• Inminated Glass A float hollow glass.5mm+9A+5mm low-e System 1
  • Inminated Glass A float hollow glass.5mm+9A+5mm low-e System 2
  • Inminated Glass A float hollow glass.5mm+9A+5mm low-e System 3
  • Inminated Glass A float hollow glass.5mm+9A+5mm low-e System 4
  • Inminated Glass A float hollow glass.5mm+9A+5mm low-e System 5
Inminated Glass A float hollow glass.5mm+9A+5mm low-e

Inminated Glass A float hollow glass.5mm+9A+5mm low-e

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
200000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

we introduced the advanced production lines (with automatic coating removing, automatic sealing system) and equipped with reverse osmosis deionized water preparation and storage equipment, automatic aluminum spacer bending equipment, low-e glass coating removing equipment, which is able to produce all kinds of specifications of insulating glass for customers. The production lines that are equipped with automatic vertical sealing system, abandon the disadvantages of traditional horizontal sealing (there will be no patch phenomenon), make the processed insulating glass more flat and smooth..

Insulating glass size specifications:

Maximum processing size: 2440 mm * 3500mm

Minimum processing size: 200 mm * 200 mm

Aluminum spacer specifics: 6 mm, 9 mm, 12 mm, 16 mm

Glass thickness: 3 mm to 19 mm


Insulating Glazing

A.  All glass can be processed before assembly




B.  Glass transfer onto the glass loading machine



C. Edge coating removing of coated glass


D.  Wash and clean strictly


E.  Automatic bending for air spacer


F.  Automatic molecular sieve filling

G. Automatic butyl rubber applying



H. Automatic framing


K. Automatic scanning positioning

L.  Automatic double sealing

M. Transfer by sucking disc


N. Conner finishing

O.  Glass on the shelves till solidification



P. Customized wooden cases according to the size of glass

Q. Transfer the glass into the specific wooden cases

R. Leading Time:10 days for an average area of 1000 square

    meters tempered glass

S. Trade terms: FOB and CIF.

T. Payment Terms: By TT, 30% deposit to start producing,

   full amount balance paid before delivery.

U. The container loading after the package checking



Q: Is the glass shading coefficient the shading coefficient?
2680 is a variety of architectural glass optical parameters of the detection method, said "shielding coefficient" refers to the "glass shade coefficient."
Q: The state is the number of buildings above the tempered glass
Floor area greater than 1.5m2 window glass or glass bottom edge of the final decoration surface less than 500mm of the floor window;
Q: Worried about the bathroom glass will blew, paste the security film can be resolved?
Paste the security film can solve this problem, the bathroom is generally equipped with more tempered glass, tempered glass itself has three thousandth of the blasting rate, can be used to solve the Long film safety film. Paste the safety film can increase the function of the glass, and the glass will not be so easy to break. Can be solved.
Q: I'm drawing a building and a part of it cylindrical and all covered with colored glass sheets, and i don't know how to show all that together: that it's glass, colored and cylindrical, so if anyone has any idea I'd be thankful :)
Shade that section as if it WERE a cylindar. Even glass panes look different in the shade than those sections that are in full sunlight. If your elevation is rendered in color, you can add gradiated touches of light blue to darker blue to indicate the curvature of the section. If it's black and white, then use greys. It it is strictly a line drawing then darker and more numerous streaks of black lines can create the shaded effect.
Q: Now many people say that architectural glass film can be energy-saving, it is how to save energy in the end? Its energy-saving principles and energy-saving parameters how to quantify?
I say, mainly rely on reflection to heat, natural air conditioning will not open so much, this is not energy, as the coefficient, businesses have test equipment
Q: Has anyone built a greenhouse using discarded sliding glass doors?
Haven't yet, but plan to. A friend did it and it looks and works great. He even used two sets on the roof - replaced the glass with plexiglass - so can open when it gets too hot. He used aluminum framing - like for a carport and spaced the frame so the doors would fit (used a double carport frame that he extended 6 feet) and used clear plastic siding to fill in the spaces above doors and on the ends. It looks really nice.
Q: Architectural glass companies need to apply for which qualification documents
The material of the glass consists of three parts: basic raw materials, flux and colorant, as well as decolorizing agent, clarifying agent and emulsifier.
Q: I bought a tempered glass film online, but I will not paste, I will not paste around, how do?
Follow the instructions carefully posted, no rare
Q: What are the benefits of using Long film building film?
Safe explosion-proof glass processing film affixed to the inner surface of the building and automotive glass, the broken glass fixed in place to reduce personal injury, reduce the impact of the explosion, blocking intruders, the protection of property. The professionally installed film forms a "invisible tough barrier" on the glass.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches