Quick Details
Model Number: KS
Type: Kwikstage scaffold
Surface: paint/ galvanized
Material: steel
Standard: AS/NZ 1576
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: KS
Type: Kwikstage scaffold
Surface: paint/ galvanized
Material: steel
Standard: AS/NZ 1576
2.Packaging & Delivery
Packaging Details:pallet
Model No: RS
Product Name: Ringlock scaffolding system
3.Features:
1. Standard: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000, 500mm etc. Available, and can be to ordered by you,
2. Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.
3. Ring: Made from cast-steel or pressed steel
4. Ledger connection-peg: made from cast-steel,
5. Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.
6. U head screw jack: length600mmx3.5mmthickness strength tube with U head plate, length can to be order, solid tube available.
7. Surface: painted/electro (hot dipped) galvanized or to be order
8. Also can manufacture it as your requirement.
Ring Lock System Scaffold Ledger / Horizontals | |||
Model | Description | Weight(kg) | Weight(lbs) |
AR.L.3050 | Ring Lock Ledger 3050mm (10') | 11.66 | 25.74 |
AR.L.2745 | Ring Lock Ledger 2745mm (9') | 10.57 | 26.74 |
AR.L.2440 | Ring Lock Ledger 2440mm (8') | 9.47 | 20.88 |
AR.L.2130 | Ring Lock Ledger 2130mm (7') | 8.36 | 18.43 |
AR.L.1830 | Ring Lock Ledger 1830mm (6') | 7.28 | 16.06 |
AR.L.1520 | Ring Lock Ledger 1520mm (5') | 6.17 | 13.61 |
AR.L.1220 | Ring Lock Ledger 1220mm (4') | 5.10 | 11.24 |
AR.L.1150 | Ring Lock Ledger 1150mm (3'10") | 4.84 | 10.68 |
AR.L.1065 | Ring Lock Ledger 1065mm (3'6") | 4.54 | 10.01 |
AR.L.910 | Ring Lock Ledger 910mm (3') | 3.98 | 8.78 |
AR.L.650 | Ring Lock Ledger 650mm (2'2") | 3.05 | 6.73 |
AR.L.610 | Ring Lock Ledger 610mm (2') | 2.91 | 6.41 |
5.What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords