HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 007
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: China's real estate market began to develop rapidly is what year
- 1991 to 1995 irrational speculation and adjustment stage, Deng Xiaoping Southern speculation after the southern real estate speculation prevailed, the final hard landing, real estate into a downturn
- Q: What conditions should a real estate agent have?
- especially just out of the school to work on the young people should have the ability
- Q: What is the status quo of China's real estate market?
- The country's macro-control and related government departments are also increasingly rule-based supervision
- Q: What is the land deed tax rate for real estate?
- donation and exchange, housing sale, house donation and house exchange need to pay deed tax; In the current, real estate enterprises to pay land tax is 3%.
- Q: What is the real estate industry?
- real estate intermediary services, including real estate consulting, valuation and brokerage agents, property management.
- Q: What is the real estate industry?
- commissioned planning and design, organizational development and construction of the old city land redevelopment;
- Q: What is the real estate level market secondary market three market
- that is, the state through its designated government departments will be urban state-owned land or rural collective land requisition for state-owned land to sell to the user's market
- Q: How can we do real estate?
- because life will only change with self-change, only to continue to learn, can firmly based on this society
- Q: How is China's housing market in other aspects ?
- First, the proportion of high-end residential will decline, the proportion of affordable housing and low-rent housing will rise
- Q: Kentucky is selling real estate how to understand?
- because he knows the property and location will be the success of each branch of the most important Factor
Send your message to us
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 007
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches