Hydraulic Concrete Placing Boom PB24A hot sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Description
1.column: 2*8M column
2.YUDING F23-BB remote control
3.Floor frame climbing system
4.No balance arm
5.Max radius of placimg boom:24m
6.Boom: 3 sections
1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.
2.Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors, assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.
3.Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.
Mission & Vision: The following Core Values fulfillment is our objective.
1.Integrity and Professionalism.
2.Target and Action Oriented.
3.Service Quality & Customer Oriented.
4.Pro- Active to change.
- Q:How to install and use the distributor?
- In order to prevent the cable leakage wounding, should be used in three-phase five wire system, the "three distribution", "two levels of protection", to implement a machine a gate of an insurance, lighting line equipment switch installation, the nearest place, in case of emergency hand brake pull
- Q:What are the monthly inspection items of the movable concrete spreader?
- Connecting bolts for solid tower, middle section and revolving table
- Q:How to distinguish tower type distributor and general distributor?
- Avoid large arm distortion caused by huge pressure and vibration of concrete pump during construction
- Q:What is a fixed concrete distributor?
- Concrete distributing machine: special concrete pouring equipment for construction, design and production of railway beam yard and nuclear power plant
- Q:How to fit the cloth rod of the distributor?
- Build a frame with a cloth pole for bearing and inspect and check the bearing capacity of the stressed part, the reinforcement condition of the double fasteners and the stability of the foundation
- Q:What is the working principle of the distributor?
- In order to ensure the safety of the work procedure, prevent the cloth machine from tipping over and pay attention to the stability of the frame of the distributing machine, the construction can be carried out
- Q:What is the structure of a concrete distributor?
- Structure: bolt, and the vertical frame, which is fixed on the base part, through the slewing bearing and the top rotating part is connected on the main beam, and the balance arm, the balance arm rod, such that after the formation of the upper transverse rotating part
- Q:What's the design plan of the concrete spreader?
- Hinge structure on the tape machine design by two light truss, is hinged on the frame of the rotary hopper, through a hinged cylinder between two truss angle adjustment according to needs; in the lower part of the tape machine, design a universal wheel, can move along the axial cylinder in truss drive, adjustable belt tail height
- Q:what's the difference between the fabric pump and boom pump?
- The spreader is mounted according to the height of the building, and the boom pump can only be used for a lower building
- Q:What is the concrete distributor?
- Hydraulic cloth machine, manual cloth machine (also divided into 12 meters, 15 meters, 18 meters three kinds)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Hydraulic Concrete Placing Boom PB24A hot sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords