Hoisting Mechanism 75JLF45
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction
The products are independently developed and manufactured by our company via absorbing international and domestic advanced technologies.
Natinal Patented products:Patent 1:ZL2009 2 0243653.7
Hoisting Mechanism of Tower crane Patent 2:ZL2010 20226428.5.
Combined-type winding drum used in winch JLF series products adopt the structural style of variable frenquency motor +SNGW reducer+winding drum.S-NGM reducer is employed for the first time in China with the precision of all gears up to over 6 level and features of less noise, compact structure, light weight and convenient maintenance.
Specification
Model:75JLF45
Rated single rope tension(kN):45
Magnification:4
Rated power of the motor (kW):75
Working frequency(Hz):6-50-100
Hoisting speed (m/min):2.7-22-45
Hoisting capacity(t):16-16-8
Rope capacity(m):550(5 layers)/804(7 layers)
Nominal Diameter of wire rope (mm):Φ20
- Q: i want to go to school and learn to operate over head cranes
- No. they can't chew human beings. The lengthy pointy bit on the lower back isn't a sting both. it truly is an ovipositor, designed to allow the Crane fly to position her eggs in the soil. The eggs hatch out into leather-depending Jackets, gray grubs who devour the roots of grass. once you spot starlings and different birds on a backyard poking bout into the floor, it truly is what they're searching for, effective tasty leather-depending Jackets. leather-depending Jackets make the grass of a backyard pass yellow, and die. they're pests, notwithstanding the Crane fly is purely tense even as it comes interior.
- Q: How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
- The independent height of the tower crane is determined by the manufacturer's manual. The independent height of the tower cranes of different manufacturers and different types is different. The installation of the tower crane needs to be installed with a wall rod. The specifications are stipulated in the instruction. The national standard requires the instruction of the manufacturer's manual.
- Q: I have to build a hydralic system that can pick up a paper clip . the supplies you are allowed to use are 10 straws, 5 pipe cleaners, 1 yard of masking tape. 10 note cards. 2 syringes and tubing. 5 rubber bands. 8 popsicle sticks. 2 feet of string. 1 magnet. Please help.
- build a basic crane out of your materials and thread the string to the magnet hold it on with tape secure opposite end of the string to the plunger on one syringe. and fix this syringe(syringe 1) to the frame of the crane. position the plungers of both syringes at mid point, and fill both with water, and fill your tubing with water. connect the needle ends of both syringes together with the tubing. pushing the plunger on syringe 2 will cause the plunger in syringe 1 to move out. pulling the plunger on syringe 2 will cause the plunger on syringe 1 to retract and can be used to lift the paperclip.
- Q: Construction tower crane operator certificate expires, how to verify?
- Two, training contentThe crane safety regulations and operation management; classification and main parameters of the crane; the structure and the working principle and the safety protection device of lifting up; the installation and removal of heavy machinery; the whole debugging and acceptance of heavy machinery; the operational and command signal of lifting and repair; and maintenance of heavy machinery.Three, training hours and full-time training arrangement: 5 days, annual training enrollment.Four, training fees450 yuan / person, including registration fees, training fees, books, information, assessment, assessment fees, accommodation, self-care.Five, training certificationStudents complete the prescribed courses, through the examination, after passing the examination by the Municipal Construction Commission issued a number printed and stamped with the "Chongqing City Construction Management Committee of" legal. "Chongqing construction tower crane operator qualification certificate".
- Q: Are the creators of the Karate Kid movies apologetic about the white crane defensive stance?
- Why should they be? That stance is from an art that is practiced by a small number of practitioners in Okinawa known as Hakutsuru, which means White Crane. It was hollywood-ized... so what? The original movie was written by a practitioner of Goju Ryu, who trained in NYC under an instructor from the Bronx named Kao Loong Ong. He knew there was a link between White Crane and the development of Okinawan Karate. Robert Kamen trained with Kayo, as he is known, who is Chinese and is well known in NYC's China Town. If they should apologize, hollywood must apologize for their misrepresentation of SO many things - insults to practically all the cultures of the world.
- Q: my overhead crane refuse to work transvesely
- Limit switch replacement requires adjustment of the cranes travel limits. The limits are imposed by the manufacturer for the application. This service is normally factory authorized only.
- Q: It frustrates me every time I play one of those games i never win. Is there a secret? If so then what is it?
- It depends which type of animal crane you are talking about. If it's the jumbo cranes that pick up the huge stuffed animals, they are actually set to give out a win every so many plays, however the number of the winning play varies based on the location. If you are talking about the average sized cranes, the key is to look for a stuffed animal that is light up on top and bottom heavy. This will allow you to grab ahold of the head or neck and pick the animal up. I've found the easiest cranes to win on are the ones that you pick up beanie baby sized stuffed toys. They seem to win, every time you aim the crane to pick up the head or neck. It's a great way to rack up a lot of stuffed animals. While they may not be huge prizes they are reasonable ones, and some of them are pretty cute.
- Q: dynamic force on crane when a load of 37k falls 1',2' 3'or 4'?
- Need more information. In general, the answer is that the dynamic load depends on how quickly the payload decelerates. The dynamic load will be the mass of the payload times the peak deceleration rate. In a strength calculation, do not forget to include the static weight component of the load. The deceleration depends on the elasticity of the cables supporting the load. If the crane has a flexible supporting structure, then that could also affect the result. (You didn't say whether the crane is the traveling overhead hoist type usually seen in a factory - which typically has a stiff support - or the cantilevered truss type seen on construction sites - where the support might have a little flexibility.)
- Q: how do you say paper crane in japanese?
- Japanese Word For Crane
- Q: Answer please~
- Yes they do
Send your message to us
Hoisting Mechanism 75JLF45
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords