• HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 007 System 1
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 007 System 2
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 007 System 3
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 007 System 4
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 007 System 5
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 007

HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 007

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Q:What is the difference between land valuation and real estate valuation?
Land valuation is based on the principles, theories and methods of land valuation
Q:What is the gross margin of the real estate industry?
Real estate development profits generally 20% -40%, how much less, mainly to see how to control costs
Q:What is the status quo of China's real estate market?
At present, China's real estate industry by the economic environment, political law, social and cultural and technological environment and other aspects of the tremendous changes
Q:Real estate, people often say 'case' is what it means
Such as the case of sales salesman is known as the new sales of commercial housing sales office or sales lady.
Q:What is the real estate from the law?
that is, land (or land use rights), buildings and premises in a state of physical entities and their rights and interests.
Q:Determine what long-term factors in our housing market?
these factors not only did not change, but also in the future will play its role. These factors include:
Q:What is the real estate level market secondary market three market
The real estate first-level market, also known as the land first-level market, is the land use right to sell the market
Q:Real estate in the "five card" which five?
transfer of land before the city planning and administrative departments to confirm the location and scope of construction projects in line with the city planning legal certificate;
Q:What conditions should a real estate agent have?
What is the success of the line can be easily achieved? If every list is smooth, never refused
Q:What are the categories of real estate?
As the real estate is composed of land and ground buildings, structures, for land and housing can be classified according to the following methods:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches