HB41 concrete pump adopts Hino FSIERV (6X4) three-axle chassis
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Travel | ||||||
---|---|---|---|---|---|---|
Category | Item | Unit | Parameter | |||
Chassis | Model | FS1ERV | Actros3341 | FM | ||
Manufacturer | Hino | Germany BENZ | VOLVO | |||
Max. speed | km/h | 85 | 85 | 90 | ||
Max. gradeability | 46.30% | 61.90% | 30% | |||
Min. turning diameter | m | 17.8 | 19.8 | 18.4 | ||
Brake distance | m | ≤7 | ≤7 | ≤7 | ||
Wheelbase | mm | 4640+1310 | 4500+1350 | 4900+1370 | ||
Tread (front/rear) | mm | 2050/1855 | 2034/1804 | 2019/1834 | ||
Approach angle/departure angle | 。 | 22/10 | 16/10 | 18/10 | ||
Min. clearance | mm | 245 | 300 | 270 | ||
Tyre specification | 295/80R22.5 | 315/80r22.5 | 12.00R20 | |||
Engine | Model | E13C TL | OM501LA.|||/17 | D13 | ||
Output power | kw/(r/min) | 302/1800 | 300/1800 | 294/1800 | ||
Max. torque | N.m/(r/min) | 1618/1100 | 2000/1080 | 2000/1050 | ||
Displacement | │ | 12.9 | 11.946 | 12.8 | ||
Emission Standard | Nation III GBIII | Nation III GBIII | Nation III GBIII | |||
Other | Dimension (length x width x height) | mm | 11100x2500x3990 | 11060x2500x3990 | 11350x2500x3990 | |
Total vehicle weight | kg | 30500 | 30600 | 31400 | ||
Fuel tank capacity | │ | 400 | 400 | 400 | ||
Fuel consumption per 100km | │/100km | 33.3 | 40 | 40 | ||
Pumping operation | ||||||
Category | ItemITEM | UnitUNIT | ParameterPARAMETER | |||
Pumping system | Theoretical output(high pressure/low pressure) | m³/h | 70/140 | |||
Concrete pumping pressure(high pressure/low pressure) | Mpa | 11.8/6.38 | ||||
Theoretical pumping times(high pressure/low pressure) | 次/min | 15/27 | ||||
Max. diameter of pumping concrete aggregate | mm | 40 | ||||
Feeding height | mm | 1530 | ||||
Pumping slump range | cm | 12月23日 | ||||
Placing boom | Reach height | m | 40.5 | |||
Reach depth | m | 27.5 | ||||
Slewing radius | m | 36 | ||||
Slewing angle | 。 | ±270 | ||||
1st boom stretch angle | 。 | 90 | ||||
2nd boom stretch angle | 。 | 180 | ||||
3rd boom stretch angle | 。 | 180 | ||||
4th boom stretch angle | 。 | 240 | ||||
5th boom stretch angle | 。 | 250 | ||||
Outrigger span | Outrigger longitudinal span | mm | 7800±50 | |||
Front outrigger transverse span | mm | 8350±50 | ||||
Rear outrigger transverse span | mm | 7200±50 | ||||
Other | Dosing type | S valve | ||||
Lubricating method | Automatic lubrication | |||||
Controlling method | Manual/remote control | |||||
Water tank capacity | | | 600 | ||||
Max. pressure of water pump | Mpa | 2 |
HB41 concrete pump adopts Hino FSIERV (6X4) three-axle chassis, excellent power performance and good economics. Front X type outrigger could operate on one side, and open semi-outrigger in narrow area. 5-section RZ type folded boom needs small space for boom folding and unfolding. The main vehicle pumping adopts opened delivery technology, fully hydraulic reversing technology, ·intelligent pumping damping technology, small pumping reversing impact. The concrete piston could withdraw automatically. The electrical system adopts PLC control with color display screen, showing the running parameters of the equipment. The application of the engine energy saving technology and trouble-shooting technology improves the economics, reliability and safety of the concrete pump.
It is the first 40m concrete pump with three-axle chassis in China, and the first machine adopting X type outrigger, and the first concrete pump adopting 5-section RZ type folded boom for 40-m level in China.
- Q: If I use Mobil Steyr engineering machinery oil, the most suitable collocation way??
- Engineering machinery with black Mobil Steyr 15W40 fighter CG-4 OK
- Q: Farmers lack style and imagination. All they care about is profit. Why are there none who develope implements that are nice looking and truly distinctive? Don't they feel embarrassed riding such hideous looking contraptions?
- I think the world survives on the products they produce and the service they provide. It is very stereotypical of your kind to question the manner in which it is provided. You need to think about the intelligence level of your question and consider why the world considers you inferior.
- Q: In law, how many years of depreciation of construction machinery? (excavator)
- (1) housing and buildings for 20 years; (two) aircraft, trains, ships, machinery, machinery and other production equipment for 10 years;
- Q: How long is MOS school for a mechanic in the Marines? Heavy machinery?
- what is the MOS designation? i have a current pdf of MOS schools/stationed bases.
- Q: i need the jetty construction machinery for jetty construction on the island?
- A jetty normally has a piled foundation, so assuming that you have a suitable seabed. Some form of piledriver or water / air jetting device to install the piles. This will depend on their loading requirements. A crane to assist with the decking. For a simple jetty you may be able to use manpower. Some more information about the size of the jetty and its future use would be useful for a more complete answer
- Q: Just thread pipes?Is that all they do because thats what I keep hearing
- The duties performed by MRs include: repairing and operating auxiliary machinery; calculating time and material needed for machine shop work and the repairing of auxiliary machinery; drawing sketches and preparing specifications for replacement parts; working from sketches and specifications to produce replacement parts; operating machine shop equipment, such as lathes, drill presses, shapers, bench grinders, milling machines, boring mills, power hacksaws and computer numerically controlled machinery; working with precision measuring instruments such as micrometers, depth gauges, verniers, calipers, gauge blocks, protractors and dial indicators; engraving metal and other materials; performing electroplating and flame spraying operations.
- Q: I work at a pizza place, and while washing dishes, a cheese grater fell off the shelf and broke. A piece that is important to the cheese grater's functioning. Now, mind you, it fell off the shelf and I was not touching it. My manager wants me to either pay cash, or he will just deduct it from my check, when I argued with him that it is a cost of doing business.Is this legal, and what sound I do?
- illegal. he can fire you, but may not deduct from your wages.
- Q: On July 23 of the current year, Serena Mining Co. pays $4,612,500 for land estimated to contain 5,125,000 tons of recoverable ore. It installs machinery costing $512,500 that has a 10-year life and no salvage value and is capable of mining the ore deposit in eight years. The machinery is paid for on July 25, seven days before mining operations begin. The company removes and sells 490,000 tons of ore during its first five months of operations ending on December 31. Depreciation of the machinery is in proportion to the mine's depletion as the machinery will be abandoned after the ore is mined.how to calculate the first five months depreciation on machinery??
- While the machinery has a ten year life, it will only be used for eight years and then become abandoned. So we first do $512,500 - $0 and then divide by 8 years to get $64,062.50. That's how much depriciation the machinery accumulates per year. Since we're looking for the first five months of accumulated depreciation, we take $64,062.50 and multiply it by (5/12) months. That comes out to $26,692.71.
- Q: Other than using a freezer, what are the ways that you can make ice without machinery?
- Making Ice With Fertilizer
- Q: Why is it anyone elses business? Studies have proven time and time again that drug testing is useless for determining preformance.
- Hey - welcome to the twenty-first century! We are in the age of the new prohibition. You are EVIL if you take drugs - don't you know that? EVIL!!!! FP
Send your message to us
HB41 concrete pump adopts Hino FSIERV (6X4) three-axle chassis
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords