Manual 12m concrete placing boom for sale
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Manual 12m concrete placing boom for sale
PARAMETERS
Manual concrete placing boom parameters
| |||
Specifications | 12meters manual | 15meters manual | 18meters manual |
The big arm design | Dual channel | Dual channel | Dual channel |
Radius of gyration (m) | 12 | 15 | 18 |
The height of the placing boom | 5 | 5 | 5 |
Diameter of conveying pipe (mm) | 125 | 125 | 125 |
Leg span (m) | 3.2*3.2 | 4*4 | 4*4 |
Rotation Methods | Manual | Manual | Manual |
The whole weight (kg) | 1100 | 1200 | 1300 |
With weight (kg) | 600 | 800 | 1000 |
Slewing bearing type | 315 | 315 | 380 |
Material | Channel angle | Channel angle | Channel angle |
Slewing range | 360° | 360° | 360° |
CHARACTERISTICS
1. Frame arm structure, increasing the loadingcapacity and stability.
2. Highquality rotary bearing, flexible rotation
3. Doublesupporting leg, improve the stability and bearing capacity of double
4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron
5. Minimal impact on the appearance of vibrationforce
6. Withfour rope, ensure that the safety of product using.
PIPE SPECIFICATIONS
12M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 4.24M | 1 |
| 5.6M | 1 |
Delivery Bend | 148-148 R275 90° | 2 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
15M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 5.56M | 1 |
| 5.8M | 1 |
Delivery Bend | 275*90 add pipe | 1 |
| 148-148 R275 90° | 1 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
18M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.7M | 2 |
| 3M | 1 |
| 7M | 1 |
Delivery Bend | R500 90° | 1 |
| R275 90° | 1 |
| R275 90° +130 | 1 |
| 157-148 R275 900 | 1 |
Delivery& packing & payment
1. FOB Tianjin or others.
2. Delivery time: within 15 days.
3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand
4. Payment term: T/T, L/C.
5. MOQ: 1 set or according the actual situation.
- Q: What is the difference between concrete pump truck and concrete distributor in construction?
- Pump car and car pump pump, pump transmission range is relatively large, the past can be connected pipe (in pumping pressure permitting), malpractice is relatively heavy, concrete pouring, people need to arrange to remove pipe, guard, pump handle up too much trouble
- Q: How to fit the cloth rod of the distributor?
- Check whether the bolts of the rod are fully tightened and whether the shaft is normal
- Q: What do concrete pumps and fabrics mean?
- Pump truck, sub drag pump and automobile pump, drag pump delivery range is relatively large, the pipe can be used in the past (in the case of pumping pressure allowed), the disadvantage is that relatively cumbersome,
- Q: What is the working principle of the distributor?
- When removing the cloth should be cleaned of residual concrete pump tube, then the weight of crane removed, then removed from the distributor to the specified location
- Q: How to maintain the concrete spreader?
- Cloth machine material, Doumen hoist hydraulic with accumulator, can quickly open and close, accurate cloth, prevent residual material fall, pneumatic closed lax
- Q: How to distinguish tower type distributor and general distributor?
- Avoid large arm distortion caused by huge pressure and vibration of concrete pump during construction
- Q: What is the structure of a concrete distributor?
- Structure: bolt, and the vertical frame, which is fixed on the base part, through the slewing bearing and the top rotating part is connected on the main beam, and the balance arm, the balance arm rod, such that after the formation of the upper transverse rotating part
- Q: What are the benefits of concrete handling machines?
- Concrete distributor; material ratio; sling construction; fabric safety
- Q: What is the concrete distributor?
- According to the pouring concrete construction environment different and individual requirements, has designed a climbing and walking type, ship type, manual type and other models for the user, the formation of HG series concrete mixer is currently the world's most complete specifications
- Q: What's the design plan of the concrete spreader?
- This design makes the cloth machine walking can be designed like the cloth machine when walking will be required to drag on the tape machine in the tail walking without disassembly will drag on the tape machine in the tail walking without disassembly, or will carry on the tape machine walking in fabric tape machine. The loading or unloading of the belt conveyor is completed by the distributor without the use of auxiliary equipment such as cranes.
Send your message to us
Manual 12m concrete placing boom for sale
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords