• Heat Shrink Tube System 1
Heat Shrink Tube

Heat Shrink Tube

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

RU 200 A 15, 25, and 35 kV Loadbreak Elbow Connectors and Accessories are submersible, fully-shielded and insulated plug-in terminations, ideal for connecting underground cable to transformes, switchgear, sectionalizing cabinets and junctions. These connectors are molded using high-quality, peroxide-cured EPDM insulation for reliable field performance.

15 kV and 25 kV loadbreak elbows are available with an integral jacket seal for use with concentric neutral and other types of shielded cables.

All 200 A loadbreak connectors meet the electrical, mechanical, and dimensional requirements of IEEE Std 386™ standard and are designed to be fully interchangeable with other major manufacturers currently complying with IEEE Std 386™ standard.




Q:Apple 6splus charge may not support this accessories how to do more
5 small cable, if you feel high cost Can be from the distribution box to the circuit The first light using a small cable low-voltage bus to the equipment side, due to the power distribution room to the equipment side will appear more climbing, bus installation climbing very troublesome and affect the beautiful, The bus outlet cabinet uses cables and installs the transfer box on the busbar
Q:What is the difference between wires and cables?
The introduction of the device is to introduce the cable into the electrical equipment, without changing the explosion-proof type of explosion-proof equipment
Q:What are the T and T, s of the wire and cable test type?
The expression is not very clear, it should be said to wear a tube, if a single wear on the line 100. Outside diameter 60mm.
Q:The data line is my online to buy the extension of the line, has been able to use, and today suddenly can not charge the electricity, and pop up the tips, which is why? More
What do you want to do? Do network cabling buried? Or in the building after the tube?
Q:Decoration when the purchase of water pipes, wires and other items included in the account
KVV is the control cable, generally do industrial control; and RVS is twisted pair, generally used for weak system, to eliminate the interference requirements of the occasion, such as two-wire bus system, specifically, the electrical fire bus more Such as RS485 bus and so on.
Q:Why does the bird stand on the wire without anything, but if people touch it,
Please provide air-conditioned three-leg socket photo, because you said "open inside is 2.5 square line ~ is a separate line ~" is not very understanding.
Q:Engineering materials inspection, all types of cable wires should be issued a test report?
LCD TV can not be connected to the top of the box and DVD reasons: the connection line is wrong, you need to re-connect the video cable or high-definition multimedia interface line, component color line. . the first audio and video cable to DVD and LCD TV ("video 1" or "DVD" signal source); . Moreover, the set-top box and LCD TV (HDMI1 . the LCD TV, DVD and set-top box power are open; . according to the source selection, if you want to watch the DVD program, put the signal source to switch to the "high-definition multimedia interface cable (HDMI cable) Video 1 ", if it is to see the set-top box program, put the signal source to switch to" HDMI1 ". . so that put DVD and set-top boxes are also connected to the TV.
Q:Four lines only reached a phase line, at the other end all charged, I use the digital pen! In addition, I often check the cable when the cable current through the dot digital pen voltage symbols sometimes have time to disappear, in other bare wires when the test keys are normal! What is this going on! Ask the heroes to give the younger brother a complete point of the answer! More
Bookstore tool book should have "communication project budget", I do is what you say, the budget is divided into estimates and budget, is two steps. So that is not very clear. But what is needed is the preliminary design of the project. The budget is needed for design and drawings. Internal management of this piece, the main thing is that you need to do what the project department, and are generally very complicated
Q:Apple phone display cable or accessories not certified how to do
and then the audio cable and video cable [audio line (red and white), the first time the signal line (white) Video line (yellow)】 corresponding to the color connection set-top box with TV
Q:Cable a fire line power and why the other did not pick up the line with a pen test also have electricity? Answer detailed point
Cable is a unified call, including power cables, communication cables, etc., I do not know what type of cable you need the type specifications. On the power cable in terms of the main models are: VV, BJV, VV. BJV. . ZR, NH and other models, as the specifications that too much.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords