Inorganic Waterproof Material,Plugging Agent
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 kg
- Supply Capability:
- 50000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Inorganic Waterproof Material Description:
Inorganic waterproof material is to absorb advanced technology at home and abroad development of efficient, moisture, permeability and plugging materials. And it is also very good bonding material. The material of quick-setting type respectively (mainly used for permeability plugging leakage) gentle condensing type (mainly used for moisture, anti-seepage) two kinds, both for single component grey powder.Mainly is suitable for the underground buildings, walls, channel, basin, toilet, waterproof, plugging, etc.
2.Main Features of Inorganic Waterproof Material :
•Avirulent insipidity, non-combustible, can be used for water diversion project
•Moisture, permeability, rapid plugging
•Strong stick relay, anti the compressive
•Not aging, good resistance to water
3. Inorganic Waterproof Material Especification:
Number | Test Item | Index | ||
1 | Solid Content | ≥80% | ||
2 | Tensile Strength Mpa ≥ | 1.9 | ||
3 | Elongation at break | ≥550% | ||
4 | impervious 0.3Mpa,30min | No crack |
4.Inorganic Waterproof Material Images:
- Q: Bathroom first leveling or do waterproof, what is the difference
- 2. Grass-roots waterproof, materials, local conditions, with particular attention to the wall and root and other vulnerable parts of the leakage, should do some special waterproof, plugging treatment. Stir the waterproof material, the first layer of the coating should be waterproof material scraper evenly coated on the base surface, the thickness of 0.6mm or more, to be uniform, the first wall after the operation, from the inside out of the operation , Can not have local deposition, leaving no bubbles, strong bonding. Ground waterproof layer should be painted out of the bathroom door outside the 300 wide, should be higher than the ground 200, shower wall waterproof layer should be higher than the ground 1800mm. The next brushing direction is perpendicular to the last time. The last time the film semi-curing, throwing coarse sand particles, easy to combine with the cement mortar in the future. To be dry after a few days to do closed water test, observe no leakage side good.
- Q: How to do waterproof bathroom, construction process is what
- First, the bathroom waterproof method: 1, brush the first time waterproof coating. Before the construction to ensure that the ground dry, waterproof coating to be painted, no omission, and the combination of solid grass, no cracks, no bubbles, no shedding phenomenon. Brushing the same height, the thickness of the product requirements to meet the requirements.
- Q: What decoration materials, light and water, and the wall, the perfect combination of glass
- Four, pressure glue Hold the 45 ° angle along the gap to press out the glass compound to ensure that the glass compound is in close contact with the substrate surface. Glue gun moving speed according to the size of the gap, the depth of the line evenly move the glue gun, cloth evenly full, do not pile material and broken. When the seam width is greater than 15 mm, need to repeatedly glue.
- Q: Waterproof mortar expensive or dry mortar expensive
- Waterproof mortar more expensive. Because waterproof mortar compared to dry mortar, to add another waterproofing agent, emulsifier and other substances. Waterproof mortar regardless of the cost or transport are more cost-effective.
- Q: Roof membrane waterproof construction process, what should be noted that?
- Three do 1 to do concrete or mortar ratio is accurate 2 to do the surface of the second calendering 3 to be fully maintained
- Q: Home improvement waterproofing problem
- 5, the kitchen is designed to be waterproof. In principle, there should be water and water treatment should be done to avoid the water pipe out of the problem, affecting the destruction of downstairs decorating
- Q: Oriental rain rain waterproof how to
- Strict selection and the pursuit of excellence in product performance of the East Rainbow waterproof coating long-term waterproof material in the market leading the main reason. In order to test product performance, the East Rainbow company to the product to the plateau, desert, alpine, high temperature and other areas for testing.
- Q: Developers have done waterproof, decoration house also have to do it
- so, in your house When the decoration, or should do a waterproof treatment.
- Q: Villa roof leakage what general reasons, what materials to remedy
- ??Note: Before the waterproofing and draining construction, the roof must be dry, because the roof of the water does not evaporate, the new waterproof layer will rise, the waterproof effect immediately invalid. Therefore, rainy days should not be construction, to wait until the sun will dry the water before construction.
- Q: How does the waterproofing membrane work?
- 5, lap seam treatment: the roll is rolled, the adjacent two webs of the joints with a short stove welding welding sticky, heated to spill hot melt adhesive for the degree, and then use the flame and iron wipe The sub-joints will be evenly heated to wipe the edge; 6, the coil side of the sealing side of the construction.
Send your message to us
Inorganic Waterproof Material,Plugging Agent
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 kg
- Supply Capability:
- 50000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords