• HD Galvanized Cuplock Scaffold Working Platform System 1
  • HD Galvanized Cuplock Scaffold Working Platform System 2
  • HD Galvanized Cuplock Scaffold Working Platform System 3
  • HD Galvanized Cuplock Scaffold Working Platform System 4
  • HD Galvanized Cuplock Scaffold Working Platform System 5
  • HD Galvanized Cuplock Scaffold Working Platform System 6
HD Galvanized Cuplock Scaffold Working Platform

HD Galvanized Cuplock Scaffold Working Platform

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

HD Galvanized Cuplock Scaffold Working Platform


Specifications

Cuplock scaffold platform 
1)Cuplock ledger,standard,walkboard 
2)Hot-dip galvanized 
3)10 years' OEM

4)Commodity

 

HD Galvanized Cuplock Scaffold Working Platform

HD Galvanized Cuplock Scaffold Working Platform


Description of goods

1)Raw material:Steel grade Q235 or Q345

2)Surface treatment:Hot-dipped galvanized

                             O.D:48.3mm thickness say 3mm/3.2mm

3)A set of cuplock scaffold consists of ledger,stand,plank;

 4)OEM for 10 years.                    

 

Inspection

We adopt Japanese style for inspection procedure.

 

Export

our products to USA, Canada, Japan,South America,etc

With export ownership,we export directedly to our client.

 

Please note that we are a manufacturer with large production capability in Jiangsu near Shanghai, China.

For more information, please make an enquiry here.


FAQ:

Why Us?

We are one of the Top 500 companies in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.


Q: PLEASE HELP!!!
maybe the fact that it marked the point where she began to see things from a different perspective than the colonists (figuratively and literally) Hawthorne later says that she began to think unnatural thoughts for a colonist..... Hope this helps, we didn't really discuss this while we read it ^_^
Q: It's indoor. A night-job in a mall so it should be easily assembled/disassembled. What we use is the thin piped one which is too dangerous for 12 meters high.
I don't know what you have to do and with how many people, but in case of easy assembly/disassembly, I'd recommend an Aerial work platform.
Q: If I built a box using standard diameter scaffolding tube (48mm) and connected it using kee clamps rather than standard scaffolding connectors, do you think it would be strong enough to support a 2000lb bar being dropped on it from a 2m height without breaking? I want to build it without welding, but am concerned over the strength of such a box connected only with kee clamps.
though that page doesn't seem to be quite complete
Q: The bowl locking conditions of scaffolding, to detect what hand to try, or with what tools?
Scaffolding is relatively new, the old one is round new CD, is surrounded by four jacks, which is used more and more tight, do not need what tools!
Q: I pierce and I have 20 piercings. I've wanted this piercing for like 2 years, and about 3 days ago i finally did it =]I just wanted to know what you think.
I think the positioning is ok. It just look different because of the other piercing next to it. Over all your piercings are cool !
Q: How to calculate the cost of scaffolding
The majority of bridges and supporting the use of scaffolding is mostly subject construction of gate type scaffold floor scaffold use scaffolding, scaffolding pole of the vertical distance of 1.2-1.8m rail distance is 0.9-1.5m
Q: Hey I need a quot;letter to the editorquot; scaffold for english homeowrk. Can anyone help?
OK, I'm really confused. Exactly WHAT are you looking for? An existing letter? A format on how to write a letter? Or for us to write one for you (good luck with THAT!)?
Q: why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q: A) what is the velocity of the brick after 4.0 s?B) how far does the brick fall during this time? This is using 9.8 m/s^2 as the acceleration
Since acceleration is constant which is 9.8 m/s^2, the velocity increases by the fixed 9.8 amount every second, so: A) v = v0 + gt = 0 + 9.8*4 = 39.2 m/s where v0 is initial speed which in this case is zero. B) We use constant acceleration equation: x = x0 + v0*t + 1/2gt^2 = 1/2 gt^2 = 1/2 *9.8 * 16 = 8*9.8 = 80 - 1.6 = 78.4 m
Q: Should I work Offshore or Scaffold?
offshore for sure buddy,,scaffolding is a pain sometimes,,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords