Class 1 Flexible Duct - HVAC Flexible Aluminum Duct Hose by CNBM in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Zhejiang China (Mainland) | Brand Name: | Hushi lida | Type: | Ventilation |
Packaging & Delivery
Packaging Detail: | one piece one carton |
Delivery Detail: | 10-20days |
Specifications
non-insulated aluminum flexible duct
extension rate:1:10
Low /medium pressure central HVAC system
flame and heat resistant
Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting
Material:
Double layers of aluminum foil reinforced with high tensile spring steel wire
Structure: High elastic wire, aluminum foil. A reinforcement model can be required.
Aluminum foil thickness: 0.035mm
Temperature range: -30°C~+140°C
Maxim Air Flow: 30m/s
Maxim working pressure: 2500 pa
Standard Length: 10m/pc Or as your requirement
Fire resistance: Non flammable.
Normal packing: In carton. Or as your requirment
Application: Low /medium pressure central HVAC system and ventilation system.
Application: Used in gigh pressure,low pressure air conditioner and ventilation system,easy installation, anti-temperature and inflaming retarding etc
Spec. | O.D.(mm) | I.D.(mm) | Length(M/PC) | |
2" | 54 | 50 | 10 | |
2-1/2" | 68 | 64 | 10 | |
3" | 80 | 76 | 10 | |
4" | 106 | 102 | 10 | |
5" | 131 | 127 | 10 | |
6" | 156 | 152 | 10 | |
7" | 166 | 162 | 10 | |
8" | 204 | 200 | 10 | |
10" | 258 | 254 | 10 | |
12” | 310 | 305 | 10 | |
12 1/2“ | 320 | 315 | 10 | |
14" | 362 | 356 | 10 | |
16" | 412 | 406 | 10 | |
18" | 463 | 457 | 10 | |
20" | 514 | 508 | 10 | |
22" | 565 | 559 | 10 | |
24" | 616 | 610 | 10 |
- Q: How to optimize the construction management to improve the quality of construction projects
- I suggest you look at Google, there will be a lot, I hope you can find a satisfactory, I wish you a happy life!
- Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
- The system can avoid the hot bridge in winter, greatly reducing the indoor heat loss through the external walls; summer can greatly reduce the external radiation from the sun to the indoor heat conduction, and thus the heating, air conditioning energy consumption decline
- Q: Talk about the class flexible management of the class teacher what the requirements
- National Standard B Administrative Regulation C Industry Code D Normative document Local regulations which of the following are safety technical standards? (ACDE) A Code for safety of construction work JGJ80-91B Construction Engineering Supervision Standard Safety code for construction machinery use JGJ33-2001D Standard for Safety Inspection of Building Construction JGJ59-2011E Tower crane safety regulations GB5144- from the 90's onwards, the Ministry of Construction have prepared a number of building safety technology standards, including (ACDE) A Building construction safety inspection standard B Measures for the Administration of Construction Permit for Construction Works Technical Specification for Safety of Fastener Steel Scaffolding for Building Construction Gantry and derrick material hoist safety technical specifications "the State Council on the further strengthening of production safety decision" (Guo Fa [2004] No 2) pointed out: to strive to build (ABCDE) of the safe production work pattern A Government united leadership Department of supervision according to law The enterprise is fully responsible for D Mass participation in supervision The whole society is widely supported according to the Ministry of Construction on the construction enterprises and the safety of production and management of the main responsibilities of the production of the following responsibilities (ABCD) A Implement national laws and regulations on safe production and standard B Prepare and timely update the safety management system Organize the full safety education Organize security checks Organize the preparation of special construction program
- Q: Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
- Usually in accordance with cubic meters or kilograms to calculate the price
- Q: Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
- According to the intrinsic composition of insulation materials can be divided into: inorganic insulation materials and organic insulation materials! Fire rating A is a non-burning point with the insulation effect of materials, materials. Class A non-combustible materials have the characteristics of low density, low thermal conductivity, high pressure capacity, convenient construction, economical and durable. They are widely used in thermal insulation materials and industrial industries such as hot pipes, thermal equipment and other industrial piping equipment and industrial buildings And the civil building envelope structure of the insulation, insulation, sound absorption materials. Because of its good thermal stability, and more for the steel structure of the fire protection coating material. Fire rating B1 level is a flame retardant insulation material, is determined according to the fire resistance of the material, in addition, different parts of the material division is also different! Burning performance: refers to the material and / or products in case of fire burning all the physical and / or chemical changes, that is, the fire reaction characteristics. Fire rating B2 is a combustible insulation material also known as flame retardant materials, mostly organic insulation materials, add the right amount of flame retardants. More common for EPS expansion polystyrene board and XPS extruded polystyrene board, that is, we often say that general board. This material is low in ignition and releases a lot of harmful gases during the combustion process. Fire rating B3 is a flammable insulation material, this is more common as the main material of polystyrene foam insulation material, because this material is easy to burn,
- Q: Is the clamp type flexible connector connected to the pipe to the rubber pad?
- 1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
- Q: Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
- When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long and 4m each) and the fasteners are transported to the hanging plate of the frame
- Q: The first generation of the tube is that year out?
- In general, there is also a strong ability to resist, it is likely that there may be cracking
- Q: To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
- The radial force of the seal is far greater than the axial force of the connecting bolts but all the axial force washers 窢 field urging 讵 peculiar aldehyde support, good self-sealing effect by the pipeline through the media rubber ring pressing force pressure more sealing performance of the more pressure to prevent the pressure of the rubber ring to the inner diameter of the tube end of the interface diameter Preload to prevent the media pressure leakage and the blue compared to the higher the pressure of the pipe the more the advantages of the more dangerous the pipe junction at the flexible state of the clamp and the tube between the gap between the clamp clamp a small number of adjacent pipe to allow the corner tube Pipe pipe between the end of the gap to allow the axial shift of the pipeline to adapt to the expansion and contraction of the pipe; pipe interlocking effect reduced 70% mechanical vibration
- Q: Maintenance Skills of Leakage of Fire Pipe Clamp Joint
- When connecting, first thread the bottom of the connector, and then screw the tapping screw into the threaded bottom hole of the connected part. As the tapping screw thread surface has a high hardness (≥ 45HRC), can be connected to the threaded bottom hole in the internal thread, thus forming a connection.
Send your message to us
Class 1 Flexible Duct - HVAC Flexible Aluminum Duct Hose by CNBM in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m
- Supply Capability:
- 50000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords