swing speed of platform | º/once | 11 | |||
Walking mechanism | Long boat walking speed | m/min | 0~4.3 | ||
Long boat walking pace | mm | 4000 | |||
Short boat walking speed | m/min | 0~4.3 | |||
Short boat walking pace | mm | 600 | |||
Long boat grounding intensity of pressure | MPa | 0.058 | |||
Short boat grounding intensity of pressure | MPa | 0.066 | |||
Hydraulic system | Motor power | kW | 45+30 | ||
Pressure of hydraulic system | MPa | 16.0 | |||
Max. appearance dimension | Working dimension(L×W×H) | mm | 15000×11000×42000 | ||
Transportation dimension(L×W×H) | mm | 11500×3400×3060 | |||
Long boat dimension(L×W) | mm | 11000×1100 11000×1500 | |||
Short boat dimension(L×W) | mm | 6900×1800 | |||
Weight | t | ~165.0 | |||
Driller performance parameters (optional) | Driller model( optional) | ZKD85-3;ZKD100-3; ZKD70-5;SHX1000 | |||
Drilling hole diameter | mm | 650~1000 | |||
Power head power | kW | 90×3、110×2 | |||
Max. drilling depth | m | 30、20 | |||
Max.pulling force | kN | 1440 | |||
Single shaft output speed | r/min | 16 | |||
Output torque | kN.m | 160、130 | |||
Drilling speed | m/min | 0.5~1.0 |
FAQ
To provide customers with professional and technical services, to meet the demands of customers for construction efficiency and cost control, to achieve value for customers, which is the constant pursuit of Toppile, Toppile implant this concept in the whole process of sales and services.
Before sales
Research market with customers; provide technical advice, customized design and production.
On sales
Always communicate and adjust of design with customer to ensure the product satisfy all requirements.
After sales
Provide installation, adjustment, maintenance service, create customers files, following up machine working situation, provide customer a whole set of “Butler” and “Gapless”services.
Value added services
Redesign and upgrade the hydraulic system of piling machine, upgrade structure components.
Provide high quality and lower price components.
Toppile is the agent of many components factories, including cylinders, pumps, seals, hydraulic elements.
.
After sales services
1.New machine provides technical train.
2.Once anything goes wrong with the machine by normal using,our technical person must appear at the first time no matter where you are.
3.When the machine should be maintained,you will receive the reminding from us.
4.According to different geological conditions,we will recommend different construction plans for you.
5.Remind you which are wearing parts,so you can prepare enough.
6.24 hours respond to your quality problem.
7. Other customer's reasonable request
- Q: I have an assignement where I have to explain how ribosomes in plant cells are equivalent to a machinery in a city.I understand the concept and the general idea, but I don't know how to word it out and explain it clearly.Any ideas?Thanks!
- ribos keep the body moving and working, just like machinery in a city. it takes the garbage truck picking up the trash, delivery trucks bringing in fresh produce, police cars keeping the peace, construction machinery building new structures and so on so the city continues to function as a whole. when one piece of machinery breaks down it causes a chain reaction that affects thru out the city. same goes for your mind and body. good luck
- Q: title says it alllWill it ever be possible for scientists to physically stop a earthquake with any machinery or something like that
- no unless its 1 smart azz sun uv a btch
- Q: I wanna an experienced Wall roll forming machinery online shop?
- www.okorder ,this company has 13 years experience of roll forming used in construction industry.
- Q: ...machinery?
- The company may try to fire you (but all the more grounds for a lawsuit) I was hurt working one time and well I wanted to but money was tight and they just bought me off anyways... so they could try and fire you for trying to sue them, as far as being legal to do so, I don't think so.. Especially if your company is careless and hazardous, than you got an even bigger chance to win (I would think on legal grounds).. so if you want to pursue it hook up with a lawyer, build your case and than go slap em in the face with the supena to court.. You want it to be solid so it will go in your favor.. just remember that.. hope this helps..
- Q: electrical machineries
- For large or largish generators steam turbines gas turbines wind turbines water turbines diesel engines
- Q: pls answer. im very confunded
- it depends on your definition of machinery. I define machinery as something with moving parts and a propulsion system. so a hang glider or a bunch of balloons doesn't fit the criteria and both will definitely get you up in the air.
- Q: we were cutting trees in the woods behind my house today and we found this old piece of tobacco farming machinery but have no clue what it does or what it is for.
- Hi, okorder This company plays a very important role in China and alomost all Chinese buy machinery there. I hope I can help you.
- Q: My contractor table saw has 2hp motor first starts up caused my lights in my basement to dim and as it running seems like it has some shaking in it, I can feel in the saw table, also the basement light seems to flickering or diming out the whole time when saw is in used. Any idea what is the cause guys. I could use some advice here. By the way this motor is running on 110 volts 60 hertz.
- The lights dim because the saw is pulling too many amps for the circuit it is on. To fix that problem, install a dedicated circuit (20 amp, 12 gage wire) for the saw. The vibration is most often because the base and table of the saw are not heavy enough or the motor is not attached tightly or is mis aligned. This is why good quality contractor saws always have big cast iron tables. This is pretty much the old saying of you get what you pay for. You may be able to reduce vibration if you can figure out a way to attach concrete blocks to the bottom of the table. ( By hanging them from rope wire etc.) Anything to add substantial weight. And check the alignment of the motor and the saw arbor and the motor to the arbor.
- Q: Its for a Geography Flyer on Arable farmingAll info will be gladly received Thank-you
- Machinery to plant, fertilize and harvest crops.
- Q: I ve been going to school for HVAC for about a month now. And I was just wondering if anyone had any tips on reading schematics or wiring the machinery up. ( besides make sure the power is off) Each day I get it a little more but I was just wondering if any experts had some tips. Also how is the pay when you get out of school? Please don't tell me to go to salarey I just wanted to know for someone with 1st hand experience. I live in Ma. Thanks in advance
- try taking a certification course at your local college.
Send your message to us
JBY Series JBY160 Hydraulic Walking Pile Frame Sell on Okorder
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords