Manual 12m concrete placing boom for sale
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Manual 12m concrete placing boom for sale
PARAMETERS
Manual concrete placing boom parameters
| |||
Specifications | 12meters manual | 15meters manual | 18meters manual |
The big arm design | Dual channel | Dual channel | Dual channel |
Radius of gyration (m) | 12 | 15 | 18 |
The height of the placing boom | 5 | 5 | 5 |
Diameter of conveying pipe (mm) | 125 | 125 | 125 |
Leg span (m) | 3.2*3.2 | 4*4 | 4*4 |
Rotation Methods | Manual | Manual | Manual |
The whole weight (kg) | 1100 | 1200 | 1300 |
With weight (kg) | 600 | 800 | 1000 |
Slewing bearing type | 315 | 315 | 380 |
Material | Channel angle | Channel angle | Channel angle |
Slewing range | 360° | 360° | 360° |
CHARACTERISTICS
1. Frame arm structure, increasing the loadingcapacity and stability.
2. Highquality rotary bearing, flexible rotation
3. Doublesupporting leg, improve the stability and bearing capacity of double
4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron
5. Minimal impact on the appearance of vibrationforce
6. Withfour rope, ensure that the safety of product using.
PIPE SPECIFICATIONS
12M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 4.24M | 1 |
| 5.6M | 1 |
Delivery Bend | 148-148 R275 90° | 2 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
15M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 5.56M | 1 |
| 5.8M | 1 |
Delivery Bend | 275*90 add pipe | 1 |
| 148-148 R275 90° | 1 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
18M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.7M | 2 |
| 3M | 1 |
| 7M | 1 |
Delivery Bend | R500 90° | 1 |
| R275 90° | 1 |
| R275 90° +130 | 1 |
| 157-148 R275 900 | 1 |
Delivery& packing & payment
1. FOB Tianjin or others.
2. Delivery time: within 15 days.
3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand
4. Payment term: T/T, L/C.
5. MOQ: 1 set or according the actual situation.
- Q: What are the specifications of concrete spreader?
- Transport pipeline firm in main beam, end 90 degree bend and concrete delivery pipe and the other end is connected at the end of the manual pipe through the activities within the scope of the cloth can be 310 degree bend
- Q: What is the difference between concrete pump truck and concrete distributor in construction?
- Cloth machine, cloth form and automobile pump is similar, it is to use conveyor belt in the state without pressure to transport concrete, cloth machine is relatively heavy, slow walking, and the delivery of concrete material falls easily aggregate segregation
- Q: What are the acceptance items of concrete spreader?
- Good mechanical properties, meet the technical standards in the specification, is strictly prohibited in the pressure pipe and tubing in open pipe joint, no end of the hose, and let the arm pull down another rigid connection pipeline, rotary process, no brakes or do reverse operation in the machine when not parked
- Q: What is a fixed concrete distributor?
- Concrete distributing machine: special concrete pouring equipment for construction, design and production of railway beam yard and nuclear power plant
- Q: How to fit the cloth rod of the distributor?
- Build a frame with a cloth pole for bearing and inspect and check the bearing capacity of the stressed part, the reinforcement condition of the double fasteners and the stability of the foundation
- Q: What are the weekly inspection items for concrete spreader?
- Check connection bolts, shaft end plate, pin shaft, lock nut is loose
- Q: What is the working principle of the distributor?
- In order to ensure the safety of the work procedure, prevent the cloth machine from tipping over and pay attention to the stability of the frame of the distributing machine, the construction can be carried out
- Q: What are the monthly inspection items of the movable concrete spreader?
- Check the rotating reducer for abnormal heating and noise
- Q: How to distinguish tower type distributor and general distributor?
- Avoid large arm distortion caused by huge pressure and vibration of concrete pump during construction
- Q: What's the design plan of the concrete spreader?
- This design makes the cloth machine walking can be designed like the cloth machine when walking will be required to drag on the tape machine in the tail walking without disassembly will drag on the tape machine in the tail walking without disassembly, or will carry on the tape machine walking in fabric tape machine. The loading or unloading of the belt conveyor is completed by the distributor without the use of auxiliary equipment such as cranes.
Send your message to us
Manual 12m concrete placing boom for sale
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords